Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
REL-HRTPP-VEM-143-C-1307
By YKS
Tecpro Systems Ltd. App. By SKM
Date 9/1/2008
Project : 2X600 MW HISAR THERAMAL POWER PLANT, HISAR
Client: M/s RELIANCE ENERGY LIMITED
Consultant: M/s DESEIN CONSULTING PVT. LTD
WIRE ROPE SPECIFICATION
Notes:
2 The bulldog gripes shall be supplied along with the necessary hardware as mentioned above
3 Inspection by TSL