BIS Norms:. Building - Minimum Area required: 2500 to 5000 Sq.t (Size of the building Depends on the installing the plant capacity [LPH]) Type of construction-RCC / ACC, it should be sound construction as per ISI standards.
BIS Norms:. Building - Minimum Area required: 2500 to 5000 Sq.t (Size of the building Depends on the installing the plant capacity [LPH]) Type of construction-RCC / ACC, it should be sound construction as per ISI standards.
Copyright:
Attribution Non-Commercial (BY-NC)
Formati disponibili
Scarica in formato DOC, PDF, TXT o leggi online su Scribd
BIS Norms:. Building - Minimum Area required: 2500 to 5000 Sq.t (Size of the building Depends on the installing the plant capacity [LPH]) Type of construction-RCC / ACC, it should be sound construction as per ISI standards.
Copyright:
Attribution Non-Commercial (BY-NC)
Formati disponibili
Scarica in formato DOC, PDF, TXT o leggi online su Scribd
Building – Minimum Area required: 2500 to 5000 Sq.t
(Size of the building Depends on the installing the plant capacity [LPH]) Type of construction-RCC/ACC, it should be sound construction as per ISI standards
S.N Name of the place Required are in sq.ft
o 1 Washing Area Min 300 sq.ft 2 Processing plant 400 to 500 sq.ft 3 Storage/stock area Minimum 1000 sqt.ft for 2000 LPH 4 Jar Filling(Manual) 100sq.ft 5 Jar Filling(Automatic) 200 Sq.ft 6 Bottling(Automatic) 250 sq.ft 7 Lab(chem..µ) 300sq.ft 8 Dressing Room 50 sq.ft 9 Raw materials storage(outside of the main 150 min building) 10 Workers rest room(outside of the main building) 50 to 100 11 Total promises area(Land) 10,000 sq.ft minimum
Floor & Wall must be laid Tiles, Marbles, Granites or any non absorbent & smooth surface stones.
Location Wall Floor
Processing Area 7 Feet Full Washing Area 7 to feet Full All Filling Rooms 7 Feet Full Laboratory 2 Feet above the top slab Full level Storage/stock 3 Feet Full Toilet Min 3 Feet Full Precautionary 5 Feet Full area(workers entrance Raw water Tank Full Full
Note:
Some Additional Information:
1) NOC (compulsory in customer’s side).
Panchayat or municipal president should discuss in meeting with ward members, finally give the NOC to the customers, otherwise it may create some problem because this process only for their records.
2) Land Area- 10,000 Sq ft
3) It suppose customers finalized the land should go to PWD department and
that people survey the land and finally they will give the water survey report. This will go to pollution control department .(*it is mandatory to go with public PWD survey)
4) It is optional(Tamilnadu) to get survey report from