Sei sulla pagina 1di 22

Implemented Projects and Programs and Existing Ongoing Projects of the

NPTG SOSC
The NPTG SOSC
purchased 4.761,0
million kWh of electricity from the 7
generator licensees in 2015, and ownerships of the NPTG SOSC used 149.9
million kWh of electricity of gross generation for internal use and losses of the
power transmission line and transformers, and it transmitted 4,611,0 million kWh of
electricity
to the 12 distribution licensees. It imported 176,3 million kWh of
electricity from the RFR and it paid 25.4 billion tugrug for custom and, 3.9 billion
tugrug for VAT. It exported 54.3 million kWh of electricity to the RFR. Oyu Tolgoi
LLC imported 1.090.0 million kWh of electricity from the PRC and it paid 220.3
billion tugrug for custom and, 34,0 billion tugrug for VAT.
1. Asian Development Bank - Energy Conservation project. Total amount is
1,811,683,8 US$. An interest rate of per annum is 2 percent and Loan repayment
period is in the years 1998-2031. The project implemented in the years 1998-2001.
By the under project at the 110, 220 kV 43 substations installed Kvantum 77 pcs,
Vectron 46 pcs, 35-220 kV current transformer 0,2s, 0.5s 270 pcs and 35 kV
voltage transformer 16 pcs. It supplied electric meter test PYC5050 4pcs and 4 pcs
model electric meter to test and warrant.
2. Germany - Energy Programme 1 project. Total amount is 2,739,923,7US$
. An interest rate of per annum is 1.75 percent and loan repayment period is in
the years 2003-2036. The project implemented in the years 2004-2006.
Establishment of SCADA system at the NDC. 13 substations of the integrated
system connected to the energy system and installed disconnectors block
contact and additional fiber optic cable and established monitoring system.
3. Germany - Energy Programme 1 project. Additional contract of the project.
Total amount is 4.156,242,6US$. An Interest rate of per annum is 1.75 percent
and repayment period is in the years 2003-2036. The project implemented in the
years 2007-2008.
110 kV Closed Switchgear at the Darkhan Power Plant that
old equipment were used about 40 years and rehabilitated 110 kV circuit breakers,
110 kV disconnectors, 110kV current and voltage transformers and relay protection
and automation .
4. Swedish International Development Agency / Sida / project. Total amount is
80.0 million SEK, which including in grant 57.8 million SEK, and 22.2 million SEK
concessionary credit. Loan repayment period is in the years 2012-2036. 15
substations of the company supplied and installed 62 type of 220, 110 kV circuit
breakers 76 pcs, current transformer 8 set,
voltage transformer 8 set, disconnector 22 pcs, 35kV 10 MVA reactor 1 pcs, 35kV
disconnector 2 pcs and panel for relay protection and automation 10 pcs.

5. Shivee - Ovoo Coal Mine Development Project . Total amount is 261,980, 000
JPY. Loan repayment period is 2012-2033. The project implemented in the years
2012-2013. 110 6 kV 6.3x2 mBa Shivee Ovoo substation, and18 km 110 kV
power transmission line rehabilitated and put into operation.
6. FRG. KfW project. Accumulator Battery supply rehabilitation . The project
implemented in 2009. Direct current supply or accumulator charger installed at the
12 substations of Ulaanbaatar branch, 4 substations of CRS and 3 substations of
SERB.
7. World Bank project. PowerFactory software of the DigSilent company. The
project implemented in the years 2011-2014.
The PowerFactory simulation
software of the DigSilent company that it received 4 special rights for regime
calculation, 1 special right for power system stability analysis system, and it is
used for normal and failure regime, and relay protection setting calculation.
8. FRG. KfW project. Establishment of a new Automatic Meter Reading System
(AMR). The project financed by the state budget in the years 2013-2014. Totally
200 pcs electric meters at the 33 substations of the CHP-s and CRETG SOSC.
Telemetric system of the Automatic Meter Reading System was established. 40
pcs GPRS Modems/IEDs in the field including Adaptation Work installed at the 5
power plants and 33 substations and electric meters of the incoming side put into
operation.
9. FRG. KfW project. Rehabilitation of the Switchyard in the Power Plant No3 and
4 . It financed by the state budget and implemented in 2006.
Oil breakers of the 110, 220 kV Switchyard rehabilitated by modern circuit
breakers. Old U-110 type 27 breakers secondary circuit cables and 81 pcs current
transformer with more detailing accuracy rehabilitated.
10. Millennium challenge corporation project . 110/35/10kV Nalaikh
substation rehabilitation. The project implemented in the years 2012-2013.
4 Cubicles, outgoings of the relay protection and automation of the 110 kV
Switchyard rehabilitated.
Projects Financed by the State Budget in the years 2012-2015.
Since 2012, biggest project and programs had been started at the energy sector.
The state budget had financed rehabilitations for the 110/35 /10V uul
substation,
urun substation, urun-goingol 110V 181,6 m power
transmission line, , Mandalgovi - 110 kV feeder of Choir substation, Mandalgovi
Tavantolgoi- 220 kV 248.5 km power transmission line, 220/110/35/10kV
Tavantolgoi substation, Tavantolgoi yuTolgoi -220V-double circuit 138m
power transmission line, 220/110/35/kV yuTolgoi substation, 110/6kV Burkhant
substation, and due to of failure elimination for the Darkhan- Selenge region,
rehabilitation of the power transmission line, electric meter renovation in the Central
region of the NPTG SOSC, Dalanzadgad -110V 86,9m power transmission line,
110/35/10kV Dalanzadgad substation, The New Ulaanbaatar International Airport,
or the Khushig Valley Airport 2 side power supply of 110/10V Khushigt
substation,

