(W-0.

1)/spacing+1)xNo of
L+D+D-0.3 FtgxTL
cover sides=0.1
Enter details from schedule - L,W,D & No of t&b = 0.2
Enter dia of the bar from
footings Schedule

S.NO L W D No Footing Length 'TL' spacing Length DIA


1 1.5 2 0.25 1 1.8 0.2 18.9 16
1 2.3 0.2 18.4 12
2 2.3 1.25 0.4 1 2.9 0.2 19.575 12
1 1.85 0.2 22.2 12
-0.2 0.2 0 12
-0.2 0.15 0 12
-0.2 0.15 0 12
-0.2 0.1 0 12
-0.2 0.1 0 12
-0.2 0.2 0 12
-0.2 0.2 0 16
-0.2 0.2 0 16
-0.2 0.15 0 16
-0.2 0.15 0 12
-0.2 0.15 0 12
-0.2 0.15 0 12
-0.2 0.15 0 12
-0.2 0.15 0 12
-0.2 0.15 0 12
-0.2 0.15 0 16
-0.2 0.15 0 16
-0.2 0.15 0 12
-0.2 0.2 0 16
-0.2 0.1 0 12

QTY 'T'
insert no. of footings
for concrete works

Enter dia of the bar from Qty in m3 in 'M2'


Schedule

PCC CONCRETE
WT./M 12 16 20 25 TOTAL QT No of Ftng PCC QTY
1.588 - 30.01 - - 30.01 1 0.374
0.89 16.38 - - - 16.38
0.89 17.42 - - - 17.42 1 0.3625
0.89 19.76 - - - 19.76
0.89 - - - - - 0 0.004
0.89 - - - - -
0.89 - - - - - 0 0.004
0.89 - - - - -
0.89 - - - - - 0 0.004
0.89 - - - - -
1.588 - - - - - 0 0.004
1.588 - - - - -
1.588 - - - - - 2 0.004
0.89 - - - - -
0.89 - - - - - 2 0.004
0.89 - - - - -
0.89 - - - - - 2 0.004
0.89 - - - - -
0.89 - - - - - 2 0.004
1.588 - - - - -
1.588 - - - - - 1 0.004
0.89 - - - - -
1.588 - - - - - 1 0.004
0.89 - - - - -
53.56 30.01 - - 83.57 0.7765
0.08 0.05 0.03 - - - 0.08
in 'M2' in 'RM'

PCC CONCRETE
Nylon 500g W/W 1x4
3.74 7.8

3.625 7.9

0.04 0

0.04 0

0.04 0

0.04 0

0.04 1.6

0.04 1.6

0.04 1.6

0.04 1.6

0.04 0.8

0.04 0.8

7.765 23.7
GROUND FLOOR COLUMNS

MAIN STEEL FOR COLUMNS


DESCRIPT SIZE
L W Ht. No of ColumnsNo of Floors DIA No of Bars
C1 0.2 0.8 3.3 1 1 12 8

C2 16 16

C3 10 38

C4 16 14

C5 25 14

C6 16 17
COLUMNS

LATERAL TI
ES TOTAL WEIGHTS CONCRETE
8mm 10mm 12mm 16mm 20mm 25mm 32mm
DIA Spacing Deduct slab
8 0.2 11.32 - 27.77 - - - 0.3
- - - - - -
10 0.2 - - - - - - 0.3
- - - - - -
10 0.2 - - - - - - 0.3
- - - - - -
10 0.2 - - - - - - 0.3
- - - - - -
10 0.15 - - - - - - 0.3
- - - - - -
10 0.2 - - - - - - 0.3
11.32 - 27.77 - - - -

TOTAL QTY OF STEEL IN 'TONNES' WITH WAST. 5% 0.04

PERCENTAGE OF STEEL TO CONC 8%

FARAZ:

STILL NEED TO BE FINALISED UNDER


CONSTRUCTION
WHEN FINISHED I LL REMOVE THIS COMMEN

ONLY THIS AREA


WHEN FINISHED I LL REMOVE THIS COMMEN

ONLY THIS AREA


SHUTTERING MATERIAL
CONCRETE
COLUMN
S PLYWOOD W/W 3x3 W/W 1x4
Qty
0.48 6.48 12.00 6.00
- - -
- - - -
- - -
- - - -
- - -
- - - -
- - -
- - - -
- - -
- - - -
0.48 6.48 12.00 6.00
QTY IN QTY IN QTY IN
'M3' 'M2' 13.20 PIECE

