2x150 MW Mine Mouth Coal fired TPP

Declaration of Performance
Guarantee

Schedule-3A/14
Declaration of Performance Guarantee

Bidder's Name and Address


Madhucon Projects Limited,
Madhucon House,1129/A,
Road no.36,

To
PT. MADHUCON SRIWIJAYA POWER
MENARA BIDAKARA, 3RD FLOOR
J1 GATOR SUROTO KAV 71-73

Hi-Tech City Road, Jubli Hills,

JAKARTA 12870

Hyderabad-500 003.

INDONESIA

We declare the ratings and performance parameters of the equipment furnished


by us under the EPC specification for "2 x 150 MW MINE MOUTH COAL FIRED
THERMAL POWER PROJECT" are guaranteed as per the guaranteed data
attached herewith. We further declare that in the event of any deficiencies in
meeting the guaranteed performance as established after conducting the
performance guarantee tests, you may at your discretion accept the
equipment/system after assessing the Liquidated Damage as specified or, reject
the equipment/system as specified.

Seal of Company

Feb 2013

Signature

: .........................

Name

: .........................

MPL/Technical Offer/Schedule-3A/14

Page 1 of 5

2x150 MW Mine Mouth Coal fired TPP

Declaration of Performance
Guarantee

Designation : .........................

Feb 2013

MPL/Technical Offer/Schedule-3A/14

Page 2 of 5

2x150 MW Mine Mouth Coal fired TPP

Declaration of Performance
Guarantee

Guaranteed Data

Sl
No.

Item

Unit

Guaranteed Data

Note

1.

Gross Output at the generator


terminal at TMCR

MW

150

2.

Auxiliary Power Consumption at


TMCR

MW

XXXX

3.

Gross Plant Heat Rate at TMCR

KCal/
KWH

XXXX

4.

The minimum availability of the


plant in the first twelve (12)
months of commercial service

85

5.

Steam Generator Maximum


Continuous Rating (SGMCR)

T/HR

xxxx

6.

VWO output at the generator


terminal

MW

157.5

7.

Gaseous Emission

As per
Environmental

guidelines
8.

Particulate Emission

50 mg/Nm3

9.

Noise Level

85 dB(A)

10.

Effluent discharge quality from


the Plant

As per
Environmental
guidelines

11.

Coal Handling Plant


Performance

As per
Specifications.

12.

Ash Handling Plant


Performance

As per
Specifications

13.

Water Pretreatment Plant


Performance

As per
Specifications

10

Feb 2013

MPL/Technical Offer/Schedule-3A/14

Page 3 of 5

2x150 MW Mine Mouth Coal fired TPP

Sl
No.

Item

14

Unit

Declaration of Performance
Guarantee

Guaranteed Data

Note

Intake System Performance

As per
Specifications

10

14.

Demineralisation Plant
Performance

As per
Specifications

10

15.

Air Conditioning & Ventilation


System Performance

As per
Specifications

11

16.

Emergency D.G. Set


Performance

As per
Specifications

12

17.

Air Compressor & Air Drying


Plant Performance

As per
Specifications

11

18.

Cooling Tower Performance

As per
Specifications

10

19.

CW System

As per
Specifications

20.

Fire fighting system

As per
Specifications

21.

Fuel oil system

As per
Specifications

22.

Electrical systems

As per
Specifications

23.

I&C system

As per
Specifications

24.

Coal Drying Plant Performance

As per
Specifications

NOTES :
1.

As per clause 7.01.00 and 9.00.00 of Vol-2, Section-1 of the Specification.

2.

As per clause 9.00.00 of Vol-2, Section-1 of the Specification.


A detailed list of all the auxiliaries considered in this guarantee is attached

Feb 2013

MPL/Technical Offer/Schedule-3A/14

Page 4 of 5

2x150 MW Mine Mouth Coal fired TPP

Declaration of Performance
Guarantee

herewith as
3.

As per clause 9.00.00 of Vol-2, Section-1 of the Specification.

4.

As per clause 9.00.00 of Vol-2, Section-1 of the Specification.

5.

As per clause 7.02.00 and 9.00.00 of Vol-2, Section-1 of the Specification.

6.

As per clause 7.03.00 and 9.00.00 of Vol-2, Section-1 of the Specification.

7.

As per Vol-2 Section-1 (Clause 9.00.00) and Vol-2 Section-8 of the


Specification

8.

As per Vol-2 Section-1 (Clause 9.00.00) and Vol-2 Section-5 of the


Specification.

9.

As per Vol-2 Section-1 (Clause 9.00.00) and Vol-2 Section-6 of the


Specification.

10. As per Vol-2 Section-7 of the Specification.


11. As per Vol-2 Section-1 (Clause 9.00.00) and Vol-2 Section-9 of the
Specification.
12. As per Vol-2 Section-1 (Clause 9.00.00) and Vol-2 Section-10 of the
Specification.,

Seal of Company

Signature

: .........................

Name

: .........................

Designation : .........................

Feb 2013

MPL/Technical Offer/Schedule-3A/14

Page 5 of 5