Leak Free Terrace-

Old Construction
Pidilite Industries Limited
Construction Chemicals Division
Ramakrishna Mandir Road
P O Box No. 17411
Andheri East
CC-DF-LEAKFREE TERRACE OLD-ENG-06/07

Mumbai-400 059
T 2835 7000 F 2835 7008
drfixit@pidilite.com, www.doctor-fixit.com from the makers of

BRANCH OFFICES Ph No.: AHMEDABAD (079) 27552043/ 1483 BANGALORE (080) 22204238/ 4239
CHENNAI (044) 28350338/1614 COCHIN (0484) 2543978 / 3979 DELHI (011) 22440890, 22541970
HYDERABAD (040) 23351250 / 1308 KOLKATA (033) 22888844 / 7610 MUMBAI (022) 28357000

DISCLAIMER The product information & application details given by the company & its agents has been provided in good faith & meant to serve only as a general guideline during
usage. Users are advised to carry out tests & take trials to ensure on the suitability of products meeting their requirement prior to full scale usage of our products. Since the
correct identification of the problems, quality of other materials used and on-site workmanship are factors beyond our control, there are no expressed or implied guarantee / FOR HEALTHY CONSTRUCTION
warranty as to the results obtained. The Company does not assume any liability or any consequential damage for unsatisfactory results, arising from the use of our products.
Introduction
Leakage through terraces is the most common
problem today. The perennial problem of this
kind creates unhealthy conditions for the
occupants and is very disturbing. This can also
pose danger to the structure, if the problem is not
tackled on time.
The issues that need to be tackled for old
terraces and its solutions to have a leak free
terrace are described in this manual.
Old terraces with existing brick bat coba • For this, first prime with Dr. Fixit Primeseal
50 mm on either sides of the crack.
Then place the glass fibre cloth over the
crack (total width of the fibre cloth to be cut
OPTION 1 Waterproofing with Acrylic Coating (Dr. Fixit Newcoat) to 100 mm width), ensuring that the cloth is
50 mm on either side. The length of the
Step 1 Inspection cloth should be 50mm more than the length
• Inspect roof slab thoroughly to know the of the crack at both the ends
condition of substrate. • Apply the 1st coat of Dr Fixit Newcoat over
• Tap the surface with hammer to know the the fiber cloth liberally and allow it to dry,
loose or de-bonded portions and then apply the 2nd coat to reinforce
• Mark the area of bad portions & cut them • The mouth of the rainwater pipes shall be
open for repairs with polymer modified grouted properly making a polymer modified
mortar (PMM) mortar by adding 10% of Dr. Fixit Pidicrete
• Look for major cracks URP by wt. of cement to a 1:4 cement-sand
• Check slope of the terrace and the mortar. Open the area around pipe and re
diameter of the rain water pipes grout it with the prepared mortar
• Inspect parapet wall. Check for the rounded • All low-lying areas shall be attained by
corners, if not, make provision for it with a rectifying the slope. Remove the top 20 mm
polymer modified mortar (PMM)
IPS by breaking and cleaning the area.
Prepare PMM using Dr. Fixit Pidicrete URP
Step 2: Repairs to existing surface as explained above, can be reinstated, before
• Remove loose / de-bonded portion of the this, apply a neat bond coat of Dr Fixit
brick bat coba completely or partially, Pidicrete URP on the cleaned surface. When
depending upon the condition, by the bond coat is still wet, apply the polymer
mechanical means, in a proper modified mortar (PMM ) with a trowel to the
geometric shape required thickness and slope. Cure it with a
• Reinstate the entire section of brick bat mild sprinkling of water for 3 days by
coba if it is bad, or, in patches to the sprinkling water. If the temperature is more
required depth, using a polymer modified
mortar (PMM) by adding 10 % Dr. Fixit than 400 C, than cover the repaired area with
Pidicrete URP by weight of cement in a 1: 3 a plastic sheet to block the direct heat of
cement- sand mortar the sun
• Even if the top 20 mm of the IPS has • Loose / cracked plaster on the parapet wall
cracked or debonded, reinstate it with shall be removed carefully and redone by
polymer modified mortar (PMM) in adding integral waterproofing compound
accordance with the mixing ratio above
Dr. Fixit Pidiproof LW

