Sei sulla pagina 1di 17

PROJECT: CONTRACT NO. (SA) PROJ. NO.

(GCC)

XX
JUBAIL EXPORT REFINERY PACKAGE 8 3000235451
DOCUMENT NO.
PIPELINES and OFFPLOT FACILITY
SA-JER-PI-801-GCCC-59-0035

SATORP
SAUDI ARAMCO TOTAL REFINING & PETROCHEMICAL COMPANY

CONTRACT FOR THE

ENGINEERING, PROCUREMENT AND CONSTRUCTION

JUBAIL EXPORT REFINERY PACKAGE 8


PIPELINES AND OFFPLOT FACILITY

REQUISITION
CUSTODY METERING SYSTEM

PREPARED BY PAL FOR

GCC (GULF CONSOLIDATED CONTRACTORS CO. LTD.)

03 June 2010 Issued for Review/Acceptance PAL GCC SATORP


02 May 2010 Issued for Review/Acceptance PAL GCC SATORP
01 March 2010 Issued for Review/Acceptance PAL GCC SATORP
00 October 2009 Issued for Review PAL GCC SATORP
Rev. Date Description Prepared Checked Approved

Page 1 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

1.0 REVISIONS

Item Description Remarks


Revision 00
1. Issued for Review

Revision 01
 L/I: 001 Corrected. Previously Reviewed Under (JER-35451-LET-PINP-
GCCC-2010-000298
 Package Scope Corrected.
 Inspection Level Specified.
2. Issued for Review / Acceptance
Revision 02
1. Delete L/I: 002 (Turbine Type)
Update Specification Sheet No. SA-JER-
P1801-GCCC-64-2113 & SA-JER-P1801-
GCCC-64-2202
Add New Specification Sheet No. SA-JER-
2. P1801-GCCC-64-2376 & SA-JER-P1801-
GCCC-64-2415
Update P&ID No. SA-JER-PI-801-GCCC-
3.
48-1027 & SA-JER-PI-801-GCCC-48-1028
4. Delete L/I: 1.03
5. Issued for Review / Acceptance
Revision 03
Update FSD No. SA-JER-P1801-GCCC-64-2113 &
1. SA-JER-P1801-GCCC-64-2415 as Per SATORP
Comments
2. Add JERES-J-503
3. Issued for Review / Acceptance

Page 2 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

Table of Contents
1.0 REVISIONS..........................................................................................................................................2

2.0 SCOPE OF SUPPLY...........................................................................................................................4


2.1 EQUIPMENT / MATERIAL DESCRIPTION................................................................................................5
3.0 GENERAL REQUIREMENTS.........................................................................................................8
3.1 DESIGN CHANGES..........................................................................................................................................8
3.2 MARKING.......................................................................................................................................................8
3.3 INTERPRETATION............................................................................................................................................8
3.4 PACKING........................................................................................................................................................8
3.5 SHIPPING WEIGHTS AND VOLUME.................................................................................................................9
3.6 TAGGING........................................................................................................................................................9
3.7 CONFLICTS, DEVIATIONS & EXCEPTION........................................................................................................9
3.8 THE PROPOSAL...............................................................................................................................................9
3.9 INCONSISTENCIES...........................................................................................................................................9
3.10 PAINTING & COATING....................................................................................................................................9
3.11 INSPECTION AND TESTING............................................................................................................................10
3.12 WARRANTY PASS-THROUGH STATEMENT....................................................................................................10
3.13 ENVIRONMENTAL CONDITIONS....................................................................................................................10
3.14 SPARE PARTS...............................................................................................................................................10
3.14.1 SPARE PART LISTS.......................................................................................................................................10
3.14.2 SPARE PART – MANUFACTURING OR SUPPLYING.........................................................................................11
3.15 SPECIAL TOOLS............................................................................................................................................11
3.16 ASSISTANCE DURING ERECTION...................................................................................................................11
3.17 ASSISTANCE DURING START-UP AND COMMISSIONING................................................................................11
3.18 REPORTING..................................................................................................................................................11
3.19 ALTERNATIVES............................................................................................................................................11
4.0 VENDOR DOCUMENT REQUIREMENT....................................................................................12
4.1 LANGUAGE...................................................................................................................................................12
4.2 VENDOR ENGINEERING REQUIREMENTS.......................................................................................................12
4.3 IDENTIFICATION...........................................................................................................................................12
5.0 LIST OF ATTACHMENTS.............................................................................................................13

