Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Delhi
S Vikash Ranjan
Technical Expert
BEE
A. Baseline Setting
1.
2.
3.
B. Target Setting
1.
2.
3.
4.
5.
1
2
Item
PAT Cycle I
PAT Cycle II
478 DCs
Existing DCs
478 Nos
New DCs in
Existing
Sector
Data
Reporting
Five Years
One Year
15)
Three Years
(2012-15)
Three Years
(2005-10)
Baseline Year
Average of
three years
One year
(2014-15)
(2014-
(2012-15)
15)
(2007-10)
Pro-forma
Through Form
I and Proforma
Through
developed
Form I and Proforma
Through
developed Form
I and Pro-forma
Pro-forma
development under
final stage through
Form I and Proforma
Data
Verification
Baseline
Energy Audit
M&V
Baseline Data
Verification
through proforma
Baseline Data
Verification through
pro-forma
Data Fixation
Baseline
Energy Audit
In Assessment
year
M&V with
certain
changes in
Formulae of
Baseline data
Verification
Report
Baseline data
Verification Report
Plant
Plant
Plant
Plant
Plant
1
2
3
4
5
Baseline Baseline
Average
Average
Production
SEC
Tonne
toe/t
369939
1.274
358967
1.364
178530
1.400
79587
1.428
37635
1.780
Realtive
SEC
Total Energy
Consumption
%Target
Savings
1.000
1.071
1.099
1.121
1.397
toe
471302
489631
249942
113650
66990
1391516
x
1.07x
1.10x
1.21x
1.40x
4713.023
5242.203
2746.615
1273.882
935.9712
14911.7
Total
Saving
Target
Saving
x
14912.7
x
toe
104000
toe
6.97
To be
Energy
Saving
4713.02x
5242.20x
2746.61x
1273.88x
935.97x
14912.7x
toe/t
toe/t
Plant 1
1.274
6.97
1.185
Plant 2
1.364
7.467
1.262
Plant 3
1.400
7.664
1.293
Plant 4
1.428
7.817
1.316
Plant 5
1.780
9.744
1.607
Total energy consumption at the end of three
years
Plant
To be toe
toe
438434
453072
230787
104766
60463
1287523
1391516
103993
Existing DCs
As per Rule 14 of Energy Conservation Rules, 2012
SEC achieved -Un-normalised in the target year 201415
The existing Product-mix normalisation to be made for
the year 2014-15 (The energy factor/Ratio/Clinker
factor for target to changed as per target year factor)
Intermediary product effect is same as per Pro-forma
Power Export as per Weighted Heat Rate to be made
for the year 2014-15
As Fired GCV will be used for determining the thermal
energy consumption for SEC calculation
Other normalisation effect to be reviewed for impact in
the SEC in the target year
Existing DCs
Rule 14: The energy consumption norms
and standards achieved by the designated
consumer on the completion of the target
year, as mentioned in the compliance
report in Form-'D' shall be the baseline for
establishment of new plant specific energy
consumption norms and standards for
designated consumers for the next cycle.
PAT Cycle I Un-normalised SEC of Assessment year will be considered as Baseline year SEC for
the existing DCs in PAT Cycle II
OR
AND
OR
[C] Plants
Life <3 years
and Data
reported<3
years but >1
year
AND
AND
Baseline SEC:
SEC of Last
Financial year
AND
AND
[D1] Capacity
Utilisation>70%
[C.1] Plants
Life <3 years
OR
and Data
reported=1
year
[D2] Capacity
Utilisation<70%
AND
Baseline SEC:
SEC calculated
average of
years
AND
[D3] Capacity
Utilisation>70%
AND
Baseline SEC:
SEC calculated
one year
Last financial year of three year reported data will be considered as the Baseline year for the new
DCs in PAT Cycle II (Majority of the DCs)
Capacity Utilisation
The Capacity Utilisation referred to in this rule is the ratio of actual production(s) per unit of
time, to maximum potential installed or established production capacity per unit time of a
unit/major process of plant/establishment for the operating period(s).