Cracks in particular shall be treated as under :


Step 3: Application of waterproofing coating
• All visible cracks up to 3 mm wide shall be
¬ Primer Application
filled with crack filling compound Dr. Fixit
Crack X. Prior to application of Dr. Fixit • Pre wet the surface prior to application of
Crack X, they should raked and cleaned of primer and allow surface water to evaporate
dust and dirt. This will allow the repair
• Apply one coat of Dr. Fixit Primeseal on the
material to be properly anchored into
the crack cleaned & leveled surface @ 12 to 15 mtr / litre
• Add water to Dr. Fixit Crack X powder, as • Allow the primer coat to dry for 4 hours (at
recommended and fill it in the cracks after 30º C). The drying time however, will depend
pre wetting them. Allow the application on the ambient temperature
to dry
• Cracks more than 3 mm shall be filled with ¬ Application of Dr. Fixit Newcoat
polymer-modified mortar in the ratio
mentioned above • Apply 1st coat of Dr. Fixit Newcoat on the
• A glass fiber cloth (50 gsm specification) dried primer coat uniformly with stiff nylon
must be stuck over the crack area brush or roller at the rate of 2 sq.mtr / litre
• Apply 2nd and 3rd coat at the same rate after
drying of the previous coats. Choose any two
or all the three available colours for the 3
coats. This will ensure the correct
application of the material. Use of roller is
recommended for a fast and uniform
application of Dr. Fixit Newcoat
• All the concrete / masonry pedestals OPTION 2 Waterproofing with Torch-on-membranes (TORCHSHIELD)
present on the roof, constructed for
Step 1 Surface preparation
supporting the water tanks or pipe lines or
dish antenna, etc., also should be coated • Clean the surface to remove all lose
with Dr Fixit Newcoat along with the materials, laitance, etc., to conform to good P R I M ER

