Sei sulla pagina 1di 11

Introduction

This survey and analysis aims to obtain data about the electrical energy
consumption of the SAC, Education and CSC building for one month (April to May)
and provide appropriate action plan to any energy-related problem found during the
survey. This includes the efficiency of the room with respect to the comfort of the
students using it.
The data will be gathered by collecting the power rating of each appliance in
each location (rooms and offices) and monitoring their time of usage.

Tabulated Data
SAC Building 1ST FLOOR
Location: DEAN OFFICE
Appliances/Load/Ou
tlets

Total No.
of Units

No. of
Working
Units
1
1
1
1
1

Area:11.1531 m2
Rating
Usage Consumption
(Watts)
(hours
(Watt-hour)
)
24W
80
1920
90W
40
3600
60W
60
3600
300W
60
18000
330W
60
19800

Fluorescent Lamp
1
ACER Laptop
1
Computer Speaker
1
Computer Monitor
1
Computer Power
1
Supply
Rice Cooker
1
1
627W
Refrigerator
1
1
75W
GE Water Dispenser
1
1
650W
Canon Printer
2
2
80W
Outlets
1
1
Wi-Fi Router
1
1
9.9W
Panasonic Aircon
1
1
1210
Analysis/Notes: Insufficient lightings. No Electric
fun, substitute for
air-conditioning unit.
High Power Consumption

Location: Chairman OFFICE


Appliances/Load/Ou
tlets

Total No.
of Units

No. of
Working
Units
1
3
1
1
1

6270
16800
104000
1280

160
160
Total

1782
193600
370652

Area: 11.1531
m2
Rating
Usage
(Watts)
(hours
)
24W
80
65W
40
60W
60
300W
60
330W
60

Fluorescent Lamp
2
Laptop
3
Computer Speaker
1
Computer Monitor
1
Computer Power
1
Supply
Water Dispenser
1
1
505W
Canon Printer
2
2
80W
Projector
2
1
550W
Outlets
2
2
Carrier Aircon
1
1
1865
Analysis/Notes: Insufficient lightings. No Electric
fun, substitute for
air-conditioning unit.
High Power Consumption

Location: Multi-Purpose Room


Appliances/Load/ Total No.
No. of
Outlets
of Units
Working
Units
Fluorescent Lamp
24
10
Electric Fan
2
1
Outlets
7
5

10
480
160
8

160
8
20
160
Total

Consumption
(Watt-hour)
1920
7800
3600
18000
19800
80800
1280
11000
298400
442600

Rating
(Watts)

Usage
(hours)

Consumption
(Watt-hour)

24W
280W

20
120

4800
33600

Analysis/Notes: Insufficient lightings.

Total

38400

SAC Building 2nd FLOOR


Location: ABE Department
Appliances/Load/Ou Total No.
tlets
of Units

No. of
Working
Units
1
3
1
1
1

Area: 16.2545 m2
Rating
Usage Consumption
(Watts)
(hours
(Watt-hour)
)
24W
80
1920
65W
40
7800
60W
60
3600
300W
60
1800
330W
60
19800

Fluorescent Lamp
1
Laptop
3
Computer Speaker
1
Computer Monitor
1
Computer Power
1
Supply
Water Dispenser
1
1
505W
Canon Printer
2
2
80W
Outlets
2
2
Panasonic Aircon
1
1
1890
Analysis/Notes: Insufficient lightings. No Electric
fun, substitute for
air-conditioning unit.
High Power Consumption

160
8
160
Total

Location: Education Department Rm. 1


Area: 25.2222 m2
Appliances/Load/ Total No.
No. of
Rating
Usage
Outlets
of Units
Working
(Watts)
(hours)
Units
Fluorescent Lamp
1
1
24W
80
Laptop
2
2
65W
40
Computer
1
1
60W
60
Speaker
Computer
1
1
300W
60
Monitor
Computer Power
1
1
330W
60
Supply
Water Dispenser
1
1
505W
160
Canon Printer
1
1
80W
8
TV
1
1
75W
10
Outlets
1
1
Panasonic Aircon
1
1
1210
160
Analysis/Notes: Insufficient lightings. AirTotal
conditioning unit need to
be replaced

