Kaizen Idea Sheet

Put Green colour in the block to Mark Activity and Results Area

Category : A / B (Tick Mark) Activity KK JH QM PM SHE OTPM DM ET 5S QCC


KAIZEN NO : Loss No./
Step
Department/Section : Engineering Result Area P Q C D S M E

Plant : Emami Masat Machine/Area :Boiler/utility


Kaizen Theme: To Reduce energy cost at masat unit Idea: Use of Furnace oil instead of L.D.O. which is cost effective & install automatic power factor controller

Problem/Background:At masat unit as boiler fuel Countermeasure: For switching over fuel necessory Benchmark 1)operating cost of boiler @L.D.O. cost @ 37/kg
modification required done.1)Electric heater provided in 2)Power factor - 0.85
consumption is high due to vapour absorption
stoarage tank & Day tank 2)insulation to be provided 3)Heat
chiller,operting cost of boiler is very high.
tracing to be done on transfer line from storage tank to day Target 1)operating cost of boiler @F.O. cost @ 28/kg
tank 2)Power factor - 0.99
Kaizen Start Jan-10

Kaizen Finish Mar-10

Team Members: Kaushal desai,manhar lad,keyur bhatt

Benefits: Reccuring saving every year @ 9 Rs /kg for


approx 2,00,000 kg consumption & Saving of 11% in
electricity bill

WhyWhy Analysis/Analytical Tool used: Results: Saving in Boiler operating cost & Saving in
1)Why why analysis 2)cause & effects electricity bills

Horizontal Deployment plan


S.No. area Target Responsib
Date ility Status