terrace. The junction between such standards of surface preparation, by


pedestals and the slab shall have corner mechanical or other means
fillet (corner rounding) made with a • All voids, pits, etc shall be filled with
polymer modified mortar polymer modified mortar
• Parapet wall terrace slab corner junctions
¬ Parapet walls shall be filled with polymer modified mortar Clean & remove dust, dirt, loose particles Apply primer coat with solvent based
and unsound substrate bitumen primer on cleaned & leveled
as triangular fillets (75 mm X 75 mm). surface at
• The application of Dr. Fixit Newcoat shall Make surface smooth, even & free from
3 - 5 sq.mtr / litre
local depressions with polymer modified
continue upto the top of the corner • Plastering on parapet walls must be sound mortar
rounding at junction of the parapet wall & and repaired if necessary, in accordance
terrace slab. One can even go upto the top with procedure mentioned earlier
of the parapet wall. But for budgetary
constraints, it is suggested to apply Step 2 Application of Dr. Fixit Torchshield
Dr. Fixit Raincoat from the top of the ¬ Application of Primer
rounding onwards to over the top of the
• Apply Dr. Fixit Torchshield Primer,
parapet, and continue on the exterior side
solvent-based bitumen liquid,on cleaned &
upto below drip mould
leveled surface @ 3-5 sq. mtr /litre
• All rain water pipe 'openings' shall be
• The priming will enhance the adhesion of
coated with Dr. Fixit Newcoat from inside
the membrane to the substrate. Allow the
for 2 inches Unroll the DR. FIXIT TORCHSHIELD Align the DR. FIXIT TORCHSHIELD Roll
primer coat to dry Roll after application of DR. FIXIT correctly
TORCHSHIELD PRIMER & re-roll it in alignment
before torching
Precautions & Limitations
¬ Membrane Application
• Do not apply Dr. Fixit Newcoat on loose /
cracked surfaces • Starting at low point from the roof, unroll
the Dr. Fixit Torchshield roll, once the
• Do not apply apply Dr. Fixit Newcoat on
priming coat is dried. Align the Dr. Fixit
big cracks / construction without proper
Torchshield roll correctly & re-roll it half in
treatment. Do not apply over expansion
alignment before torching. Avoid shifting of
joints and over joints of precast slabs
the membrane while torching
• Check for moisture content of the
substrate. It must be less than 10% • Use a gas flame torch to heat substrate
& the underside of the roll to softening
• Avoid applications on rainy days
point until the embossing disappears.
• Protect Dr Fixit Newcoat from water Roll forward & press firmly against Use gas burner to heat substrate & Keep an overlap margin for minimum 100
spillage / rain for 72 hours substrate to bond from the lower end underside to softening points. When the mm
embossing disappears, roll forward &
• Pre-treatment of cracks is a must as towards the higher end press firmly against substrate to bond
detailed above from the lower end towards the
• Ensure sufficient bleed on the side & end, higher end
over the laps. Once the half of the roll is
torched properly to the substrate, unroll
the balance roll and repeat the process
• An overlap of 100-mm shall be maintained
for all the sides. Heating shall be done on
both the membranes to be overlapped and
pressed firmly with the help of round
shaped trowel. The care shall be taken to
leave no gap at any point in the
overlapping area. If noticed, reheating
shall be done to seal it
Heat both the overlaps & use round tipped All angles & upstands should be sealed
trowel to seal overlap. Excess compound with extra care to ensure perfect bondage.
Step 3: Termination of Membranes should be smoothened & pressed into
seam using hot trowel
Seal the edges well into grooves & protect
with a Polysulphide sealant
• The membranes shall be first laid up to the
top of the fillet on the parapet wall, but
under the drip mould. It shall then be This application procedure is a standard guideline for
overlapped with another membrane in the using the 3 & 4 mm membranes only, which may
flashing with an overlap of 100 mm over slightly vary upon the site conditions & different
the sheet below. This overlap shall be firmly application areas & different application areas.
sealed over the corner fillet
At the opening of Rain water pipes
• The places where opening are encountered
Old terrace with
for rain water down take pipes, the
membranes shall be cut open with a sharp Bitumen System (Tarfelt)
knife in a “+” sign, in the center of the
opening. This will make 4 triangular parts
Step 1: Removal of Tarfelt system Step 3: Application of
of the membrane in the opening. When Dr. Fixit Torchshield Primer
bent, it will make a circular opening Remove the old Tar felt system completely