110V 83,3m power transmission line, 220/110/35 V Erdenet substation, 200


autotransformer 2 pcs, extension of 110/10V Yruu- substation, 110/35/10V
Zalaat substation, and Establishment of a new Automatic Meter Reading System
in the Central Energy System put into operation at the NPTG SOSC. 9 companies
which in including Tsagaan Khorol, Altaitrest, MCS international LLC, Oigonnuur,
NPTG SOSC, Energy International, DSEDC LLC, Enkg-Ugluu and Newprogress
have been rehabilitated the above13 projects and totally was 239,0 billion
tugrug.
By the state investment, rehabilitated 220V 386,5m power transmission line,
110V 351,8 power transmission line, totally, 738,3m power transmission line,
220/110/35 V 200 autotransformer 2 pcs and 110V 6 substations and its
installed capacity is 264.
Projects Financed by the Ikh Toirog Investment in the years 2012-2015.
Since 2012, Ikh Toirog project has been starting and by the Mongolian Government
Resolution No 118 under framework of New construction defined projects of
the energy sector in the years 2013-2014, and rehabilitation investment for the 4
substations
Shune Yarmag, 14-th khoroolol, Yarmag guur, Byant Ukhaa
substations had decided by the three parties agreement that it financed by the
Developmnet Bank. By the project rehabiltated and put into operation 220/110/35V
Songino-substation, 110/35/10V
Bayangol substation, 110/35/10V

Radiotelevesion substation, 110/35/10V 7-th khoroolol substation, 110/35/10V


Zaisan substation, 110/35/10V 14-th khoroolol substation, 110/35/10V Shune
Yarmag substation, 110/35/10V Yarmag guur substation, 110/10V Byant Ukhaa
substation 220-kV 1 substation and 220V 10m power transmission line, ,110kV 9
substations and connected 110 kV double circuit 127 km power transmission line
with cross section 240.
Installed capacity of capacity is 710 mBa. Modern 110kV GIS equipment installed
at the 110kV New Yarmag and Radiotelevision substation.
7 companies which including EKHBUT LLC, Altai Trest LLC , Arkady LLC,
Erchim Engineering LLC , Tsagaan khorol LLC, Smart Craft LLC, Megadenky LLC
rehabilitated 16 projects of Ikh Toirog and total amount was
160, 6 billion tugrug.
Other Projects Rehabilitated by the NPTG SOSC in the years 2012-2015.
The following projects rehabilitated. It is as follows:
Nalaikh Salkhit 110V double circuit 27,9m power transmission line,
110/35V Salkhit Uul substation, 35V power transmission cable,
Sainshand-Urgun 110V 53,6m power transmission line, 110 kv Sainshand
feeder of 110/10V Bulagtai substation ,
110/10V Amgalan substation , Capacity building for environmentally sound PCBs
management and disposal (GF/MON/09/001),
rehabiltation of CHP-4 Block 7, -120130-130-8 Turbogenerator , higthing of
towers of 103-th ,104-th power transmission line,