6.0 NON-MATERIAL REQUIREMENTS...........................................................................................17


6.1 NON MATERIAL REQUIREMENTS (ATTACHED NRM-7907, 7918, 7919, 7923, 7925, 7927. 7930)..............17
6.2 ISO 9000 QUALITY SYSTEM REQUIREMENTS..............................................................................................17
6.3 Inspection & Test Plan (ITP).......................................................................................................................17

Page 3 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

2.0 SCOPE OF SUPPLY

Vendor shall be responsible for the design, engineering, supply of materials,


manufacturing, and assembly, shop testing, packing for delivery and operating and
maintenance manuals for the Equipment / materials listed in the present requisition.

All items not specifically mentioned in this specification, but necessary and required to form
an operational system as described herein, shall be identified and provided by the Vendor
as part of the system.

Any errors or omissions in this specification shall not absolve the Vendor from the
responsibility of designing and providing complete and fully functional equipment as
described in this requisition.

The design / manufacturing of the Equipment / Materials shall be in accordance to all


specifications, drawings, procedures, standards and other documents attached hereto and
with the best modern practice and shall be such to facilitate inspection, cleaning,
maintenance and repair to ensure satisfactory operation of the Equipment / Materials under
all service Conditions.

Page 4 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

2.1 EQUIPMENT / MATERIAL DESCRIPTION


Line DESCRIPTION
Item
Inspection Level: 1
Material No. = 6000009921
001 CUSTODY METERING SYSTEM (CORIOLIS TYPE)
QTY: 3 EACH
SUPPLY, DESIGN, ENGINEERING, FABRICATION, ASSEMBLY, DELIVERY, TESTING AND
COMMISSIONNING CUSTODY METERING SKIDS, METER PROVER SKID AND THE
METERING CONTROL SYSTEM TO SUPERVISE AND ASSISTS DURING INSTALLATION
OF THE SYSTEM.
ALL IN ACCORDANCE WITH THE ATTACHED JER ENGINEERING STANDARDS,
MATERIAL SYSTEMS SPECIFICATIONS, STANDARD DRAWINGS, INSPECTION AND
TEST PLAN, INTERNATIONAL CODES AND STANDARDS AS LISTED AND PROJECT
DRAWINGS PROCESS FLOW DIAGRAM, PIPING AND INSTRUMENT DIAGRAMS AND
FUNCTIONAL SPECIFICATION DOCUMENT AS TABULATED BELOW:

Item Pipeline Description Document # QTY (LT)


1.01 Benzene Products SA-JER-P1801-GCCC-64-2113 1
1.02 Propylene Products SA-JER-P1801-GCCC-64-2202 1
1.03 LPG Export Products SA-JER-P1801-GCCC-64-2376 1
1.04 Liquid Sulphur Products SA-JER-P1801-GCCC-64-2415 1

JER ENGINEERING STANDARD:


JERES-A-112
JERES -B-019
JERES -B-054
JERES -B-055
JERES -B-058
JERES -B-067
JERES -B-068
JERES -H-001
JERES -H-102
JERES -J-002
JERES -J-003
JERES -J-200
JERES -J-400
JERES-J- 503
JERES -J-902
JERES -L-105
JERES -L-108