by mechanical grinding or suitable means Apply primer as explained above
• Torching shall be done on the reverse side to remove any trace of the old bitumen.
of these four parts also. Bend these four Vacuum- clean the surface
parts inside and tightly press against Step 4: Application of
Dr. Fixit Torchshield membrane
pipe surface
Step 2: Repair of substrates Apply 3 mm or 4 mm glass or polyester
Cut open the membrane with a sharp knife in a “+” sign, in the center During removal of the old tar felt, if reinforced Dr. Fixit Torchshield membrane
Step 4: Protection of the opening. This will make 4 triangular parts of the membrane in damage to substrate, flashing areas of as explained above
the opening. When bent, it will make a circular opening.
• The Dr. Fixit Torchshield membranes shall parapet walls have occurred, they must be
be protected either with a concrete screed Roof Slab suitably repaired with means explained
Step 4: Protection
laid to slope, or, by applying a bitumen Dr. Fixit Membrane earlier in this book
Cant Strip Depending on the end use, Dr. Fixit
based aluminum paint in 2 coats for the Through inspection of the soundness of the
Pipe Torchshield shall be protected an
sloped roofs. This will ensure UV protection surface or surrounding members is also
Membrane Tie
aluminum coat or a concrete screed in
to the membrane. The concrete screed will mandatory. The structural damage shall be
accordance with directions given earlier
be required for foot-trafficked roofs made good by consulting competent repair
specialists / engineers
• For heavy traffic or special purpose such as
car parks, etc., the concrete screed shall be
laid in accordance with engineer's /
architects specifications
Check list for waterproofing of old RCC terrace slabs
• On plain / non-sanded membranes, one can
achieve a mechanical key for screeding by ¬ Check existing waterproofing system ¬ PARAPET WALLS
torching the top of membrane, immediately
• Cement based (Brick bat coba with or • Condition of junction between
followed by spreading coarse sand very Vertical Pipe Penetration Detail
without china chips) parapet walls & slab
liberally. The sand must have been washed
of its mud and silt and then dried • Bitumen based (Tarfelt) • Condition of plaster (cracks,
• The day after this done, the loose sand • Others (Lime Terracing, Lime Surkhi, debonding), water mould (location,
Dr. Fixit Membrane
must be broomed off, or vacuum cleaned Clay tiles, other tiles, etc) broken, etc.,)
Screed to slope
• Top of wall & its slope
Roof Slab
Precautions & Limitations for handling Drain Pipe
¬ Check present condition. Look for
Dr Fixit Torchshield Membranes • Cracks on the surface (location, • Age of the building and time since the
1. Membrane rolls must be stored by placing width & length) last waterproofing is done
them vertically. Stacking them horizontally • Debonding of waterproofing • Span and area of slab
one on top of the other, will put pressure • Condition of slab (Excess deflection,
system from the parent slab (by
and will cause longitudinal cracks corrosion marks, spalling of concrete,
hammer test)
2. Store membrane rolls in a clean and heavy leakages at few or many places,
covered place before use • Slope (check by way of level tube)
corrosion of main rebars, etc)
3. Be careful with the naked torch flame; • Rain water down take pipes
Vertical Drain Detail (Numbers, location, size, grouting • Location of structures (Coastal, hilly
it should be well away from the gas
space around pipes) area, etc.,)
cylinders or other combustible materials
during application • Expansion joints • Average rainfall pattern, humidity,
4. Torching of membranes must not be over- temperature conditions
• Water pipes from the OH tanks, other
done. Stop torching when the membrane service lines, cables, etc., and their • Use of terrace (for normal foot traffic,
starts smoking locations, placing (touching slab, terrace gardens, car parking, etc.,)
5. After torching the membrane, extinguish across rain water down takes) • Type of structures (Residential,
the torch flame immediately; do not leave it • Any other mechanical installations commercial, industrial, etc.,)
lit on the areas already applied with • Performance parameters (guarantee,
like cooling towers, pumps,
membranes, or, on any other area service life, etc.,)
Air conditioners
6. Do not torch membranes in temperatures • History of past waterproofing jobs
less than 5 ºC ELD
HS H I (w.r.t. system & its service life span)
7. Do not apply on wet / moist areas subject TO R C
to restoration
8. Moisture content of terrace surface must For non-foot traffic area, apply aluminium paint over DR. FIXIT TORCHSHIELD. For foot traffic area, overlay with concrete
not exceed 8% before taking up screed mortar.

