purchased 4.761,0
million kWh of electricity from the 7
generator licensees in 2015, and ownerships of the NPTG SOSC used 149.9
million kWh of electricity of gross generation for internal use and losses of the
power transmission line and transformers, and it transmitted 4,611,0 million kWh of
electricity
to the 12 distribution licensees. It imported 176,3 million kWh of
electricity from the RFR and it paid 25.4 billion tugrug for custom and, 3.9 billion
tugrug for VAT. It exported 54.3 million kWh of electricity to the RFR. Oyu Tolgoi
LLC imported 1.090.0 million kWh of electricity from the PRC and it paid 220.3
billion tugrug for custom and, 34,0 billion tugrug for VAT.
1. Asian Development Bank - Energy Conservation project. Total amount is
1,811,683,8 US$. An interest rate of per annum is 2 percent and Loan repayment
period is in the years 1998-2031. The project implemented in the years 1998-2001.
By the under project at the 110, 220 kV 43 substations installed Kvantum 77 pcs,
Vectron 46 pcs, 35-220 kV current transformer 0,2s, 0.5s 270 pcs and 35 kV
voltage transformer 16 pcs. It supplied electric meter test PYC5050 4pcs and 4 pcs
model electric meter to test and warrant.
2. Germany - Energy Programme 1 project. Total amount is 2,739,923,7US$
. An interest rate of per annum is 1.75 percent and loan repayment period is in
the years 2003-2036. The project implemented in the years 2004-2006.
Establishment of SCADA system at the NDC. 13 substations of the integrated
system connected to the energy system and installed disconnectors block
contact and additional fiber optic cable and established monitoring system.
3. Germany - Energy Programme 1 project. Additional contract of the project.
Total amount is 4.156,242,6US$. An Interest rate of per annum is 1.75 percent
and repayment period is in the years 2003-2036. The project implemented in the
years 2007-2008.
110 kV Closed Switchgear at the Darkhan Power Plant that
old equipment were used about 40 years and rehabilitated 110 kV circuit breakers,
110 kV disconnectors, 110kV current and voltage transformers and relay protection
and automation .
4. Swedish International Development Agency / Sida / project. Total amount is
80.0 million SEK, which including in grant 57.8 million SEK, and 22.2 million SEK
concessionary credit. Loan repayment period is in the years 2012-2036. 15
substations of the company supplied and installed 62 type of 220, 110 kV circuit
breakers 76 pcs, current transformer 8 set,
voltage transformer 8 set, disconnector 22 pcs, 35kV 10 MVA reactor 1 pcs, 35kV
disconnector 2 pcs and panel for relay protection and automation 10 pcs.
5. Shivee - Ovoo Coal Mine Development Project . Total amount is 261,980, 000
JPY. Loan repayment period is 2012-2033. The project implemented in the years
2012-2013. 110 6 kV 6.3x2 mBa Shivee Ovoo substation, and18 km 110 kV
power transmission line rehabilitated and put into operation.
6. FRG. KfW project. Accumulator Battery supply rehabilitation . The project
implemented in 2009. Direct current supply or accumulator charger installed at the
12 substations of Ulaanbaatar branch, 4 substations of CRS and 3 substations of
SERB.
7. World Bank project. PowerFactory software of the DigSilent company. The
project implemented in the years 2011-2014.
The PowerFactory simulation
software of the DigSilent company that it received 4 special rights for regime
calculation, 1 special right for power system stability analysis system, and it is
used for normal and failure regime, and relay protection setting calculation.
8. FRG. KfW project. Establishment of a new Automatic Meter Reading System
(AMR). The project financed by the state budget in the years 2013-2014. Totally
200 pcs electric meters at the 33 substations of the CHP-s and CRETG SOSC.
Telemetric system of the Automatic Meter Reading System was established. 40
pcs GPRS Modems/IEDs in the field including Adaptation Work installed at the 5
power plants and 33 substations and electric meters of the incoming side put into
operation.
9. FRG. KfW project. Rehabilitation of the Switchyard in the Power Plant No3 and
4 . It financed by the state budget and implemented in 2006.
Oil breakers of the 110, 220 kV Switchyard rehabilitated by modern circuit
breakers. Old U-110 type 27 breakers secondary circuit cables and 81 pcs current
transformer with more detailing accuracy rehabilitated.
10. Millennium challenge corporation project . 110/35/10kV Nalaikh
substation rehabilitation. The project implemented in the years 2012-2013.
4 Cubicles, outgoings of the relay protection and automation of the 110 kV
Switchyard rehabilitated.
