Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
STIM-03.014
Revision/Date: 2 2009-08-12
No.:
Issued by:
E F PR SU EN PD 14
Title
Piping Design Requirements for Condensate Lines of the MAN and MAC
System
Proj Code
UA
Content Code
UNID-Nr
Document Status:
Siemens AG
Energy Sector
Preliminary
Final
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
2 of 9
Released by:
Hartmut Egener
E F PR SU EN PD 3
Signed Egener
2009-11-03
Reviewed by:
Franz Bruder
E F PR PI 15
Signed Bruder
2009-11-03
Reviewed by:
Bernd Leu
E F PR SU EN PD 14
Signed Leu
2009-10-30
Kakhi Naskidashvili
E F PR SU EN PD 14
Signed Naskidashvili
2009-10-30
Name
Org. Unit
Signature
Date
Prepared by:
REVISION SHEET
REVISION
REISSUE
SECTION
DESCRIPTION OF CHANGE
DATE
1
2007-08-15
2009-08-12
4
5
6
Siemens AG
Energy Sector
Title changed
Section 6 added
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
3 of 9
TABLE OF CONTENTS
1.
SCOPE .....................................................................................................................................................................4
1.1
2.
GENERAL ...............................................................................................................................................................4
2.1
3.
4.
5.
PARTICULAR PIPING AND SUPPORT REQUIREMENTS FOR THE MAN SYSTEM .............................5
6.2.
Siemens AG
Energy Sector
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
4 of 9
1. SCOPE
This document covers the piping design requirements for condensate lines in the MAC, MAG
and MAN system.
2. GENERAL
2.1 National Standards
Specific standards issued by the following organizations shall apply where referenced
in this specification. It shall be the designers responsibility to obtain copies of all
referenced documents and drawings. Unless specific exception is taken and approved
by Siemens Energy, the referenced documents shall be considered binding.
ANSI
ASME
ASTM
or where required
DIN EN Deutsches Institut fr Normung / European Norm
ISO
International Standard Organisation
EG Maschinenrichtlinie/ EG Maschine Directive 98/37/EG
Druckgerterichtlinie / Pressure Equipment Directive (PED) 97/23/EG
Siemens AG
Energy Sector
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
5 of 9
Piping and pipe supports shall be designed and implemented with due allowance
for thermal expansion and movement of terminals.
The use of bends and elbows to change piping direction shall be minimized.
The use of free swinging piping hangers should be avoided or, at the very least,
kept to an absolute minimum. If possible the pipes should be supported.
The piping run must be safeguarded against possible vibration excitation from
switching and flow processes or pump pressure fluctuations with the aid of guides
or dampers.
In the event of seismic design requirements, the support concept must then allow
for the additional forces, moments and vibration.
A fixed point must be provided ahead of and behind water injection valve
MAN5XAA151, see Sketch 1. In cases where pipe movement does not allow this
type of fixed point, a spring and damper combination shall be used for the entire
support configuration, see Sketch 2.
Siemens AG
Energy Sector
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
6 of 9
Siemens AG
Energy Sector
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
7 of 9
The distance between the branch to overflow line / orifice MAN53BP031 and orifice
MAN52BP001 must be less than 1 m.
To accommodate water hammer caused by flashing, the pipe length between valve
MAN63AA051 and orifice MAN62BP001 must be kept below 5 m.
Piping of the water injection must be routed such as to ensure automatic venting.
Sketch 3: Connection to overflow line
Siemens AG
Energy Sector
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
8 of 9
Connections to the orifice for the bypass steam inlet must be free from stress and
vibration, see Sketch 4.
Appropriate pipe supports (springs, dampers) shall be implemented at this location.
Rigid supports upstream of the nozzle shall be designed such as to rule out
overloading of the nozzle as a result of vertical displacement of the bypass valves
during assembly or operation of the bypass system.
Siemens AG
Energy Sector
Document No.:
Revision/Date:
Page:
STIM-03.014
2
2009-08-12
9 of 9
6.1.
The mesh size of the strainer MAC01AT001 shall not exceed 1,5 mm.
The condensate supply line for the LP exhaust hood spray must be arranged below the outer
casing upper part of the LP turbine. In the supply line to the spray nozzles in the casing upper part
a splitting flange must be arranged. The splitting flange must be arranged 80 mm below the
casing joint, see sketch.
6.2.
The pipeline to the spray nozzle of LP exhaust hood spray has to be flushed. It is recommended to
flush the pipeline, before the last Seam of pipeline to the nozzle is welded on.