(g) The Capacity Utilisation and Plant Loading Factor shall be calculated as per following
equations:
Capacity Utilisation:
Capacity Utilisation % (CU%) =
(C1 x ICU1+C2 x ICU2+.Cn x ICUn)*100/(C1+C2+.Cn)
Where: ICU1n = (P 1..n x 8760)/(Hr1..n x C 1..n)
C 1..n = Installed or Established Production capacity in tonne per annum for 1..nth product
P 1n = Actual Production in tonne per anuum for 1..nth product
Hr1..n = Nos of operating hours in Hours per annum for 1..nth product
ICU 1..n = Intermediate Capacity utilization of 1..nth product for the operating period
Thus, the Plant Loading Factor is the percentage ratio of Plant Load Factor (PLF) and Plant
Availability Factor (PAF) on bar.
Target Setting
Proposed to be based
Average rate of
reduction in specific
energy consumption
(SEC) across all the
designated consumers
sectors + Policy
objectives of keeping
the target of reducing
the specific energy
consumption a few
percentage points
above the average rate
of reduction
Target Setting
(II ) Policy objectives
INDC
Intended Nationally determined Contribution (INDC): reduction of
emission intensity by 33-35% of GDP by 2030 from the base year of 2005
GOALS
Reduction in energy intensity between 2016 and 2019 by 7 %
Target Setting
% rate of reduction per year as per
policy objective (Energy
Conservation)= 2.3% per year
Net ESCerts available in PAT Cycle II
will be over 2 mtoe
Total Saving Required: 19.6 + 2 =
21.6 mtoe
Global best DC
Sector
Differentiation between
Global best and other
sector
The target for the global
best sector(s)
The target for other
sector
Target Setting
Global best DCs sector
The energy consumption
=(Overall percentage of
norms and standards for
all designated consumer
sectors of respective cycle
x total energy
consumption of all nonglobal best designated
consumer sectors(s) (toe))
+ [1/3 x(ESCerts IssuedESCerts to be purchased,
for 3 previous cycles
irrespective of sector)]
Target Setting
Zero Energy Saving Target for first 10% DCs for greater
than 25% difference
(For the first cycle of a DC and except TPP sector)
All Sub-sector of sector (Sub-Sector having > 10 Nos of
DCs)
if (Lowest specific energy consumption-weighted average
specific energy consumption of designated consumers ) > 25%,
then there will be Zero Energy Saving Target for first 10%
DCs
All Sub-sector or sub-group of a sector (Sub-Sector having < 10 Nos of
DCs) then Energy Saving Target for the most efficient DC shall be as per
following equation
% Energy consumption norms and standards in current Cycle of DCs= A
Achieved % Energy consumption norms and standards in the previous cycle DCs:
B
% Energy consumption norms and standards in previous Cycle of DCs: C
If (B-C) 0 then % Energy consumption norms and standards for a designated
consumers shall be =A-(B-C)
If (B-C) < 0 then % Energy consumption norms and standard for a designated
consumers shall be as per Rule 6 excluding (vi)
