2) ROUGH CASTING 2) Lack of controls while making mould 2) Improved Ramming ,Uniform Graphite
3) Mould Hardness not proper Coating ,Proper cleaning of moulds
4) Loose sticky sand in mould 3) Mould hardness to be checked
3) Air blowing to be done proper before mould
coating
BEFORE ACTIONS 3) DEEP GRINDER MARK ON Core Box / Pattern / Tooling not as per Confirm the tooling (Core Box Pattern) as part print
SURFACE / PROFILE NOT AS PER drawing
DRAWING
4) EXTRA SHOT ON INSIDE OR Shot Blasting not done properly Suffecient time taken for Shot Blast as per
OUTSIDE SURFACE a) Less Timing specification
b) M/c Capability
c) Design Of
BEFORE ACTIONS PRIMER APPLICATION VERY POOR Local Primer being used 1) Supplier to use Escorts approved primer
Method of apply the primer 3) Sufficent time for drying being given
Space / Facility
4) After primer component put on
QUALITY IMPROVEMENT-CASTING SURFACE FINISH(FT COMPONENTS)