Sei sulla pagina 1di 2

ANTRIKSH SANSKRITI

INDIRAPURAM, NH-24
W. E.F. 1/10/10

Type of Flat Specification Area (Approx)


Type-1 2BHK 900
Type-2 2BHK +Store/Study 1150
Type-3 3BHK+3 Toilets 1370
Type-4 3BHK+3 Toilets +Study/servant 1580
Type-5 4BHK+3 Toilets+Store 1880

• PLC FOR FIRST FLOOR Rs. 100/SFT.


• PLC FOR SECOND FLOOR Rs. 75/SFT.
• PLC FOR THIRD FLOOR Rs. 50/SFT.
• PLC FOR FOURTH FLOOR Rs.25/SFT.
• PLC FOR FIFTH FLOOR Rs.15/SFT.
• PLC FOR SIXTH FLOOR Rs.10/SFT.
• PLC FOR PARK /ROAD FACING Rs.50/SFT
• PLC FOR SWIMMING POOL FACING Rs.25/SFT.
• PLC FOR CORNER SIDE Rs.25/SFT.

Basic Sale Price (B.S.P) Rs. 2650/-sq.ft.


Construction Link Plan Rs. 2650/sq.ft.
Flexi Plan Rs. 2517/sq.ft.
Cash Down Plan Rs. 2385/sq.ft.*

Other Charges:

One Covered car parking Rs. 1,50,000/-


One Open car parking Rs. 75,000/-
Power Back-up Rs. 15000/Kva
Club Membership Rs. 35,000
IFMS 20/- sqft Rs. 20/- sqft
EDC & I.D.C. Rs. 60/-Sqft

1
PAYMENT SCHEDULE

PLAN A--- DOWN PAYMENT PLAN

At the time of Booking 10% of Basic


Within 30 days of Booking 85% + EDC&IDC
On Offer of Possession 5% of BSP + Rest Other Charges

PLAN B---CONSTRUCTION LINK PLAN

On application for booking 10% of Basic


Within 30 days of Booking 10% of Basic
Within 60 days of Booking 10% of Basic
On completion of ground floor roof slab 10% of Basic + 50% of EDC & IDC
On completion of 4th floor roof slab 10% of Basic + 50% of EDC & IDC
On completion of 8th floor roof slab 10% of Basic + 50% of Car Parking
On completion of 12th floor roof slab 10% of Basic + 50% of Car Parking
On casting of top floor roof slab 10% of Basic
On completion of brick work 10% of Basic
5% of Basic + Club Charges + Power Backup
On completion of electrical conducting and plumbing
Charges
At the time of notice for possession 5% of Basic + IFMS + Rest Extra Charges

PLAN C –-FLEXI PAYMENT PLAN

On application for booking 10% of Basic


Within 30 days from booking 30% of Basic
On completion of ground floor roof slab 10% of Basic + 50% of EDC & IDC
On completion of 4th floor roof slab 10% of Basic + 50% of EDC & IDC
On completion of 8th floor roof slab 10% of Basic + 50% of Car Parking
On completion of 12th floor roof slab 10% of Basic + 50% of Car Parking
On completion of top floor 10% of Basic
5% of Basic + Club Charges + Power Backup
On completion of electrical conduiting and plumbing
Charges
At the time of notice for possession 5% of Basic + IFMS + Rest Extra Charges

Potrebbero piacerti anche