rehabilitation of the 35kV Ganbumbulug feeder of power transmission line of Choir


substation, and installation of fiber optic cable in the between anchors No 1-59th of
the power transmission line No203-204,
to transfer and highting of power transmission lines s towers that crossing area in
the between Choir -Sainshand autoroad and 110V the power transmission line,
bushing of 10 kV T1 transformer of Eruu substation
rehabililtated by vacuum breaker and renovation of transformer protection .
The above 14 rehabiltation projects used own capacity and machine mechanism.
Total budget amount of agreement was 9.83 billion tugrug.
Also, by the request of Client, it had made agreement with the CID 4.3 million
tugrug, , PIU of Infrastructure- Energy project 12.0 million tugrug, EDDC 11.1
million tugrug for 3 projects, Khar Tumurlug LLC 7.2 million tugrug which in totally
was 34.6 million tugrug as well as, it given advice and inspected impelemetation.
It shows our companys capacity performance that staffs introduced a new
technic and technology, rehabiltation and testing.
Also, it is responsible for operation and maintenance of the new power transmission
line and substation for the Clean Energy LLC, and its yearly payment was 220
million tugrug .

Rehabilitation Projects of the Company

No

Company
name

S
International
LLC

Tsagaan
Khorol LLC

Altaitrest LLC

igonnnuur
LLC

Energy
International
LLC

DSEDC LLC

Projects
Rehabilitation of Choir, Mandalgovi substation , G-220V double circuit 248,5m power transmission line,
220/110/35/10V Tavantolgoi substation,
-- 220V 138m power transmission line,
rehabilitation of - 220/110/35V substation .
Rehabilitation o of Establishment of a new Automatic Meter
Reading System
110/35/10V Zalaat substation .
Rehabilitation of 1103510V Tuul substation,
220/110/35V Erdenet substation, installed capacity of
Autotransformer upto 200 mBa, renovation of relay
protection and automatation
Construction and Rehabilitation of 110/35/10V Sine
Yarmag substation
Rehabilitation of 110/35/6V urun substation , urungoingol 110V 181,6m power transmission line
The New Ulaanbaatar International Airport, or the Khushig
Valley Airport 2 side power supply 110/10V Khushigt
substation, 110V 83,3m power transmission line, Zaisan,
Bayangol, 14th khoroolol, rehabilitation of
220/110/35/10kV Ulaanbaatar substation, rehabilitation of
the Zaisan--14th Khoroolol 110 kV double circuit 1,6m
power transmission line and Bayangol-Songino 110 kV
double circuit 22m power transmission line.

Rehabilitation of 110/6V Burkhant substation .


110/6V Davkhar substation rehabilitation
110/6V Nalaikh substation extension
NPTG SOSC in the Central Region branch ,
renovation of electric meter

Rehabilitation of 220/110/35/10kV Tavantolgoi substation,


Tavantolgoi Dalanzadgad-110V- one circuit 1 m
power transmission line, and
110/35/10 kV Dalanzadgad substation
5

EKHBUT
LLC

Erchim
Engineering
LLC

rkady LLC

10

Smart Craft
, gadenk
LLC
consertsium
11 Enkh Ugluu
LLC

Rehabilitation of 220/110/35V Songino


substation, 10m 220V power transmission
line, from Songino substation to Zaisan 50
m double power transmission line
Rehabilitation of Ulaanbaatar substation, from
Ulaanbaatar substation to 7th khoroolol substation, 110 kV
double circuit 14.9km power transmission lines
rehabilotation , from 7th khoroolol substation to
Radiotelevision 110 kV
double circuit 8.4km power transmission line,
and rehabilitation of Radiotelevision - substation
from Radiotelevision to Bayangol substation 110 kV
double circuit 19.2km power transmission line,
from Ulaanbaatar substation to 14th khoroolol
substation, 110 kV double circuit 7.2km power
transmission lines rehabilitation ,

Rehabilitation of 110/35/10V Yarmag guur - substations


SCADA system.
Rehabilitation of 110/10kV ruu substation, 110/6v umerteisubstation and 110V 50 m powe transmission line

Selection of Projects

No

Company
country

Equipment and Supplier Company

Number
company

Equipment supplier companies


1.

Companies of
PRC

26

It is produced power transformer.


