Sei sulla pagina 1di 2

No.

Etapele activitatii /Job


steps

Pericole
/ Hazards

Impact posibil
/ Possible impact

Contingenta
/ Contingency

Masuri de control / Control measures

Electroshock (N)
Touching hot parts (N)

1.

Preparation

Ensure everyone is trained


and knows the task

Ensure relevant vessel /rig


personnel are aware of the
tasks to be conducted

Assess environmental
conditions ( weather, wet
ground etc.)

Ensure worksite is free of


obstructions and hazards
are known /marked

Ensure the right tools and


equipment are at hand

Check the tools and


equipment before use

Ensure adequate
communications

Confirm location of
equipment and cable
routes with relevant
personnel

Fumes, dust (N)

Burns, injury, death due to


electroshock (IN)

Operator error (N)

Limb/torso//head injury (IN)

Caught in moving
machinery (N)

Respiratory disorders (IH)

Noise (N)

Hand injury (IN)

Hand Pinching / striking


(N)

Joints disorders (IH)

Sustained / frequent
physical effort (N)
Dropping equipment (N)
Contact with pointy
objects, sharp surfaces
(N)

Musculoskeletal disorders
(IH)
Feet injury (IN)
Damage to equipment (PL)
Delay in ops (SQ)

Vibrations and whiplash


(N)

Planning of activity: Specific Task Plan (DM)


Specific Equipment layout (DM)
Everyone aware of the task TBT and LMRA. (PC)
Ensure that personnel not involved in operations is kept clear of
working area (VC&PC)
Personnel training (PM)
Define roles of personnel on deck and establish positioning during
operations (VC&PC)
Supervised operations (PC)
Certified Equipment (PC)
Ensure all portable tools are regularly inspected and maintained
(PC)
All moving machinery should be guarded as far as possible (VC&PC)
Ensure safety devices are not bypassed or removed (operator)
Implementation of Permit to Work Procedure as appropriate (PC)
Protective equipment to be worn as per the above (operator)
Verify the voltage provided to each equipment (operator)
Ensure safety devices are maintained as operational and that operators
know the location of these devices and how to use them (VC)
Clearly marked and well defined electrical disconnects (VC&PC)
Consideration given to environmental conditions prior to starting work
No work to be undertaken in adverse weather conditions (PC)

Emergency Response
Plans- Vessel / Rig
Project incident reporting
and investigation
procedure
Contingency plan

Sparks, Debris (N)


Hazard trip/slips (N)

2.

Use of tools

Make sure that only the


adequate tools for the job
are used

Make sure that adequate


working positions are
employed

Ensure worksite is left safe


and clear

Hand Pinching (N)


Contact with pointy
objects, sharp surfaces
(N)
Electroshock (N)
Tripping / severing
cables (N)
Tripping/slipping/falling
on the same level/ from
height (N)

Page 1 from 2

Limb/torso/head/internal
organs injury due to fall (IN)
Burns, injury, death due to
electroshock (IN)
Musculoskeletal disorders
(IH)
Equipment loss (PL)

Sustained / frequent
physical effort (N)

Damage to equipment (PL)

Dropping equipment (N)

Delay in ops (SQ)

Planning of activity: Specific Task Plan (DM)


Specific Equipment layout (DM)
Everyone aware of the task TBT and LMRA. (PC)
Ensure that personnel not involved in operations is kept clear of
working area (VC&PC)
Ensure that a safety perimeter is established (PC)
Personnel training (PM)
Define roles of personnel on deck and establish positioning during
operations (VC&PC)
Supervised operations (PC)
Team work (PC)
Certified Equipment (PC)
Define roles of personnel on deck and establish positioning during
operations (VC&PC)
Protective equipment to be worn as per the above - Harness and work
vests to be worn for near/over the side works (operator)
Ensure all portable tools are regularly inspected and maintained
(PC)

Emergency Response
Plans- Vessel / Rig
Project incident reporting
and investigation
procedure
Contingency plan

No.

Etapele activitatii /Job


steps

Pericole
/ Hazards

Impact posibil
/ Possible impact
Hypothermia (IN, IH)

Incorrect installation /
rigging (A)

Drowning (IN, IH)


Death (IN)

Defective tools (A)


Mutual hindranceCONTRACTOR and
Vessel personnel (N)
Man overboard (E)

Masuri de control / Control measures

Visual checks of equipment and tools before operations (operator)


Make sure that only the adequate tools for the job are used (operator)
Make sure that adequate working positions are employed (operator)
All moving machinery should be guarded as far as possible (VC&PC)
Ensure safety devices are not bypassed or removed (operator)
Implementation of Permit to Work Procedure as appropriate (PC)
Cable runs on deck should be identified as a trip hazard (PC)
Maintain good housekeeping (operator)
Verify the voltage provided to each equipment (operator)
Verify/ confirm that equipment/ cables are not under tension while
working on them (operator)
Maintain good communications (operator)
Ensure safety devices are maintained as operational and that operators
know the location of these devices and how to use them (VC).

Echipa JSA / JSA Team


No.

Functie/Companie
Position / Company

Nume/Semnatura
Name/Signature

No.

1.

7.

2.

8.

3.

9.

4.

10.

5.

11.

6.

12.

Page 2 from 2

Functie/Companie
Position / Company

Nume/Semnatura
Name/Signature

Contingenta
/ Contingency

Potrebbero piacerti anche