Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1. Plug QA-ST unit into mains power 1.Select the test to perform and press the
supply. (Mains power is required to corresponding key on the front of the QA-
operate the QA-ST.) ST.
2. Plug the device under test (DUT) into 2. The measurement/result is shown on the
the mains power outlet on the front of the display.
QA-ST.
3. Connect the Kelvin Test Lead from the
Enclosure port on the QA-ST to an earth
connection on the DUT.
4. Connect any patient leads from the DUT
to the QA-ST Patient Leads inputs
starting with port 1, then port 2 and so
forth.
NOTE
Snap-to-banana adapters are supplied with the QA-
ST, allowing the simple connection of ECG electrode
snaps or pins to the patient lead inputs.
www.metron-biomed.com
6 OXXO
7 OXXX
8 XOOO
9 XOOX
10 XOXO
www.metron-biomed.com