Projects Financed by the State Budget in the years 2012-2015.
Since 2012, biggest project and programs had been started at the energy sector.
The state budget had financed rehabilitations for the 110/35 /10V uul
substation,
urun substation, urun-goingol 110V 181,6 m power
transmission line, , Mandalgovi - 110 kV feeder of Choir substation, Mandalgovi
Tavantolgoi- 220 kV 248.5 km power transmission line, 220/110/35/10kV
Tavantolgoi substation, Tavantolgoi yuTolgoi -220V-double circuit 138m
power transmission line, 220/110/35/kV yuTolgoi substation, 110/6kV Burkhant
substation, and due to of failure elimination for the Darkhan- Selenge region,
rehabilitation of the power transmission line, electric meter renovation in the Central
region of the NPTG SOSC, Dalanzadgad -110V 86,9m power transmission line,
110/35/10kV Dalanzadgad substation, The New Ulaanbaatar International Airport,
or the Khushig Valley Airport 2 side power supply of 110/10V Khushigt
substation,
No
Company
name
S
International
LLC
Tsagaan
Khorol LLC
Altaitrest LLC
igonnnuur
LLC
Energy
International
LLC
DSEDC LLC
Projects
Rehabilitation of Choir, Mandalgovi substation , G-220V double circuit 248,5m power transmission line,
220/110/35/10V Tavantolgoi substation,
-- 220V 138m power transmission line,
rehabilitation of - 220/110/35V substation .
Rehabilitation o of Establishment of a new Automatic Meter
Reading System
110/35/10V Zalaat substation .
Rehabilitation of 1103510V Tuul substation,
220/110/35V Erdenet substation, installed capacity of
Autotransformer upto 200 mBa, renovation of relay
protection and automatation
Construction and Rehabilitation of 110/35/10V Sine
Yarmag substation
Rehabilitation of 110/35/6V urun substation , urungoingol 110V 181,6m power transmission line
The New Ulaanbaatar International Airport, or the Khushig
Valley Airport 2 side power supply 110/10V Khushigt
substation, 110V 83,3m power transmission line, Zaisan,
Bayangol, 14th khoroolol, rehabilitation of
220/110/35/10kV Ulaanbaatar substation, rehabilitation of
the Zaisan--14th Khoroolol 110 kV double circuit 1,6m
power transmission line and Bayangol-Songino 110 kV
double circuit 22m power transmission line.
EKHBUT
LLC
Erchim
Engineering
LLC
rkady LLC
10
Smart Craft
, gadenk
LLC
consertsium
11 Enkh Ugluu
LLC
Selection of Projects
No
Company
country
Number
company
Companies of
PRC
26
Companies of
the USA
Company of
Korea
Company of
Israel
Companies of
Mongolia
42
Selection of Projects
No
company
Number
company
Companies
PRC
of
26
Companies of
RFR
Companies of
4
5
6
the USA
Company of
Korea
Company of
Israel
Companies of
Mongolia
1
1
7
Sung ho
Satec
Measurement meter
PM130 , PM130 plus
1.
Power transmission line, and
substations foundation, structure, iron
and steel towers
Gantsatsal LLC, Orkhon khiits LLC,
Erchim suljee LLC, laky Life LLC, Mon
Tsaxilgaan utas LLC, Newprogress LLC,
EXBUT LLC .