Page 5 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

Line DESCRIPTION
Item
JER ENGINEERING STANDARD:
JERES -M-001
JERES -N-001
001 JERES -P-100
JERES -P-104
JERES -P-111
JERES -P-123
JERES -W-011
JERES -Y-103
JERES -Z- 001
JER MATERIAL SPECIFICATIONS:
JERMS-H-9080
JERMS –J-4118
JERMS -J-4119
JERMS –J-4120
JERMS -J-4511
JERMS -J-4517
JERMS -J-4525
JERMS -J-4611
JERMS -J-4711
JERMS -J-4718
JERMS -J-4820
JERMS -J-4821
JERMS -J-4830
JERMS -J-4831
JERMS -J-4913
JERMS -L-1010
JERMS -L-1017
JERMS -L-1038
JERMS -L-2005
JERMS -L-2011
JERMS -L-4001
JERMS -L-4035
JERMS -L-4041
JERMS -L-4042
JERMS -L-4048
JERMS -L-4051
JERMS -M-2007
JERMS -P-7503
JERMS -P-7515
JER STANDARD DRAWINGS:
JERSD-J-0002
JERSD-J-0073
JERSD-J-0048
JERSD-J-0049
JERSD-J-0050
JERSD-J-0080
JERSD-M-0015
JERSD-Y-0001

Page 6 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

Line DESCRIPTION
Item
JER INSPECTION AND TESTING:
JERITP-A-000003
JERITP-H-091300
001 JERITP-H-091900
JERITP-J-340100
JERITP-J-340200
JERITP-J-341000
JERITP-J-341900
JERITP-J- 342800
JERITP-J-342900
JERITP-J-343100
JERITP-J-344000
JERITP-J-347600
JERITP-L-010700
JERITP-L-013100
JERITP-L-022501
JERITP-L-026100
JERITP-L-043000
JERITP-L-043600
JERITP-M-120100
JERITP-P-170200
JERITP-P-173700

NON MATERIAL REQUIREMENTS:


NRM-7907
NRM-7918
NRM-7919
NRM-7923
NRM-7925
NRM-7927
NRM-7930

Page 7 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

3.0 GENERAL REQUIREMENTS

3.1 Design Changes

Any design changes recommended by the manufacturer, which will affect this
Requisition and/or Specifications, drawings, etc., shall be brought to the buyer’s
attention for buyer’s written approval before proceeding with the work.

3.2 Marking

Marking of the Equipment / Materials shall be as per requirements of the Requisition


and applicable standard.

3.3 Interpretation

In any instance where the name of a particular manufacturer appears herein, such
shall be interpreted to mean the product of that manufacturer or its equivalent
(unless purchase of a particular manufacturer’s product is shown as mandatory).

3.4 Packing

Vendor shall pack material to ensure environmental and transit protection of the
equipment and shall submit packing design and packing details for buyer’s approval.
The shipping marks are as follows:

CONTRACTOR : GCC (Gulf Consolidated Contractors Co. Ltd.)


CONSIGNEE : GCC (Gulf Consolidated Contractors Co. Ltd.)
PROJECT NAME : Jubail Export Refinery Package 8 Pipelines
and Offplot Facility
SATORP Requisition No. : SA-JER-PI-801-GCCC-59-0035
Place of Destination : Kingdom of Saudi Arabia
Equipment Item No :
Type of Storage :
Package No. :
Dimensions (L x B x H in cm) : ___________x__________x_________
Gross Weight (Kilogram) :

Page 8 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

3.5 Shipping Weights and Volume

Vendor shall provide shipping weights and volume per each equipment.

3.6 Tagging

Vendor shall provide and install stainless steel tags with all referenced engineering
tag numbers in accordance with the required attachments.

3.7 Conflicts, Deviations & Exception

In case of any conflict between the requirements of this document and the attached
specification or data sheet or deviations from the relevant SATORP Standard, the
conflict, deviation or exception shall be brought to the attention of the buyer for
resolution. Vendor shall provide listing of the exceptions, deviations or conflicts to
all Standards referred herein. Listing is to refer to number, name and section of the
standard to which reference is made. If no exceptions, conflicts or deviations to a
Standard, the Vendor is to state the same.

Vendor shall provide a point by point compliance to the applicable SATORP Material
specifications (JERMS). Any deviations and/or exceptions should be noted in the
point by point submission.