LEEEC- Liaoning-EfacecElectrical-Eguipment, ABB
Zhongshan Transformer,
Siemens, Sieyuan Electric,
Baoding Weifan,Taikai
2.
It is produced anchor tower and
power lines supports and
gantries.
Minyang Group Yueging
Imp&Rxp, Beijing Power
enjineering management &
consulting, Hebei Baoding Steel
Tower, Shandong Guangda steel
Tower. TianjingJintongco,ltd,
Gulifa company.
3. It is produced disconnector , circuit
breaker, current and voltage
transformers and reactors.
ABB-PKU Founder, Siemens ,
Sieyuan Electric, Jiangsu Rugao
High Voltage Electric, Pushin
Electric,Yueging Champin
Electric,HUYU,Taikai
4. It is produced 35,10,6 V complex
box
Delixi, CNC electric group,
Dandong Xintai electric, China,
5.
It is produced relay protection and
automation equipment and software.
Nanjing Nara.
6. It is produced tap changer of
power transformer.

Shanghai Huaming Power


Eguipment Shanghai.
7. It is produced power transformer
and circuit breakers bushings.

Trench High Voltage Products.

Trench groups branch, Canada


Shenyang ( THVS ) Shanghai
(MWB)
Companies of
RFR

Companies of
the USA

Company of
Korea

Company of
Israel
Companies of
Mongolia

Electroshit, Irkutsk zavod Tabrida


Electric transformer,Elester
SEL relay protection and
automation equipment
and software
Sung ho 220V anchor and
tower
Satec
Measurement meter
PM130 , PM130 plus
1.
Power transmission line, and
substations foundation,
structure, iron and steel towers
Gantsatsal LLC, Orkhon khiits
LLC, Erchim suljee LLC, laky Life
LLC, Mon Tsaxilgaan utas LLC,
Newprogress LLC, EXBUT LLC .

42

























Selection of Projects

No

company

Number
company

Equipment and Supplier Company

Equipment supplier companies


1.

Companies
PRC

of

26

Companies of
RFR

Companies of

It is produced power transformer.


LEEEC- Liaoning-Efacec-ElectricalEguipment, ABB Zhongshan Transformer,
Siemens, Sieyuan Electric, Baoding
Weifan,Taikai
2.
It is produced anchor tower and power
lines supports and gantries.
Minyang Group Yueging Imp&Rxp,
Beijing Power enjineering management &
consulting, Hebei Baoding Steel Tower,
Shandong Guangda steel Tower.
TianjingJintongco,ltd, Gulifa company.
3.
It is produced disconnector , circuit
breaker,
current and voltage transformers and
reactors.
ABB-PKU Founder, Siemens , Sieyuan
Electric, Jiangsu Rugao High Voltage
Electric, Pushin Electric,Yueging
Champin Electric,HUYU,Taikai
4. It is produced 35,10,6 V complex box
Delixi, CNC electric group, Dandong Xintai
electric, China,
5.
It is produced relay protection and
automation equipment and software.
Nanjing Nara.
6. It is produced tap changer of power
transformer.

Shanghai Huaming Power Eguipment


Shanghai.
7. It is produced power transformer and
circuit breakers bushings.

Trench High Voltage Products.


Trench groups branch, Canada
Shenyang ( THVS ) Shanghai (MWB)
Electroshit, Irkutsk zavod Tabrida
Electric transformer,Elester
SEL relay protection and automation
equipment and software
9

4
5
6

the USA
Company of
Korea
Company of
Israel
Companies of
Mongolia

1
1
7

Sung ho

220V anchor and tower

Satec
Measurement meter
PM130 , PM130 plus
1.
Power transmission line, and
substations foundation, structure, iron
and steel towers
Gantsatsal LLC, Orkhon khiits LLC,
Erchim suljee LLC, laky Life LLC, Mon
Tsaxilgaan utas LLC, Newprogress LLC,
EXBUT LLC .

