TE
FC NO
+ DESIGN & SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT
TENDER NO: KPOC/YD/10/017
:TC0S
JENDERER — ; ASTURI METAL BUILL
DERS (M) SDN. BHD.
Ttem
Reference
Clarification Item
TENDERER’s Response
= Seen NES
Cost Impact
1
Crude Stabilization Heater
(06-1103 4/8)
‘The design temperature has been changed to
300 deg C instead of 265 deg C. Tenderer to
confirm compliance.
Malika Fuel Gas Pre Cooler
(%-2010)
|Bidder stated compliance to the design pressure
lchanged from 202 barg to 212 berg however
|does not demonstrated in Tenderers HTRI
|calculation. Tenderer to demonstrate compliance.
[TC-4, Item 1.
(Crude Inlet Preheater
lay)
Heater (x-1103 4/8)
[The minimum tube thickness shall be maintained
Jat 2.11mm instead of 1.651 mm as proposed by
[Tenderer. Tenderer to confirm campliance,
[Condensate Sub Cooler (X-
[2102 48)
JAs an alternative proposal, Tenderer to propose
JAFU type for Condensate Sub Cooler (X-2102
[4/6). Piease submit HTRI and mechanical drawing
for KPOC review. Tenderer to optimize the
lequipment size as possible.
rude Export Pump Recycle
{Cooler (X-1204 A/B)
[As an alternative proposal, Tenderer to propose
FU type for Crude Export Pump Recyde Cooler
I%-1204 AB). In this altemative proposal, the
Itube side design pressure has been changed to 25
lbarg instead of 202 barg. All others data remained
ithe same. Please submit HTRI and mechanical
\draving for KPOC review. Tenderer to opti
the equipment size as possible.
Page 1 of 4
100/800TYE + DESIGN 8 SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT
TENDER NO : KPOC/VD/10/017
TCNO —— : TCOS
TENDERER — : ASTURI METAL BUILDERS (M) SDN. BHD.
Item Reference Clarification Item TENDERER’s Response Se
ICondensate Export Purp
Recycle Cooler (X-3106 A/B)
[As an alternative proposal, Tenderer to propose
|AFU type for Condensate Export Pump Recycle
(Cooler (X-3106 A/8), In this alternative proposal,
ihe tube side design pressure has been changed
to 93 barg instead of 212 barg. All others data
remained the same. Please submit HTRI and
|mechanical drawing for KPOC review. Tenderer to
loptimize the equipment size as possible.
JIC-4, Item 4,
IMalikai Fuel Gas Pre Cooler
[The shell side outlet temperature shall be 61.7
jdeg C instead of 56.21 deg C as stated in
[Tenderer’s HTRI calculation. Tenderer to confirm
FITRI for Crude Stablization
freater (x-1103 4/8)
\x-2010) compliance,
oe 1) The tube side velocity of 0.71 m/s is ow.
Tenderer to increase accordingly.
1C-4, Item 1, i) The number of passes at tube side can be
increased since there is sufficient pressure
drop allowance available,
Tenderer to resubmit HTRI and mechanical
drawing for KPOC review.
[TC-4, Item 1.
TRI for Crude Stabilization
Heater (X-1103 A/B)
[The shell side inlet is from top and tube side inlet
lis from bottom. Please change the inlet arrow
laccordingly on the HTRI diagram.
Page 204
wa ttcst ote Lida
1900
100,TITLE
TC. NO
+ DESIGN & SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT
TENDER NO: KPOC/VD/10/017
2 TCOS
TENDERER — : ASTURI METAL BUILDERS (M) SDN. BHD.
tem
Reference Clarification Item
TENDERER’s Response
Cost Impact
(YIN)
10
[The process data sheet shown on Crude Export
Process data sheet on Crude |Pump Recycle Cooler (X-1204 VB) is for one unit
[Export Pump Recycle Cooler lonly. The operation is stil maintained at 2 x 50%.
1204 AB) [Please read Note 3 of the process data sheet.
1a
pecifcation of Shell TubelTenderer to confirm compliance with seal strips
feat Exchangers. (Doc NoJfequirements as stated in para 5.11.9 of
\D-KPOC-KBB-MEC-SPC-_| Specification of Shel! Tube Heat Exchangers, (Doc
140) INo. AD-KPOC-KBB-MEC-SPC-00140),
12
{Girth Joints requirements as stated in para 5.13.3
leat Exchangers. (Doc No. 5
KPOCKBB-MEC-SPC. OF Specification of Shell Tube Heat Exchangers.
+40) (Doc No. AD-KPOC-KBB-MEC-SPC-00140).
(3105 A/B), (X-1204 *YB) & Jas an alternative, Tenderer may propose the shell
FAURE) {side flange with titanium lap joint and carbon stee!
[Titanium material for shel! f'ange. Tenderer shal’ seek advice from principal
kde,
14
fenderer to submit details of _ material
jprocurement plan including potential
isubcontractors for all materials with delivery
Ischedule for individual materials.
rocurement Plan
Page 3 of 4
ey eT taeda) pa
yonsennTe
TENDER NO : KPOC/VD/10/017
TCNO :TCOS
TENDERER
} DESIGN & SUPPLY OF SHELL AND TUBE HEAT EXCHANGERS FOR KEBABANGAN NORTHERN HUB DEVELOPMENT PROJECT
: ASTURI METAL BUILDERS (M) SDN. BHD.
Reference
Clarification Item
[Titanium Fabrication
|Oue to the complexity of titanium fabrication,
IKPOC requires that the fabrication of titanium
heat exchangers to be performed by a fabricator
with proven experience in titanium fabrication.
|Thus, the Tenderer may sub contract this
fabrication to Tenderer’s principal with proven
rack record in tanium fabrication, Tenderer
Ishall confirm compliance by providing Support /
[Commitment Letter from Principal,
lAlternatively, fabrication at the Tenderer's
lraciities may be considered if the Tenderer can
(demonstrate to the KPOC's satisfaction its ability
Ito fabricate titanium with adequate suppart from
[a Principal with @ proven track record in titanium
fabrication.
Pages ofa
wet Baw LLIOL
TENDERER’s Response
100/900)