3.8 The proposal

The Proposal must include a list of exceptions / exclusions to the specifications


attached to the present enquiry.

Any exclusions I exceptions are not indicated in the proposal it will be understood
the proposal is in full agreement with the specification

3.9 Inconsistencies

If any inconsistency exists between these requisitions, the attached documentation


and other applicable SATORP documents, industry standards or drawings, the
inconsistency will be solved in writing.

3.10 Painting & Coating

Painting shall be in accordance with the attached Data Sheets.

Page 9 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

3.11 Inspection and Testing

Inspection and Testing requirements shall be in accordance with SATORP JERITP


FORMS.

Inspection Level for Equipment / Materials Mentioned in this MR shall be: 1


Level 1: Includes, as a minimum, pre-inspection meetings, “in progress” surveillance
inspection shall be on a regular basis (daily, weekly or bi-weekly), all witness and hold
points, final inspection, and release for shipment.

3.12 Warranty Pass-Through Statement

“Vendor and GCC (Gulf Consolidated Contractors Co. Ltd.) understand that GCC
(Gulf Consolidated Contractors Co. Ltd.) is contracting with Seller for the purchase of
goods hereunder for ultimate transfer to, and use by, the Saudi Aramco TOTAL
Refining & Petrochemical Company (SATORP) in Saudi Arabia. Therefore, Seller
agrees that, in any event, all rights of GCC (Gulf Consolidated Contractors Co. Ltd.)
for any failure to meet specifications, or any other breach of warranty, shall run to the
benefit of and be fully enforceable by SATORP.

3.13 Environmental Conditions

Vendor shall consider the Environmental Conditions at the site(s) as per SATORP
Standard JERES-A-112.

3.14 Spare Parts

3.14.1 Spare Part Lists


Vendor to submit following spare parts lists with the tender:
 Recommended spare parts for Initial Start up and Commissioning.
 Recommended special tools for Initial Start up and Commissioning.
 Recommended Spare Parts for two year Operation
 Recommended Materials / Consumables for one year Operation
 Recommended Capital Spares.

Page 10 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

3.14.2 Spare Part – Manufacturing or Supplying

Vendor to provide statement that spare parts for equipment/material quoted


will be produced for a minimum period of 10 years.
3.15 Special Tools

Special Tools required for the Erection of the Equipment or Materials shall be
included in the scope of supply.

3.16 Assistance during Erection

Vendor shall quote separately for vendor representation in event it is required during
Erection.

3.17 Assistance during Start-up and Commissioning

Should Services of the Vendor’s Representative be required during Start-up and


Commissioning that these services shall be included in vendor price.

3.18 Reporting

Progress Reporting shall be on a bi weekly basis starting one week from the date of
issue of the Requisition until fulfillment by the Vendor of all its duties and obligations
under the Purchase Order.

3.19 Alternatives

Vendor may submit or propose an alternative design.

As a minimum, following data is required:

 Detailed drawings, showing the design


 Description of the design and methods of Construction Calculations, clearly
justifying all the details of the design. The calculations shall be self-explanatory
and shall indicate the sources of information and the derivation of all parameters,
formula’s and assumptions used.

Page 11 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

4.0 VENDOR DOCUMENT REQUIREMENT

4.1 Language

All literature, documentation, correspondence, and other printed matter pertaining to


this Requisition shall be in the English language.

4.2 Vendor engineering requirements

The vendor shall be responsible as a minimum for:

A. Preparation and submittal of data sheets, calculations and drawings in English


Languages with Metric units.
B. Submittal of all manufacturers and sub-vendors drawing and data sheets as
identified in the non-material requirements section and attachments to this
requisition.
C. All vendor submittals shall be of microfilm quality (CAD drawings are preferred).
D. Requirements for final and Certified Documents are specified elsewhere.
E. Responsibility for all auxiliary equipment and their associated controls (if any).
F. Recommended spare parts and catalogue of all spare parts as per SATORP
requirements
Submission of all documents is an integral part of the Purchase Order Obligation.
The Purchase Order shall only be complete, when all document requirements
have been fulfilled and are accepted by Purchaser and Client.