If (B-C) > A, Then % Energy consumption norms and standard for a designated
Target Setting
Zero Energy Saving Target for first 10% DCs for greater
than 25% difference
(For the first cycle of a DC and except TPP sector)
>25%
Sr
No
DC
1
2
3
4
5
6
7
8
9
10
11
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
1
2
3
4
5
6
7
8
9
10
11
Productio
n
SEC BY
PAT C1
[C]
tonne
120000
150000
130000
120000
160000
111000
120000
200000
160000
85000
150000
toe/t
0.485
0.459
0.451
0.453
0.496
0.48
0.522
0.464
0.47
0.491
0.624
Achieved
Target SEC
SEC AY Differenc Achieved Target SEC
O/A PAT C2
PAT C1
e
SEC
O/A PAT C1
(A)
[B]
toe/t
%
%
%
toe/t
0.4
17.53
7.5
0.4
0.42
8.50
7.5
0.42
0.425
5.76
7.5
0.393
0.43
5.08
7.5
0.398
0.43
13.31
7.5
0.398
0.45
6.25
7.5
0.416
0.45
13.79
7.5
0.416
0.47
-1.29
7.5
0.435
0.49
35.63
-4.26
7.5
0.453
0.52
-5.91
7.5
0.481
0.6
3.85
7.5
0.555
Target
PAT C2
%
0%
0%
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
Target Setting
Less than 10 DC in a sub-sector
Sr
DC
No
Achiev
%
Achiev Target
Target Target
Produc SEC BY ed Target Differe ed SEC SEC O/A
SEC O/A
PAT
tion PAT C1 SEC AY PAT C1 nce
(%)
PAT C1
PAT C2
C2
PAT C1 (C]
(B)
(A)
toe/t
toe/t
0.429
0.43
4.5
0.43
0.44
0.45
6 Plant 6 111000
0.45
0.45
0.47
0.48
Remarks
toe/t
toe/t
4.88
7.5
0.401
6.622
7.5
0.435
-1.131
13.31
7.5
0.398
7.5
4.14
5.00
7.5
0.44
7.5
7.22
7.5
0.45
7.5
Irresp
ective
of %
dif
6.25
7.5
0.416
7.5
13.79
7.5
0.416
7.5
-1.29
7.5
0.435
7.5
-4.26
7.5
0.453
7.5
13.13
0.479
0.450
Target Setting
Zero Energy Saving Target for first 10% DCs for less than
25% difference
(For the first cycle of a DC and except TPP sector)
All Sub-sector of sector
Target Setting
Zero Energy Saving Target for first 10% DCs for less than
25% difference
(For the first cycle of a DC and except TPP sector)
Sr
DC
No
3 Plant 3
4
5
2
1
6
7
8
9
10
11
12
13
14
15
16
17
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
Plant
4
5
2
1
6
7
8
9
10
11
12
13
14
15
16
17
Achiev
%
Achiev Target
Target
Produc SEC BY ed SEC
Differe
Target
Target
ed SEC SEC O/A SEC O/A
Remarks
tion PAT C1 AY PAT
nce
PAT C2
PAT C1
(%)
PAT C1
PAT C2
C1
toe/t toe/t
%
%
%
toe/t
toe/t
%
4.88
130000 0.451 0.429
4
7.5
0.401
6.622
Target will
13.13
120000 0.495
0.43
4.5
7.5
0.435
-1.131 become 0%
13.31
160000 0.496
0.43
6
7.5
0.398
7.5
4.14
150000 0.459
0.44
4
7.5
0.44
7.5
7.22
120000 0.485
0.45
4
7.5
0.45
7.5
6.25
111000 0.48
0.45
4
7.5
0.416
7.5
<25
13.79
120000 0.522
0.45
8
7.5
0.416
7.5
%
-1.29
200000 0.464
0.47
4
7.5
0.435
7.5
23.85
-4.26
160000 0.47
0.49
4
7.5
0.453
7.5
8.35
85000 0.491
0.45
4.5
7.5
0.416
7.5
11.86
150000 0.624
0.55
4.5
7.5
0.509
7.5
7.14
85000
0.7
0.65
5
7.5
0.601
7.5
-6.09
80000
0.69
0.732
5
7.5
0.677
7.5
15.87
111000 0.832
0.7
5
7.5
0.648
7.5
18.85
80000 0.801
0.65
4
7.5
0.601
7.5
3.99
110000 0.802
0.77
3
7.5
0.712
7.5
16.76
120000 0.901
0.75
7
7.5
0.694
7.5
209200 121116 111148
0
7
0
0.579 0.531
Thank You