Location: Education Department Rm. 2


Appliances/Load/ Total No.
No. of
Outlets
of Units
Working
Units
3

Area:18.6304 m2
Rating
Usage
(Watts)
(hours)

80800
1280
302400
419400

Consumption
(Watt-hour)
1920
5200
3600
18000
19800
80800
640
750
193600
324310

Consumption
(Watt-hour)

Fluorescent Lamp
1
1
24W
Laptop
1
1
65W
Outlets
1
1
Panasonic Aircon
1
1
1210W
Analysis/Notes: Insufficient lightings. Airconditioning unit need to
be replaced

80
40
160
Total

1920
5200
193600
200720

Education Building
Location: Education Rm. 1
Appliances/Load/ Total No.
Outlets
of Units

No. of
Working
Units
Fluorescent Lamp
3
1
Electric Fan
6
5
Outlets
2
2
Analysis/Notes: Insufficient lightings.

Location: Education Rm. 2


Appliances/Load/ Total No.
Outlets
of Units
Fluorescent Lamp
4
Electric Fan
3
Outlets
4
Analysis/Notes: Insufficient .

No. of
Working
Units
3
1
4

Rating
(Watts)

Usage
(hours)

Consumption
(Watt-hour)

24W
62W

60
120

1440
37200

Total

Rating
(Watts)

Usage
(hours)

Consumption
(Watt-hour)

24W
62W

60
120

4320
7440

Total

Location: Education Rm. 3


Appliances/Load/ Total No.
Outlets
of Units

No. of
Working
Units
Fluorescent Lamp
6
6
Electric Fan
2
2
Outlet
4
4
Analysis/Notes: Insufficient lightings.

38640

11760

Rating
(Watts)

Usage
(hours)

Consumption
(Watt-hour)

24W
62W

60
120

8640
14880

Total

23520

CSC Building
Location: CSC Office
Appliances/Load/ Total No.

No. of

Rating
4

Usage

Consumption

Outlets

of Units

Working
Units
4
1

(Watts)

Fluorescent Lamp
8
24W
Computer
1
60W
Speaker
Computer
1
1
300W
Monitor
Computer Power
1
1
330W
Supply
Water Dispenser
1
1
505W
Outlet
2
2
Panasonic
1
1
1864
(Single-Split)
Analysis/Notes: Air-conditioning Unit provide
repair/maintenance

(hours)

(Watt-hour)

60
60

4800
3600

60

18000

60

19800

60

30300

160

298240

Total

358540

Building:
SAC____________
Cooling
Capacity
Aircon
Type

Qu
an
tit
y

Model/
Type

KJ/
hr

TR

Opera
ting
Hours/
Day

Area
Serve
d
m
2

m
3

16
.2
54
5
18
.6
30
4
25
.2
22
2
11
.1
53
1
11
.1
53
1

46
.2
38
6
52
.9
97
2
71
.7
48
1
32
.2
93
3
32
.2
93
3

En
er
gy
Effi
cie
nc
y
Ra
tio

Wattag
e
M
o
t
o
r

Co
mpr
ess
or

Date
Purch
ased

A. Operational Units
Panasoni
c
Panasoni
c
Panasoni
c
Panasoni
c

Carrier

CWSC184E
PH

199
00

699
82

CWXC125V
PH

130
00

457
17

CWXC125V
PH

130
00

457
17

CWXC125V
PH

130
00

457
17

WCARG
008EC2

160
00

562
67

B. Non-Operational Units

10.
5
10.
7
11.
7
12.
7

1
8
9
0
1
2
1
0
1
2
1
0
1
2
1
0
1
8
6
5

2/27/2
014
2/27/2
014
2/27/2
014
2/27/2
014
2/27/2
014

Building:

