The periodic inspection found the following:
1) In various locations, such as pipe fittings, floor tiles and mastic, and roof joints, asbestos containing materials were found to be in fair condition with some damage.
2) Recommendations were made for operation and maintenance to address shrinking pipe insulation joints and damaged floor tiles.
3) One area of pipe elbows by a boiler room required repair work due to damage.
The periodic inspection found the following:
1) In various locations, such as pipe fittings, floor tiles and mastic, and roof joints, asbestos containing materials were found to be in fair condition with some damage.
2) Recommendations were made for operation and maintenance to address shrinking pipe insulation joints and damaged floor tiles.
3) One area of pipe elbows by a boiler room required repair work due to damage.
Copyright:
Attribution Non-Commercial (BY-NC)
Formati disponibili
Scarica in formato DOC, PDF, TXT o leggi online su Scribd
The periodic inspection found the following:
1) In various locations, such as pipe fittings, floor tiles and mastic, and roof joints, asbestos containing materials were found to be in fair condition with some damage.
2) Recommendations were made for operation and maintenance to address shrinking pipe insulation joints and damaged floor tiles.
3) One area of pipe elbows by a boiler room required repair work due to damage.
Copyright:
Attribution Non-Commercial (BY-NC)
Formati disponibili
Scarica in formato DOC, PDF, TXT o leggi online su Scribd
AHERA 6 MONTH PERIODIC INSPECTION AND ASSESSMENT OF ACBM
INSPECTION DATE 7/10/2011 LEA LEAHutchinson HutchinsonPublic PublicSchools Schools Building Building Name Name ParkHigh Elementary School (Please make additional copies of this page for buildings with more homogeneous areas than spaces provided. Please number pages in the space below.) PERIODIC INSPECTION RESULTS Page 1 of 1 Inspectors Name: Brian Parrie Training: Building Inspector Cert. #AI11154 Location and Homogeneous Asbestos Containing Building Material Assessment/ Recommendation Materials Area Visually Inspected? Assumed Friable Change in Damage Recommendation: ACBM? ACBM? condition. Condition Repair/O&M/ Yes No Yes No Yes No No D SD Remove Yes No Hardfloor 9X9 fittings tile& Through out X x x x x x Elbow by boiler O&M mastic x room, Repair 9X9 floor Pipe Lagging tile& Throughout X xx x x x x A few O&Mjoints mastic x shrinking Hardfloor 9X9 pipetile& fittings KOA-F X x x x O&M mastic x Millboard 12”X12” floor tile KOD X x x x O&M Insulation and mastic xx Preformed Misc. TSI lagging X x xx O&M x xx Preformed lagging Vibration boots X xx x O&M x xx TSI Sink liner X x x O&M x xx Jointsdrains Roof and fittings X x x O&M xx xx Spray-on Coving acoustic and mastic X x xx O&M x xx
Note:
Note:
Advanced Health, Safety and Security
Page 2 of 2
AHERA 6 MONTH PERIODIC INSPECTION AND ASSESSMENT OF ACBM
INSPECTION DATE: 7/10/2011 LEA: Hutchinson Public School Building Name: West Elementary (Please make additional copies of this page for buildings with more homogeneous areas than spaces provided. Please number pages in the space below.) PERIODIC INSPECTION RESULTS Page 1 of 1 Inspectors Name: Brian Parrie Training: Building Inspector Cert. #AI11154 Location and Homogeneous Asbestos Containing Building Material Assessment/ Recommendation Materials Area Visually Inspected? Assumed Friable Change in Damage Recommendation: ACBM? ACBM? condition. Condition Repair/O&M/ Yes No Yes No Yes No No D SD Remove Yes No Floor Tile and 18 X x x x O&M Mastic x