QTY IN
'RM' WITH
WASTAGE
10%

UNDER

THIS COMMENT
THIS COMMENT
SLABS

S.NO Lxx Lyy Thk No of slabs L' of Bar


S1 TOP 20.80 19.90 0.24 1.00 21.18
1.00 20.28
S1 Btm 20.80 19.90 0.24 1.00 21.18
1.00 20.28
S2 15.00 10.00 0.20 1.00 15.30
1.00 10.30
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)
(0.10)

EXTRA STEEL

S.NO Lxx Lyy Thk No of slabs L' of Bar spacing


1 B1 3.00 4.00 0.20 1.00 8.00 0.10
4.30 0.15
1 B2 - 6.40 0.20 1.00 5.00 0.10
1.00 6.70 0.20
1 B3 3.00 0.20 1.00 0.30 0.20
1.00 0.20
1 B3 4.00 5.00 0.15 1.00 4.00 0.10
0.15
1 B3 6.00 1.00 - 0.20
0.20
1 B3 (0.10) 0.20
(0.10) 0.20
(0.10)
(0.10)
(0.10)
(0.10)
spacing Length DIA WT./M 10 12 16
0.20 2,075.64 12.00 0.89 - 1,847.32 -
0.20 2119.26 12.00 0.89 - 1,886.14 -
0.20 2,075.64 12.00 0.89 - 1,847.32 -
0.20 2,119.26 12.00 0.89 - 1,886.14 -
0.15 984.30 12.00 0.89 - 876.03 -
0.20 777.65 16.00 1.588 - - 1,234.91
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
#DIV/0! - - - -
8,342.95
QTY 'T' 8.34

Nos Length DIA WT./M 10 12 16


36.00 288.00 16.00 1.588 - - 57.17
17.67 75.97 - - - -
60.00 300.00 12.00 0.89 - 53.40 -
(1.50) (10.05) - - - -
13.50 4.00 12.00 0.89 - 12.02 -
(1.50) - - - - -
46.00 184.00 12.00 0.89 - 40.94 -
24.33 - - - - -
28.50 - 12.00 0.89 - 25.37 -
(1.50) - - - - -
(1.50) 4.00 12.00 0.89 - (1.34) -
(1.50) 0.15 - - - -
#DIV/0! #DIV/0! - - - -
#DIV/0! #DIV/0! - - - -
#DIV/0! #DIV/0! - - - -
#DIV/0! #DIV/0! - - - -
#DIV/0! #DIV/0!
20 25 TOTAL QTY
- - 1,847.32
- - 1,886.14
- - 1,847.32
- - 1,886.14
- - 876.03
- - 1,234.91
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
#DIV/0!

20 25 TOTAL QTY
- - 57.17
- - -
- - 53.40
- - -
- - 12.02
- - -
- - 40.94
- - -
- - 25.37
- - -
- - (1.34)
- - -
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
- - #DIV/0!
End condit
beam has t
BEAMS 1= CONTINOUS 1=CONTIN
2= 2=SIMPLY
SIMPLY SUPPORTED

BOTTOM MAIN STEEL TOP MAIN STEEL TOP EXTRA


NO. OF NO. OF
B1 L W D DIA BEAMS BARS DIA NO.OF BARS CONDITION
B1
B2 20.8 0.2 0.6 16 1 3 16 3.00 1

NOTES : WHILE USING THIS FORMAT DON'T DELETE COMPELETLY BY DRAGING AT ONCE
DELETE ONE BY ONE VIZ., BOTTOM MAIN STEEL ONE TIME,TOP MAIN STEEL ONE TIME AND
End condition of the
beam has to be specified
= CONTINOUS 1=CONTINOUS
= 2=SIMPLY SUPPORTED
SIMPLY SUPPORTED

BOTTOM
TOP EXTRA EXTRA STIRRUPS TOTAL LENGTH OF
NO. OF NO OF NO OF
SUPPORTS DIA BARS DIA BARS DIA SPACING 8 10 12
- - -
1 20 3 16 2 8 0.20 199.50 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- -
TOTAL LENGTH 199.50 - -
WT In Tonnes 0.08 - -

DRAGING AT ONCE
OP MAIN STEEL ONE TIME AND SO ON
TOTAL LENGTH OF BARS

16 20 25 32
- - - -
145.60 15.60 - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
145.60 15.60 - -
0.23 0.04 - -
PLASTERING 12mm THK