CSC ____________

Aircon
Type

Qu
ant
ity

Mod
el/Ty
pe

Cooling
Capacity

KJ/
hr

Oper
ating
Hour
s/Day

TR

Area
Served

m2

m3

39.
315
4

113.
836
2

En
erg
Wattage
y
Effi
cie
nc M
Com
y
ot
pres
Ra o
sor
tio
r

Dat
e
Pur
cha
sed

A. Operational Units
Panasonic
(SingleSplit)

CSS24P
KQ

B. Non-Operational Units

13

1
8
6
4

2/27
/201
4

Data Summary
Location: 1st Floor, SAC BUILDING
DEAN OFFICE
CHAIRMAN OFFICE
MULTI-PURPOSE ROOM
Total

Consumption (KW/HR)
370.652
442.6
38.4
851.652

Location: 2nd Floor, SAC BUILDING


ABE DEPARTMENT
EDUCATION DEPARTMENT RM.1
EDUCATION DEPARTMENT RM.2
Total

Consumption (KW/HR)
419.4
324.31
200.72
944.43

Location: EDUCATION BUILDING


EDUCATION RM. 1
EDUCATION RM. 2
EDUCATION RM. 3
Total

Consumption (KW/HR)
38.64
11.76
23.52
73.92

Location: CSC BUILDING


CSC OFFICE
Total

Consumption (KW/HR)
358.54
358.54

BUILDING
SAC BUILDING
EDUCATION BUILDING
CSC BUILDING
TOTAL

Consumption (KW/HR)
1796.082
73.92
358.54
2228.542

Data Analysis
7

Based on the tabulated data, it shows that most of the power consumption of
the buildings are from SAC Building, where a lot of Appliances and air conditioning
systems are being used simultaneously throughout the day. This is due to the fact
that most of the time especially from April-May is a summer time so that the usage
of air conditioning unit is maximized. Some of the bulb sockets in SAC are not
functioning and this is one way of wasting energy.
Faculty rooms in SAC building need additional outlets to prevent short circuits
because of using extension wires as a source of energy for doing many tasks like
charging, cooking in rice cookers, heaters ,and electric fans.
In Education rooms like in Room no.1 have 3 bulbs but only one are
functioning and they need to replace it for the convenience of the students and
some of the electric fans in room no. 2 are in need of repair .
In CSC building, 4 fluorescent bulbs are only functioning out of 8 and we need
to replace 4 bulbs with new bulbs.

The Action Plan


Implementation
Objective

To reduce Energy
Consumption

Activities/ Action

In charge

Time

Resources

1
week

Posters advising the


turning-off of appliances
when leaving the room
(with the approval of the
department head)

Posting Advisory

The Whole Team

To improve
lightings in the
SAC,CSC building
& EDUC room 1-3

Replacement of
broken
fluorescent lamps

The Whole Team


(with the
guidance of an
electrician)

1
week

Compact Fluorescent
Lamps from university
budget

To improve
ventilation in
Educ. Rooms(1-3)

Replacement of
broken electric
fans

The Whole Team


(with the
guidance of an
electrician)

1
week

Electric Fans from


university budget

Maintain Air
Conditioning
system efficiency
in SAC and CSC
building

Checking and
cleaning
compressor and
filter

The whole team

Once
a
mont
h

Improve overall
performance of
building

Checking and
repairing of
electrical circuit
wirings of the
building

The Whole Team


(with the aid
and guidance of
an electrician)

1
mont
h

Evaluation
Progress
Expected Output
Indicator
Reduced Energy
Consumption
Increase in energy
consumption in
exchange for the
comfort of the
students
Increase in energy
consumption in
exchange for the
comfort of the
students

Appliances
are being
turned off
properly
CFLs are
being
replaced

Electric fans
are being
replaced

Brush

Decreased power
consumption and
increase efficiency
of AC

AC has
better
output

Electrical Equipment

Full operation of all


electrical outlets,
lights, etc.

Everything
are working
properly

Eviden
ce

Conclusion/ Recommendation
The action plan could not be accomplished due to the time
required to fulfil every task in the plan. Instead, the team
recommends that, anyone who is willing to conduct a survey
regarding the power consumption of the SAC, CSC building and
Education Room 1-3 should do their survey and analysis with
enough time to accomplish every task in their action plan.
Also, installing a sub meter in all buildings will allow anyone to
monitor their consumptions.