42

































10

1
2
3

4
5
6
7
8
9

10
11
12

13

New Power Transformers of the NPTG SOSC


Substation

Installed
capacity

Transformer
type

Manufacture
company

Khushigt110/10V

216

Taikai LLC
in China

Songino
220/110/35
V

2 125

Bayangol
110/35/10V

240

SFZ916.000/1
10
SFZ9125.000/
220
SFSZ940.000/1
10

Radiotelevisi
on
110/35/10V

240

7th khoroolol
110/35/10V

240

14th
khoroolol110/35/10V

240

Zaisan110/35/10V

240

Zalaat 110/35/10V

225

Yarmag guur 110/35/10V

225

ShinYarmag110/35/10V

240

ByantUkhaa 110/10V

240

avantolgoi11
0/35/10V

216

Dalanzadgad110/35/10V

210

SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ925.000/1
10
SFSZ25.000/1
10
SFSZ940.000/1
10
SFSZ940.000/1
10
SFSZ16.000/1
10
SFSZ910.000/1

Year

2014
2016

TBEA
Shenyang
transformer
Group LLC
in China
LEEEC
LLC in
Chin
LEEEC
LLC in
China
Taikai LLC
in China
Taikai LLC
in China
Siemens
LLC in
China
TBEA
Shenyang
transformer
Group LLC
in China
LEEEC
LLC in
China
Taikai
company in
China
TBEA
Koncar
LLC in
China
Dandong
Xintai

2015

2015
2015
2016
2016
2015

2016

2016
2015

2014
2014

11

10
14
15

16

uul
110/35/10V

240

Burkhant
110/ 6 V

225

Umnud
110/10/6 V

263

SFPSZ940.000/1
10
SFZ925.000/1
10
SFSZ963.000/1
0

electric
LLC in
China
LEEEC
LLC in
China
Sieyuan
electric
LLC in
China
TBEA
Koncar
LLC in
China

2013

2014

2015


17
18
19
20
21
22
23
24

25
26
27

Erdenet
220/110/35V

2200

Switchyard-4 220/110/35kV

1125

Umnud
110/10/6kV

225

Umard
110/10/6kV

240

urun110/35/6kV

16,3

Bayankhongot
110/35/6V

26,3

Baruun110/10V

225

Khailaast
110/35/10V

225

mgalan
110/10V
Umnud
110/10/6V

225

urun
110/35/6V

16,3

263

OSFPSZ9200.000/220/1
10/35
OSFPSZ9125.000/220/1
10/35
SFSZ925.000/110
SFSZ940.000/110
SFSZ96300/110
SFSZ96300/110
SFSZ925.000/110
SFSZ925.000/110
SFSZ25.000/110
SFSZ963.000/110
SFSZ6300/110

LEEEC LLC in
China

2014

LEEEC LLC in
China

2010

Hubei sunlight
electric LLC in
China
Hubei sunlight
electric LLC in
China
Hubei sunlight
electric LLC in
China
Hubei sunlight
electric LLC in
China
Changed GUOLI
transformer Limited
company in China
BOADING
RAILWAY
transformer LLC in
China
People ELE LLC
in China
TBEA Shenyang
transformer Group
company in China
Yinchuan
transformer LLC in

2008
2010
2008
2005
2011

2009
2011
2015
2004

12

China
28
29

Bayanteeg
110/35/10V

16,3

sontsengel
110/35/10V
Total

110

SFSZ96300/110
SFPSZ940.000/110

Shandong Power
equipment LLC in
China
Bau toy qing dian
LLC in China

2005
2014

53/2347




Since 2005, due to lack of power transformers capacity, 110, 220 kV 6.3-200mBa
autotransformer 53 pcs installed at the new substations and increased transmission
capacity upto 2347mBa.


































13

New 220,110 kV Power Transmission Lines of the NPTG SOSC.






No

1
2

6
7
8
9
10
11
12

Power line name

Installed capacity.

Power line
lenght. m

Tower
numbe
pcs

Tower
type

Songino -Bayangol110V power


transmission line .
BayangolRadiotelevision 110V power
transmission line .
Radiotelevision -7khoroolol- 110V
power transmission
line .

