Sei sulla pagina 1di 4
TE FC NO + DESIGN & SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT TENDER NO: KPOC/YD/10/017 :TC0S JENDERER — ; ASTURI METAL BUILL DERS (M) SDN. BHD. Ttem Reference Clarification Item TENDERER’s Response = Seen NES Cost Impact 1 Crude Stabilization Heater (06-1103 4/8) ‘The design temperature has been changed to 300 deg C instead of 265 deg C. Tenderer to confirm compliance. Malika Fuel Gas Pre Cooler (%-2010) |Bidder stated compliance to the design pressure lchanged from 202 barg to 212 berg however |does not demonstrated in Tenderers HTRI |calculation. Tenderer to demonstrate compliance. [TC-4, Item 1. (Crude Inlet Preheater lay) Heater (x-1103 4/8) [The minimum tube thickness shall be maintained Jat 2.11mm instead of 1.651 mm as proposed by [Tenderer. Tenderer to confirm campliance, [Condensate Sub Cooler (X- [2102 48) JAs an alternative proposal, Tenderer to propose JAFU type for Condensate Sub Cooler (X-2102 [4/6). Piease submit HTRI and mechanical drawing for KPOC review. Tenderer to optimize the lequipment size as possible. rude Export Pump Recycle {Cooler (X-1204 A/B) [As an alternative proposal, Tenderer to propose FU type for Crude Export Pump Recyde Cooler I%-1204 AB). In this altemative proposal, the Itube side design pressure has been changed to 25 lbarg instead of 202 barg. All others data remained ithe same. Please submit HTRI and mechanical \draving for KPOC review. Tenderer to opti the equipment size as possible. Page 1 of 4 100/800 TYE + DESIGN 8 SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT TENDER NO : KPOC/VD/10/017 TCNO —— : TCOS TENDERER — : ASTURI METAL BUILDERS (M) SDN. BHD. Item Reference Clarification Item TENDERER’s Response Se ICondensate Export Purp Recycle Cooler (X-3106 A/B) [As an alternative proposal, Tenderer to propose |AFU type for Condensate Export Pump Recycle (Cooler (X-3106 A/8), In this alternative proposal, ihe tube side design pressure has been changed to 93 barg instead of 212 barg. All others data remained the same. Please submit HTRI and |mechanical drawing for KPOC review. Tenderer to loptimize the equipment size as possible. JIC-4, Item 4, IMalikai Fuel Gas Pre Cooler [The shell side outlet temperature shall be 61.7 jdeg C instead of 56.21 deg C as stated in [Tenderer’s HTRI calculation. Tenderer to confirm FITRI for Crude Stablization freater (x-1103 4/8) \x-2010) compliance, oe 1) The tube side velocity of 0.71 m/s is ow. Tenderer to increase accordingly. 1C-4, Item 1, i) The number of passes at tube side can be increased since there is sufficient pressure drop allowance available, Tenderer to resubmit HTRI and mechanical drawing for KPOC review. [TC-4, Item 1. TRI for Crude Stabilization Heater (X-1103 A/B) [The shell side inlet is from top and tube side inlet lis from bottom. Please change the inlet arrow laccordingly on the HTRI diagram. Page 204 wa ttcst ote Lida 1900 100, TITLE TC. NO + DESIGN & SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT TENDER NO: KPOC/VD/10/017 2 TCOS TENDERER — : ASTURI METAL BUILDERS (M) SDN. BHD. tem Reference Clarification Item TENDERER’s Response Cost Impact (YIN) 10 [The process data sheet shown on Crude Export Process data sheet on Crude |Pump Recycle Cooler (X-1204 VB) is for one unit [Export Pump Recycle Cooler lonly. The operation is stil maintained at 2 x 50%. 1204 AB) [Please read Note 3 of the process data sheet. 1a pecifcation of Shell TubelTenderer to confirm compliance with seal strips feat Exchangers. (Doc NoJfequirements as stated in para 5.11.9 of \D-KPOC-KBB-MEC-SPC-_| Specification of Shel! Tube Heat Exchangers, (Doc 140) INo. AD-KPOC-KBB-MEC-SPC-00140), 12 {Girth Joints requirements as stated in para 5.13.3 leat Exchangers. (Doc No. 5 KPOCKBB-MEC-SPC. OF Specification of Shell Tube Heat Exchangers. +40) (Doc No. AD-KPOC-KBB-MEC-SPC-00140). (3105 A/B), (X-1204 *YB) & Jas an alternative, Tenderer may propose the shell FAURE) {side flange with titanium lap joint and carbon stee! [Titanium material for shel! f'ange. Tenderer shal’ seek advice from principal kde, 14 fenderer to submit details of _ material jprocurement plan including potential isubcontractors for all materials with delivery Ischedule for individual materials. rocurement Plan Page 3 of 4 ey eT taeda) pa yonsenn Te TENDER NO : KPOC/VD/10/017 TCNO :TCOS TENDERER } DESIGN & SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT : ASTURI METAL BUILDERS (M) SDN. BHD. Reference Clarification Item [Titanium Fabrication |Oue to the complexity of titanium fabrication, IKPOC requires that the fabrication of titanium heat exchangers to be performed by a fabricator with proven experience in titanium fabrication. |Thus, the Tenderer may sub contract this fabrication to Tenderer’s principal with proven rack record in tanium fabrication, Tenderer Ishall confirm compliance by providing Support / [Commitment Letter from Principal, lAlternatively, fabrication at the Tenderer's lraciities may be considered if the Tenderer can (demonstrate to the KPOC's satisfaction its ability Ito fabricate titanium with adequate suppart from [a Principal with @ proven track record in titanium fabrication. Pages ofa wet Baw LLIOL TENDERER’s Response 100/900)

Potrebbero piacerti anche