Torchshield application
Frequently asked questions Application Areas Product used Features & Benefits

• Repairs to RCC members Dr. Fixit Pidicrete URP • White liquid, easily brush applied.
• Waterproofing SBR Latex for waterproofing • Useful as waterproofing coat.
mortars / concretes and repairs • Useful as a bonding agent between old and
¬ Can Dr Fixit Newcoat be applied over ¬ Can Dr Fixit Newcoat be used on old • In repair new concrete surfaces.
cementitious substrate directly ? bituminous or tarfelt roofs directly? mortars / concretes Pack size 500g, 1 Kg, • Excellent as a cement modifier.
No, it is not recommended . The unsound No. The bituminous treatment must be * For heavy duty use 5 Kg, 10 Kg, • 300 - 400 microns thick layer on two
surfaces should be repaired with Dr. Fixit completely removed. The exposed surface 20 Kg, 225 Kg coats of application.
Pidicrete URP modified mortar. must be levelled with 15 to 20 mm polymer • Repair mortar modified with Dr.Fixit Pidicrete
URP suitable for repairing of RCC slabs and
The surface should be cleaned and modified mortar, before Dr. Fixit Newcoat
other RCC members.
cementitious surfaces should be pre- is applied
wetted. After the surface attains a Coverage 20 - 22 sq. ft / Kg for two coats (URP +
saturated-surface -dry state it should be ¬ What kind of primer should cement in the proportion 1:1.5)
primed using Dr. Fixit Primeseal. be used before application of
Thereafter grids of 4 sq.mtr area should be • Cracks upto 3 mm. Dr. Fixit • Single component easy to use by
Dr. Fixit Torchshield ?
marked and on each grid, 2 litres of Crack-X-Powder adding water.
Use of a Solvent Bitumen based primer is a Non-shrink Powder • No shrinkage.
Dr. Fixit Newcoat should be applied must. For best results it is recommended to CrackFiller • Over coatable after curing.
use the Dr. Fixit Torchshield Primer • Excellent adhesion.
¬ Will Dr Fixit Newcoat effectively cover Pack size 500 g, 1 Kg and
the cracks that may appear after the 5 Kg Coverage 60 - 65 ft/ Kg for 5 mm x 5 mm groove.
¬ What is the difference between the two Mixing Ratio 2.5:1 (Powder : Water)
application ?
variants of Dr Fixit Torchshield - SBS by volume.
Dr. Fixit Newcoat can stretch to about modified and APP modified?
twice its length. Therefore, it can easily • Normal concrete Dr. Fixit Pidiproof LW • Waterproofs by cutting capillary pores.
The application method and areas of usage
accommodate the movement in hairline and plasters Liquid IntegralWaterproofing • Makes mortar / concrete cohesive
are the same for both the variants of compound
cracks, and has a crack-bridging ability up and homogeneous.
Dr. Fixit Torchshield. However there is
to 2 mm Packsize 200 ml, 1litre,5 • Less rebound loss during plastering.
just one difference. SBS modified Dr. Fixit • Confirms to IS : 2645 : 2003.
litre, 10litre, 20 litre
Torchshield is used for areas with climatic & 100 litre
¬ What is the life expectancy of temperature less than 5°C and APP Coverage Dr. Fixit Pidiproof LW 200 ml / 50 Kg
Dr Fixit Newcoat ? modified Dr. Fixit Torchshield should bag of cement.
Once it is applied, Dr. Fixit Newcoat has a be used for areas with climatic
long service life of 7 to 10 years temperature above 5° C • Over existing leaking Dr. Fixit Newcoat • Allows foot traffic.
terrace without Heavy duty, reinforced acrylic • Bridges cracks upto 2 mm wide.
dismantling old coating • Re-waterproof existing waterproofing systems
¬ How many coats of Dr Fixit Newcoat ¬ Can Dr Fixit Torchshield endure foot waterproofing system like like brick bat coba etc without breaking.
should be applied and at what intervals? traffic? Is it resistant to UV? brick bat coba, Pack size 4 & 20 litre • Ready to use, easy application.
Dr. Fixit Newcoat must be applied in Yes , Dr. Fixit Torchshield can endure foot concrete screeds etc. • Available in three colors, for controlled
minimum 3 coats to achieve 1 mm thickness traffic. Also , Dr. Fixit Torchshield is not application & aesthetic.
• Excellent UV resistance.
which gives maximum effectiveness . Both UV resistant. That is why, after application
• No protection required.
first and second coat should be allowed to of Dr. Fixit Torchshield, all non-foot-
dry for 6 - 8 hours each. The third coat traffic areas should be finished with Coverage 1.5 litre/ m2 / three coats at
should be allowed to dry for 72 hours aluminium paint for UV protection 1 mm thickness.

• Flat and sloped roofs of Dr. Fixit Torchshield • Heavy duty, torch-on waterproof membranes.
¬ Can Dr Fixit Newcoat be used on
large terraces APP / SBS • Long life, durable (membrane)
new slab? modified heavyduty • Available in 2, 3 & 4 mm thickness
Yes it can be only if the slab has a natural waterproof membrane • Can take thermal & structural
slope, In such cases it need not be covered stresses effectively.
with a screed or coba etc. But in case it Packsize Range of
does not have a natural slope, then a slope 2, 3 & 4 mm Coverage Approx. 8.91 sq. mtrs /
membranes in Polyester Roll of 1 mtr x 10 mtr (after overlaps)
has to be created
or fibre glass base in
1 mtr x 10 mtr rolls