4.3 Identification
All drawings, literatures, data sheets, certifications, etc., supplied by vendor shall
show the following information:
(a) SATORP Requisition No.: SA-JER-PI-801-GCCC-59-0035
(b) Purchaser Line Item Nº: 001
(c) Purchaser Plant Nº: 801
(d) Vendor’s Order Nº:
(e) Vendor’s name and address:
(f) Vendor’s Drawing Number:
(g) NRM Number:

Page 12 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

5.0 LIST OF ATTACHMENTS

ISSUE
DOCUMENT SHT. REV. TITLE
DATE
SA-JER-PI-801-GCCC-59-0035 1~17 03 06/2010 Requisition (This document)

NRM-7907 1~2 NMR - Instrumentation


NRM-7918 1~2 NMR - Safety Relief Valves
NRM-7919 1~2 NMR - Fabricated Pipe Bends
NRM-7923 1~2 NMR - Control Panels
NRM-7925 1~2 NMR - Valves All Types
NRM-7927 1~2 NMR - Fabricated Structure Steel
NRM-7930 1~2 NRM- For Custody Metering System
JERITP-A-000003 001 0 Inspection & testing requirement – Guidelines
JERITP-H-091300 001 0 Inspection & testing requirement – Coating
JERITP-H-091900 001 0 Inspection & testing requirement – Coating
Inspection & testing requirement – Valves Control-
JERITP-J-340100 1~2 0
General Service, Pneumatic
Inspection & testing requirement – Instrumentation
JERITP-J-340200 1~2 0
for Packaged Units
Inspection & testing requirement – Actuators
JERITP-J-341000 001 0
Valves
JERITP-J-341900 001 0 Inspection & testing requirement – Valves
Inspection & testing requirement – Mechanical
JERITP-J-342800 001
Meter Provers
Inspection & testing requirement – Meter: Flow,
JERITP-J-342900 001 0
Turbine.
Inspection & testing requirement – Instrument
JERITP-J-343100 001 0
Control Panels Indoor -Outdoor
Inspection & testing requirement – Programmable
JERITP-J-344000 001 0
Logic Controllers
Inspection & testing requirement – Instrumentation
JERITP-J-347600 001 0
and Thermocouple Extension Cable
JERITP-L-010700 001 0 Inspection & testing requirement – Pipe
JERITP-L-013100 001 0 Inspection & testing requirement – Pipe
JERITP-L-022501 001 0 Inspection & testing requirement – Flanges
JERITP-L-026100 001 0 Inspection & testing requirement – Fittings
JERITP-L-043000 001 0 Inspection & testing requirement – Valve Material
JERITP-L-043600 001 0 Inspection & testing requirement – Valves
JERITP-M-120100 001 0 Inspection & testing requirement – Steel Structure
JERITP-P-170200 001 0 Inspection & testing requirement – Motors, Electric
Inspection & testing requirement – Auxiliary
JERITP-P-173700 1~2 0
Electrical Systems