Double circuit S-240/39

24,5

114

iron

Double circuit S- 240/39

19,2

97

iron

Double circuit S -240/39

8,4

40

iron

Double circuit S -240/39

14,9

58

iron

Double circuit S -240/39

7,2

28

iron

Double circuit S -240/39

1,6

iron

Double circuit S -240/39

50

195

iron

Double circuit S -240/39

34,6

155

iron

Double circuit S -400/40

89

346

iron

One circuit S-240/39

48,6

188

steel

One circuit S -120/20

181,6

697

steel

Double circuit S -300/49

245,8

827

iron

7-th khoroololUlaanbaatar- 110V


power transmission
line .
Ulaanbaatar 14- th
khoroolol- 110V
power transmission
line .
14- th khoroolol Zaisan- 110V power
transmission line ..
Zaisan - Songino110V power
transmission line .
Songino -Khushigt110V power
transmission line ..
Songino-TES-5220V power
transmission line .
Khushigt- Nalaikh110V power
transmission line .
Murun-goingol110V power
transmission line .
andalgoviavantolgoi - 220V

14

13

14

15

power transmission
line .
avantolgoi
Oyutolgoi - 220V
power transmission
line .
avantolgoi Dalanzadgad-220V
power transmission
line .
Nalaikh -5th tower
Zalaat - 110V power
transmission line
Total

Double circuit S -300/49

138

454

iron

One circuit S -120/20

86,9

346

steel

Double circuit S -150/25

1,52

Monop
ol

951,82

3215

15


Capacity building for environmentally sound PCBs management and disposal (
GF/MON/09/001),

Mongolia joined with the
2004. By the Convention
equipment by 2025 and
management and disposal

Persistent Organic Pollutants, Stockholm Convention in


all world will stop to use PCB-containing oil and
parties agreed about environmentally sound PCBs
by 2028.

By the Mongolian Government Resolution No 99 had approved program on


About Persistent Organic Pollutants and it noted that energy sector and other
sector will stop to use PCB containing oil and electrical equipment by 2020.
By the agreement on GF/MON/08/x02 in the between the UNIDO and Government
of Mongolia which was dated on 24 December, 2009 that
GEF will finance
2,650,000US$.
On 24 November, 2011, UNIDO and SEA MARCONY Technology LLC made
agreement on to supply modern technology equipment with type of DMU50.2000
24C .
By the joint order No A 17/16 of the Minister of Ministry of Environment and
Tourism and Minister of Ministry of Health, in concerning on the PCBs Rule for
the registration, collection, transport, storage, disposal , import, export, and to
transport by the border that PCB containing of equipment is higher than 20ppm,
which oil of imported equipment and PCB-containing of equipment is higher than
20ppm which equipment used in the local organizations, in that case it need to
treat PCBs in an environmentally sound manner as required by the Convention.

16

Planned Projects and Programs to Implement in 2016


Energy Efficiency in the Central Transmission and Distribution Network. In
according to the BMZ N2099 13 781, Ministry of Energy, LAHMEYER International.,
Germany and MonEnergyConsulting LLC Mongolia performed a Feasibility Study.
Financing institution is KfW Development Bank. Amount is 10.0 Million EURO. The
project proposes exchange of 110 kV breakers 90 pcs and 110 kV current
transformer 198 pcs, exchange of 35kV breakers 65 pcs and
195 pcs current
transformer, exchange of 220 kV Relay Protections & Automation for 4 substations,
and provide parallel operation of Autotransformer 1 and 2 at CHP-4 switchyard.
NPTG SOSC and Hitachi, Ltd ( Hitachi) , Japan have entered into ID based on the
Memorandum of Understanding on joint implementation of the Demonstration and
Verification Project for a High Efficiency and Law Loss Power Transmission and
Distribution System in Mongolia and the Project have agreed to suspect
on 23th
February, 2016. The Project is to contribute to low carbon development through
efficient use of energy and protection of the environment in Mongolia by carrying out a
demonstration and verification of high efficiency and low loss power transmission
using a LL-ACSR\AS conductor transmission line and power monitoring system to
broadly disseminate high efficiency and low loss power transmission and distribution
system and related technology. Necessary action based on the following items.
1. Supply of Low loss Conductor (LL-ACSR\AS 445 36 mm2)
Monitoring System .

and Power

2. Adaptability study of Low Loss transmission system under pecular


environment in Mongolia.
3. Comparative Testing of Transmission Loss between Conventional transmission
system and Low -Loss transmission system for 220 kV Transmission line
between Oyu Tolgoi and Tsagaan Suvarga quantification of amount of GHG
emission reduction, registration as JCM project, and MRV for amount of GHG
emission reduction.
4. Power System Analysis of
Mongolian Power network considering
development in future to study of Power Stability & Optimum Power system and
proposing minimization of Power Loss.