INTERNAL PLASTERING EXTERNAL PLASTERING


10 12mm Thk
### 0.12 1.2
30% for un-uniform 1.56 30%
25% for wet volume 1.95 say 2.0 m3 25%

eg 2/(1+6) eg
For 12mm Thk plaster For 18mm Thk plaster
ratio cement sand ratio
1 : 6 0.29 1.71 1
1 : 8 0.22 1.78 1
1 : 10 0.18 1.82 1
1 : 4 0.40 1.60 1
:
:

BLOCK WORK

1.04

1.06
2

1.04 1.06 0.2 0.22048 m3 B/W


1 1 0.2 0.2
0.02048 1.15 0.023552
0.005888
Therefore for 1.1024m2 of block work reqd 0.02944 m3 CM

for 1.1024 m2 of B/W 1;4 0.005888


0.023552

For 1 m2 of B/W 0.0213643 m3 of CM


For 10 m2 of B/W 0.21364296 m3 of CM

FOR 10 m2 OF BLOCK WORK


ratio Cement Sand
1 : 6 0.03052 0.183123
1 : 8 0.023738 0.189905
1 : 5 0.035607 0.178036
1 : 4 0.042729 0.170914
1 : 3 0.053411 0.160232
1 : 2 0.071214 0.142429

CERAMIC TILES SIZE 2x5 36


ITEM QTY RATE AMOUNT
1 TILES 36 35 1,260.00
2 LABOUR 36 15 540.00
3 CEMENT 34.58213 15 518.73 1bag = 0.0347m3=1.23cft
4 SAND 3.6 47.2 169.92 850/18M3
5 GROUT 1 15 15.00
WATER 1 50.07 50.07
-
-
MISCELLANEOS -
2,553.73

CONTRACT 15% 2,936.78


ADJUSTMENT 81.58 PER M2
HALLOW BLOCK WORK - 20cm SIZE 50x2x0.2 100 m2 = 20m3
ITEM QTY RATE AMOUNT UNIT
1 BLOCKS 1250 2.30 2,875.00 NOS
2 LABOUR 100 12.00 1,200.00 PER M2
3 CEMENT 12.31 15.00 184.71 BAGS FOR
4 SAND 1.71 47.20 80.67 M3
5 ACCESSOR 1 143.75 143.75 0.5%
6 WATER 1 179.37 179.37 4%
7 LIFT/SHIF 1 331.97 331.97 10.00%
-
MISCELLA 1 331.97 331.97 10.00%
5,327.44

CONTRACT 15% 6,126.56


ADJUSTMENT 61.27 PER M2

SOLID BLOCK WORK SIZE 50x2x0.2 100 m2


ITEM QTY RATE AMOUNT
1 BLOCKS 1250 3.40 4,250.00
2 LABOUR 100 15.00 1,500.00
3 CEMENT 12.31372 16.00 197.02 FOR
4 SAND 1.709144 35.00 59.82 700
5 15.00 -
WATER 1 240.27 240.27
-
-
MISCELLANEOS -
6,247.11

CONTRACT 15% 7,184.18


ADJUSTMENT 71.84 PER M2

THERMAL BLOCK WORK SIZE 50x2x0.2 100 m2


ITEM QTY RATE AMOUNT
1 BLOCKS 1250 4.10 5,125.00
2 LABOUR 100 15.00 1,500.00
3 CEMENT 4.6 15.00 69.00 FOR
4 SAND 22.56 47.20 1,064.83
5 15.00 -
WATER 1 310.35 310.35
-
-
MISCELLANEOS -
8,069.19

CONTRACT 15% 9,279.56


ADJUSTMENT 92.80 PER M2

INTERNAL PLASTERING SIZE 50x2x12mmT 100 m2


ITEM QTY RATE AMOUNT
1 -
2 LABOUR 100 9.00 900.00
3 CEMENT 4 15.00 60.00 For 1:4 plaster check abov
4 SAND 16 47.20 755.20
5 15.00 -
WATER 1 68.61 68.61
-
-
MISCELLANEOS 101.00
1,884.81

CONTRACT 15% 2,167.53


ADJUSTMENT 21.68 PER M2

EXTERNAL PLASTERING SIZE 50x2x12mmT 100 m2


ITEM QTY RATE AMOUNT
1 -
2 LABOUR 100 14.00 1,400.00
3 CEMENT 6 15.00 90.00 For 1:4 plaster check abov
4 SAND 24 47.20 1,132.80
5 15.00 -
WATER 1 104.91 104.91
-
-
MISCELLANEOS 101.00
2,828.71