Page 13 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

ISSUE
DOCUMENT SHT. REV. TITLE
DATE
JERES-A-112 1 ~ 12 3 1/29/2009 Meteorological and Seismic Design Data
JERES-B-019 1 ~ 11 1 9/15/2008 Portable, Mobile and Special Fixed Firefighting
Access, Egress and Materials Handling for Plant
JERES-B-054 1 ~ 17 2 4/14/2009
Facilities
JERES-B-055 1 ~ 41 3 3/5/2009 Plant Layout
JERES-B-058 1 ~ 14 1 12/20/2008 Emergency Shutdown, Isolation & Depressuring
JERES-B-067 1 ~ 14 1 4/15/2009 Safety Identification and Safety Colors
JERES-B-068 1 ~ 66 1 10/22/2008 Determination of Explosion Hazard Zones 0,1,2
JERES-H-001 1 ~ 93 5 5/22/2009 Coating Selection & Application Requirements
JERES-H-102 1 ~ 12 1 2/3/2009 Safety Requirements for Coating Applications
JERES-J-002 1 ~ 76 5 5/22/2009 Regulated Vendors List for Instruments
JERES-J-003 1~8 0 4/28/2008 Instrumentation – Basic Design Criteria
JERES-J-200 1~11 0 4/29/2008 Pressure
JERES-J-400 1~17 1 5/07/2009 Temperature
JERES-J-503 1~123 1 09/15/2008 Process connection for Instruments & Analyzers
JERES-J-902 1 ~ 28 2 10/2/2008 Electrical Systems for Instrumentation
JERES-L-105 1 ~ 403 5 5/20/2009 Piping Material Specification
JERES-L-108 1 ~ 36 5 5/15/2009 Selection of Valves
Structural Design Criteria For non-Building
JERES-M-001 1 ~ 41 3 5/12/2009
Structure
JERES-N-001 1 ~ 22 3 2/10/2009 Basic Criteria for Industrial Insulation
JERES-P-100 1 ~ 53 4 4/21/2009 Basic Power System Design Criteria
JERES-P-104 1 ~ 32 3 4/21/2009 Wiring Methods and Materials
JERES-P-111 1 ~ 42 1 1/27/2009 Grounding
JERES-P-123 1 ~ 14 0 4/28/2009 Lighting
JERES-W-011 1 ~ 51 4 2/10/2009 Welding Requirements for On-Plot Piping
JERES-Y-103 1 ~ 136 2 9/26/2008 Royalty / Custody Metering of Hydrocarbon Liquid
JERES-Z-001 1 ~ 32 1 10/27/2008 Process Control Systems

JERMS-H-9080 1 ~ 20 0 4/28/2008 Shop-Applied Baked Internal Coatings


JERMS-J-4118 1 ~ 12 0 4/28/2008 Positive Displacement Meters
JERMS-J-4119 1 ~ 18 0 11/20/2008 Bi-Directional Meter prover
JERMS-J-4120 1 ~ 18 1 5/14/2008 Uni-Directional Meter Prover
JERMS-J-4511 1 ~ 12 0 4/28/2008 Chromatographs

Page 14 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

ISSUE
DOCUMENT SHT. REV. TITLE
DATE
JERMS-J-4517 1 ~ 14 0 4/28/2008 Density Meters
Automatic Sampling Systems for Crude Oil and
JERMS-J-4525 1 ~ 29 1 9/30/2008 Refined Products
Safety Relief Valves Conventional and Balanced
JERMS-J-4611 1 ~ 11 0 4/29/2008 Types
JERMS-J-4711 1 ~ 19 2 4/16/2009 Control Valve
JERMS-J-4718 1 ~ 15 0 4/29/2008 Electric Motor Operated Valve Actuators
JERMS-J-4820 1 ~ 23 0 4/29/2008 Instrument Control Cabinets- Indoor
JERMS-J-4821 1 ~ 11 0 4/29/2008 Instrument Control Cabinets- Outdoor
JERMS-J-4830 1 ~ 20 1 9/24/2008 Programmable Logic Controller
JERMS-J-4831 1 ~ 30 2 9/24/2008 Instrumentation for Packaged Units
JERMS-J-4913 1 ~ 14 2 2/2/2009 Instrumentation and Thermocouple Cable
JERMS-L-1010 1 ~ 15 0 4/28/2008 Fabricated Carbon Steel Piping
JERMS-L-1017 1 ~ 15 1 5/20/2008 Auxiliary Pipeline for Mechanical Equipment
JERMS-L-1038 1 ~ 10 0 4/28/2008 Small Direct Charge Purchases of Pipe
JERMS-L-2005 1 ~ 16 0 4/28/2008 Butt Welding Pipe Fittings
JERMS-L-2011 1 ~ 27 2 10/31/2008 Forged Steel Weld Neck Flanges
JERMS-L-4001 1 ~ 16 1 5/20/2008 Gate Valves
JERMS-L-4035 1 ~ 18 2 10/31/2008 General Requirements for Valves
JERMS-L-4041 1~9 1 5/20/2008 Expanding Plug Valve
JERMS-L-4042 1~8 0 4/28/2008 4-Way Diverter Valve
JERMS-L-4048 1 ~ 11 0 4/28/2008 Valve Inspection and Testing Requirements
JERMS-L-4051 1 ~ 12 1 5/20/2008 Ball Valves, API SPEC 6D
JERMS-M-2007 1 ~ 30 3 5/12/2009 Fabrication of Structural and Miscellaneous Steel
Severe Duty, Totally Enclosed Squirrel Cage
JERMS-P-7503 1~2 1 11/5/2008 Induction Motors to 500 HP
Auxiliary Electrical Systems for Skid-Mounted
JERMS-P-7515 1 ~ 26 0 4/28/2008 Equipment