42
10
1
2
3
4
5
6
7
8
9
10
11
12
13
Installed
capacity
Transformer
type
Manufacture
company
Khushigt110/10V
216
Taikai LLC
in China
Songino
220/110/35
V
2 125
Bayangol
110/35/10V
240
SFZ916.000/1
10
SFZ9125.000/
220
SFSZ940.000/1
10
Radiotelevisi
on
110/35/10V
240
7th khoroolol
110/35/10V
240
14th
khoroolol110/35/10V
240
Zaisan110/35/10V
240
Zalaat 110/35/10V
225
225
ShinYarmag110/35/10V
240
ByantUkhaa 110/10V
240
avantolgoi11
0/35/10V
216
Dalanzadgad110/35/10V
210
SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ925.000/1
10
SFSZ25.000/1
10
SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ16.000/1
10
SFSZ910.000/1
Year
2014
2016
TBEA
Shenyang
transformer
Group LLC
in China
LEEEC
LLC in
Chin
LEEEC
LLC in
China
Taikai LLC
in China
Taikai LLC
in China
Siemens
LLC in
China
TBEA
Shenyang
transformer
Group LLC
in China
LEEEC
LLC in
China
Taikai
company in
China
TBEA
Koncar
LLC in
China
Dandong
Xintai
2015
2015
2015
2016
2016
2015
2016
2016
2015
2014
2014
11
10
14
15
16
uul
110/35/10V
240
Burkhant
110/ 6 V
225
Umnud
110/10/6 V
263
SFPSZ940.000/1
10
SFZ925.000/1
10
SFSZ963.000/1
0
electric
LLC in
China
LEEEC
LLC in
China
Sieyuan
electric
LLC in
China
TBEA
Koncar
LLC in
China
2013
2014
2015
17
18
19
20
21
22
23
24
25
26
27
Erdenet
220/110/35V
2200
Switchyard-4 220/110/35kV
1125
Umnud
110/10/6kV
225
Umard
110/10/6kV
240
urun110/35/6kV
16,3
Bayankhongot
110/35/6V
26,3
Baruun110/10V
225
Khailaast
110/35/10V
225
mgalan
110/10V
Umnud
110/10/6V
225
urun
110/35/6V
16,3
263
OSFPSZ9200.000/220/1
10/35
OSFPSZ9125.000/220/1
10/35
SFSZ925.000/110
SFSZ940.000/110
SFSZ96300/110
SFSZ96300/110
SFSZ925.000/110
SFSZ925.000/110
SFSZ25.000/110
SFSZ963.000/110
SFSZ6300/110
LEEEC LLC in
China
2014
LEEEC LLC in
China
2010
Hubei sunlight
electric LLC in
China
Hubei sunlight
electric LLC in
China
Hubei sunlight
electric LLC in
China
Hubei sunlight
electric LLC in
China
Changed GUOLI
transformer Limited
company in China
BOADING
RAILWAY
transformer LLC in
China
People ELE LLC
in China
TBEA Shenyang
transformer Group
company in China
Yinchuan
transformer LLC in
2008
2010
2008
2005
2011
2009
2011
2015
2004
12
China
28
29
Bayanteeg
110/35/10V
16,3
sontsengel
110/35/10V
Total
110
SFSZ96300/110
SFPSZ940.000/110
Shandong Power
equipment LLC in
China
Bau toy qing dian
LLC in China
2005
2014
53/2347
Since 2005, due to lack of power transformers capacity, 110, 220 kV 6.3-200mBa
autotransformer 53 pcs installed at the new substations and increased transmission
capacity upto 2347mBa.
13
1
2
6
7
8
9
10
11
12
Installed capacity.
Power line
lenght. m
Tower
numbe
pcs
Tower
type
24,5
114
iron
19,2
97
iron
8,4
40
iron
14,9
58
iron
7,2
28
iron
1,6
iron
50
195
iron
34,6
155
iron
89
346
iron
48,6
188
steel
181,6
697
steel
245,8
827
iron
14
13
14
15
power transmission
line .
avantolgoi
Oyutolgoi - 220V
power transmission
line .
avantolgoi Dalanzadgad-220V
power transmission
line .
Nalaikh -5th tower
Zalaat - 110V power
transmission line
Total
138
454
iron
86,9
346
steel
1,52
Monop
ol
951,82
3215
15
Capacity building for environmentally sound PCBs management and disposal (
GF/MON/09/001),
Mongolia joined with the
2004. By the Convention
equipment by 2025 and
management and disposal
16
and Power
220 11035 kV Oyu Tolgoi substation will rehabilitate finally, and it will install AT-
17
Monitoring System for both side, therefore, Japan and Mongolian engineers will
cooperate jointly by one year, and it will submit summary to the NPTG SOSC and
then will finish project. The project engineers are studying Low loss Conductor
and Power Monitoring System.
18
of
Ulaanbaatar
rehabiliiated by SF6
and as a
substations improved.
5. 200 pcs electrc meters of the 55 substations rehabilitated and as a
consequence of integrated information system for the money estimation
meter and commercial system improved.
6. As a result of the new MG-TT-OT 220 kV double circuit 405 km power
transmission line and substations,
electricity to the strategic future projects for the solar and wind , and
Tavantolgoi, Ouy Tolgoi, and Tsagaansuvarga, NPTG SOSC reorganized
structure and
19
8. Murun- Mogoin gol 110 kV power transmission line connected to the Altai
Uliastai energy system, Western energy system connected to the Central
energy system and increased relaibility, and in the future, Taishir and
Durgun hydro power plants will connected and energy regime will be
improved.
9. As a resultt of rehabiliatation of Ikh Toirog project, future and nearest
electricity demand in Ulaanbaatar city to be supplied, reduced
substation load of old toirogs substations and improved reliability, also,
as a result of 220kV Songino substation