220 11035 kV Oyu Tolgoi substation will rehabilitate finally, and it will install AT-

17

125mBa autotransformer 2 pcs, to install 220, 110 kV outgoing feeders, will


finalize rehabiliation of relay protection, to finish rehabiliatation of OyuTolgoi
Tsagaansuvarga

220 kV power transmission line , to supply of Low loss

Conductor (LL-ACSR\AS 445 36 mm2) for one circuit,

and to install Power

Monitoring System for both side, therefore, Japan and Mongolian engineers will
cooperate jointly by one year, and it will submit summary to the NPTG SOSC and
then will finish project. The project engineers are studying Low loss Conductor
and Power Monitoring System.

18

Benefit and Efficiency of the Projects at the NPTG SOSC.


1. Energy balance Improved, reduced non technical losses, and established a
new SCADA system.
2. Power transmission line s reliability 220, 110 kV equipment of the CHP3,4 and DCHP Improved and increased operation level.
3. 220, 110 kV

oil breaker, current transformer, ODKZ

substation and 15 substations to be

of

Ulaanbaatar

rehabiliiated by SF6

and as a

consequence it, improved operation level and reliability and decreased


costs.
4. An existing old DC supply of 19 substations of the company reahabiliated,
due to of

new DC supply , relay protection and automation of the

substations improved.
5. 200 pcs electrc meters of the 55 substations rehabilitated and as a
consequence of integrated information system for the money estimation
meter and commercial system improved.
6. As a result of the new MG-TT-OT 220 kV double circuit 405 km power
transmission line and substations,

there wiil have possibility to supply

electricity to the strategic future projects for the solar and wind , and
Tavantolgoi, Ouy Tolgoi, and Tsagaansuvarga, NPTG SOSC reorganized
structure and

Govi regions branch was established.

7. Umnugovi aimag connected to the central energy system, and electricity


supply relaiablity of aimags and neighbor soums had improved.

19

8. Murun- Mogoin gol 110 kV power transmission line connected to the Altai
Uliastai energy system, Western energy system connected to the Central
energy system and increased relaibility, and in the future, Taishir and
Durgun hydro power plants will connected and energy regime will be
improved.
9. As a resultt of rehabiliatation of Ikh Toirog project, future and nearest
electricity demand in Ulaanbaatar city to be supplied, reduced
substation load of old toirogs substations and improved reliability, also,
as a result of 220kV Songino substation

a new CHP-5 will be provided

by 220kV two side relaible power supply, Ulaanbaatar- Mandalgovi will


be connected by 220 kV power transmission line, electricity reliablility of
Govi and South East region will be improved. Also, a new job vacancies
will be increased.
10. The New International Airport, or the Khushig Valley Airport of
Khushigt will have possibility 2 side power supply.
11. 110, 35 KV 160 pcs oil breakers will be exchaged by circuit
breakers, to be increased reliability of 110, 35 kV power
transmisison line, to be reduced operation costs as well as, in the
future world will refuse to use PCB-containing oil and equipment,
and Mongolia joined with the Persistent organic pollutants,
Stockholm Convention in 2004. By the Convention, it will stop to use PCBcontaining oil and equipment by 2025, and parties agreed about
environmentally sound PCBs management and disposal by 2028. Hence,
project will play main role in this time.
12. As a result of extension of Amgalan, Nalaikh, CHP-3, CHP-4 will provide
reliable supply possibilities of 50 MW CHP-3, 130 MW CHP-4, 300 MW
Amgalan CHP and 50 MW Salkhit park.

20

13. PowerFactory simulation software of the DigSilent company has possibility


to analyze power system stability analysis, calculation of normal and failure
regime in the energy sector, and
relay protection automation setting
calculation.
14. An income of electricity sale of the NPTG SOSC increased and improved
an economic efficiency.
Mr. Sulimov, Director and Mr. Samko U.G. Sales Deputy Director, PARMA
engineering company, Sankt Peterbur had met with Mr. Chinbat, Technical
Deputy Dirctor and Chief Enginner, NPTG SOSC , Mr. Byambatogtokh, Head
of PPD, Mr. Dashdavaa, Head of TPRD and Mr. Batbayar, Head of
RPAMD , and discudded about modern equipment and tools and technology.
After meeting, they explained about regime register equipment, measurement and
tester and had given answer for the questions. Also, they visited at the
Radiotelevision 110/35/10 kV substaion.