JERSD-J-0002 001 0 01/2002 Thermowell Assembly and Details


JERSD-J-0048 1 ~ 70 1 07/2008 Pressure measurement on gas services
JERSD-J-0049 1 ~ 42 0 03/2008 Pressure measurement on steam services
JERSD-J-0050 1 ~ 41 0 03/2008 Pressure measurement on LPG services
JERSD-J-0073 001 0 07/2008 Field Mounting Details For Instruments
JERSD-J-0080 1 ~ 18 0 07/2008 General Rules for Instrument & Installation
JERSD-M-0015 001 1 08/2002 Anchor Bolts Details
JERSD-Y-0001 001 0 08/1998 Custody Transfer Metering and Proving Station

Page 15 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

ISSUE
DOCUMENT SHT. REV. TITLE
DATE
SA-JER-P1801-GCCC-64-2113 1-65 00 05/2010 Specification for Benzene Product Line
SA-JER-P1801-GCCC-64-2202 1-65 00 05/2010 Specification for Propylene Product Line
SA-JER-P1801-GCCC-64-2415 1-60 00 05/2010 Specification for Liquid Sulphur Product Line

SA-JER-PI-801-GCCC-48-1027 001 00 04/26/2010 Piping and Instrument Diagram


SA-JER-PI-801-GCCC-48-1028 001 00 04/26/2010 Piping and Instrument Diagram
SA-JER-PI-801-GCCC-48-1030 001 00 04/26/2010 Piping and Instrument Diagram

6.0 NON-MATERIAL REQUIREMENTS

Failure to submit the documents listed below shall cause the supply to be considered
unfulfilled.

Page 16 of 17
PROJECT:
JUBAIL EXPORT REFINERY PACKAGE 8
PIPELINES AND OFFPLOT FACILITY
DOCUMENT TITLE:

REQUISITION – CUSTODY METERING SYSTEM


DOCUMENT NO.: REVISION:
SA-JER-PI-801-GCCC-59-0035 03

All documents, even if preliminary, shall be stamped and signed by the supplier and show
SATORP Requisition number.

Final and Certified Documentation Package to be submitted in a format approved by


Purchaser and Client.

6.1 Non Material Requirements (Attached NRM-7907, 7918, 7919, 7923, 7925, 7927. 7930)

Vendor should submit NMR to GCC for verification and approval. SATORP should
approve any modification.

6.2 ISO 9000 Quality System Requirements

Vendor shall meet the Technical & Quality Requirements of the Work.

Vendors Quality System shall meet the appropriate ISO 9000 system requirements; The
Vendor shall be evaluated, approved and listed as accepted supplier by GCC and
SATORP prior to placing the purchase order.

6.3 Inspection & Test Plan (ITP)

Vendor shall prepare a Quality Control Plan for Review and Approval according to the
requirements of the Requisition, and Particularly SATORP JERITP FORMS.

Note: The ITP is required to be submitted by vendor along with the bid submission.

Page 17 of 17