11KV Line Poles Erection (8-Mtr Long PCC Pole) Wth Stone pad ,Boulders,
1 No's 450
Barbed Wire& Danger Board
2 Fixing of V-Cross Arm &Top Cleat Including Insulator. Set 25
6 Erection of 9-mtr Rail Pole With Concrete Including Fixing Of All Materials. No's 1800
7 Erection of 11-mtr Rail Pole With Concrete Including Fixing Of All Materials. No's 2500
8 Erection Of D.P Structure( 8-mtr PCC Pole ) 4' Center With Concreting. No's 1800
9 Fixing Of M S Material,Pin & Disc Insulators With HardWare For D.P. Set 700
10 Erection Of TP Structure(8-mtr PCC pole) With Concreting. No's 2700
11 Fixing Of M S Material,Pin & Disc Insulators With HardWare For T.P. Set 1050
13 Fixing Of M S Material,Pin & Disc Insulators With HardWare For 4-P. Set 1400
14 Excavation and Concreting of stay rod with base plate (H T & L T). No's 400
15 Fixing of clamps,bow,eyebolt,guy etc.including stay wire for stay set. Set 100
Revised Rate
550
25
25
25
25
2300
3100
2000
800
3000
2400
4000
1600
500
150
3600
300
2000
1250
500
500
1300
350
550
25
25
1200
900
15
150
50
450
Contractor