ATJY- PROJECT, BEMETAR

Sub -Contractor Rates List

SL.N Present
Discription Unit Qty
O Rate

11KV Line Poles Erection (8-Mtr Long PCC Pole) Wth Stone pad ,Boulders,
1 No's 450
Barbed Wire& Danger Board
2 Fixing of V-Cross Arm &Top Cleat Including Insulator. Set 25

3 Fixing of Raising Cross Arm Including Insulators. Set 25

4 Fixing of3-pin Cross Arm Including Insulator. Set 25

5 Spiral Earthing With coal. No's 25

6 Erection of 9-mtr Rail Pole With Concrete Including Fixing Of All Materials. No's 1800

7 Erection of 11-mtr Rail Pole With Concrete Including Fixing Of All Materials. No's 2500

8 Erection Of D.P Structure( 8-mtr PCC Pole ) 4' Center With Concreting. No's 1800

9 Fixing Of M S Material,Pin & Disc Insulators With HardWare For D.P. Set 700
10 Erection Of TP Structure(8-mtr PCC pole) With Concreting. No's 2700

11 Fixing Of M S Material,Pin & Disc Insulators With HardWare For T.P. Set 1050

12 Erection of 4-pole Structure(8-mtr PCC pole ) with Concreting . No's 3600

13 Fixing Of M S Material,Pin & Disc Insulators With HardWare For 4-P. Set 1400
14 Excavation and Concreting of stay rod with base plate (H T & L T). No's 400

15 Fixing of clamps,bow,eyebolt,guy etc.including stay wire for stay set. Set 100

16 Stringing of H T line with Rabbit conductor including wedge connectors. KM 2700

17 Arranging of Carpet gaurding. Span 300


18 T/F D P Structure (8-mtrrr PCC Pole) 8' center with pole Concreting. No's 1800
Fixing Of M S Material,Pin, Disc Insulators With HardWare ,D O Fuse Set& L A'
1000
19 s etc. set
20 63 KVA DTR Erection. No's 500
21 100KVA DTR Erection. No's 500
22 DTR Wiring. Job 1200
23 DTR Earthing with earthing Materials(pipe type). No's 300
24 L T Line poles erection. No's 450
25 Spiral Earthing With coil. No's 25
26 Fixing of 4-pin X-arm with shackle insulator and hardware. Set 25
Stringing of L T line with Rabbit Conductor per conductor including wedge
900
27 connectors. KM
Stringing of L T line with Squirrel Conductor per conductor including wedge
750
28 connectors. KM
29 Daimond Gaurding. No's 15
30 Pole Dismantling No's 150
31 Pole Rework ( Leaning ) No's 50
32 Stud Pole No's 450

Q.S Asst Manager Project Manager


CT, BEMETARA.

Revised Rate

550

25
25
25
25
2300
3100
2000
800
3000
2400
4000
1600
500
150
3600
300
2000

1250

500
500
1300
350
550
25
25

1200

900

15
150
50
450