SITE: ROOM:
2. Sounder/flasher triggers
Hello Bola,
Ijebu Ode BSC Status is as follows
1. BSC offline commisioning has been done for 400TRX
2. Transmission link between BSC (B4015) and backbone (B5993) have been established
3. Currently the circuit between BSC-B4015 and lekki datacenter is being connected and loopback being done to
determine the E1's
4. Remaining Abis cables are being terminated