CONTRACT 15% 3,253.02


ADJUSTMENT 32.53 PER M2

MARBLE FLOORING SIZE 2x5 36


ITEM QTY RATE AMOUNT
1 TILES 36 80 2,880.00
2 LABOUR 36 45 1,620.00
3 CEMENT 34.58213 15 518.73 1bag = 0.0347m3=1.23cft
4 SAND 3.6 47.2 169.92 850/18M3
5 GROUT 1 15 15.00
WATER 1 104.07 104.07
-
-
MISCELLANEOS -
5,307.73

CONTRACT 15% 6,103.88


ADJUSTMENT 169.55 PER M2
EXTERNAL PLASTERING
10 m2 12mm Thk
10 0.18 1.8
for un-uniform surface 2.34
for wet volume 2.925 say 3.0m3

3/(1+6)
For 18mm Thk plaster
ratio cement sand
: 6 0.43 2.57
: 8 0.33 2.67
: 10 0.27 2.73
: 4 0.60 2.40
m3 cement
m3 sand

No of bags
0.8796
0.6841
1.0261
1.2314
1.5392
2.0523

10 1.17
100

11.7

1bag = 0.0347m3=1.23cft
amt/qty
1 - 4 RATIO check the above chart

120
120.0083

1 - 4 RATIO check the above chart


20 35

1 - 4 RATIO check the above chart


For 1:4 plaster check above chart

For 1:4 plaster check above chart

1bag = 0.0347m3=1.23cft
amt/qty
G/F F/F ROOF
INTERNAL PLASTERING 44.80 26.00 -
CERAMIC FLOOR - 20.00 -
CERAMIC SKIRT - 18.00 -
MARBLE FLOOR - 6.00 -
MARBLE SKIRT - 10.00 -
GRANITY FLOOR 10.00 -
BATH WALL 30.00 90.20 -
BATH FLOOR 5.25 24.00 -

Ground Floor ROOM SIZE PLASTERING


S.NO DESCRIPTION L B HT Length 'L' Wall Area 'Aw'
1 Bed 2.00 5.00 3.20 14.00 44.80

2 Mast. Bed - -

3 - -

4 - -

5 - -

6 - -

7 - -

8 - -

9 - -
44.80

FIRST FLOOR ROOM SIZE PLASTERING


S.NO DESCRIPTION L B HT Length 'L' Wall Area 'Aw'
1 Bed 2.00 3.00 3.90 10.00 39.00

2 Mast. Bed 4 5 3.9 18.00 70.20

3 - -
4 - -

5 - -

6 - -

7 - -

8 - -

9 - -
109.20

BATH ROOMS
BATH SIZE

S.NO DESCRIPTION L B HT Length 'L' Wall Area 'Aw'

G/F 1 BATH G1 1.50 3.50 3.00 10.00 30.00

-
2 BATH G2 - -

3 BATH G3 - -

4 BATH G4 - -

5 BATH G5 - -
30.00

F/F 1 BATH F1 2.00 2.00 2.50 8.00 20.00

2 BATH F2 4 5 3.9 18.00 70.20

3 BATH F3 - -

4 BATH F4 - -

5 BATH F5 - -
90.20

DOORS DETAILS
Location Door Notat No. of Doors'D' Ld Hd Area 'Ad' Location
Bed D1 0 1 2.1 0 Bed
0
DEDUCT TOTAL QTY
- 70.80
20.00
18.00
6.00
10.00
10.00
120.20
- 29.25

1 = MARBLE
2 = CERAMIC
3 = GRANITY

PLASTERING FLOORING SKIRTING


Flr Area 'Af' Floor Type Marble Ceramic Granity Marble Ceramic Granity
10.00 3 - - 10.00 - - 14.00
- - - - - -
- 2 - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -
10.00 - - 10.00 - - 14.00
1 = MARBLE
2 = CERAMIC
3 = GRANITY
PLASTERING FLOORING SKIRTING
Flr Area 'Af' Floor Type Marble Ceramic Granity Marble Ceramic Granity
6.00 1 6.00 - - 10.00 - -
- - - - - -
20.00 2 - 20.00 - - 18.00 -

- - - - - - -
- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -

- - - - - - -
26.00 6.00 20.00 - 10.00 18.00 -

Flr Area 'Af'

5.25

-
5.25

4.00

20.00

-
24.00

WINDOWS DETAILS
Door NotationNo. of DoorsLw Hd Area 'Aw'
W1 0 1 2.1 0
0

Potrebbero piacerti anche