2x600 MW SUB-CRITICAL COAL BASED TPP. DERANG, ANGUL DIST, ORISSA.

TSPL REPLY TO JITPL COMMENTS ON (dt: 30-12-10)

TITLE: P&ID Diagram HFO system


TSPL DOC. NO.: TSPL-P174 -PID-201Rev 00
Sl
No
1.1
1.2
1.3

JITPL/TCE COMMENTS

HFO unloading pump head calculation shall be furnished.

For Unloading pump head calculations please refer Doc. No. TSPLP174-CAL-106 and same has been submitted to you.

Vent and drain line shall be provided on the U/L header at


both the ends.

We have given one vent and one drain to the 150NB unloading
header and One more vent and drain is not required.

Pipe line sizing calculations shall be furnished.

For Pipe line sizing calculations please refer Doc. No. TSPL-P174CAL-114 and same has been submitted to you.

HFO unloading pump GA drawing shall be furnished..

For HFO unloading pump GA drawing please refer Doc. No. TSPLP174-DTS-701 and same will be submitted after approval of this
P&ID.

Instrument air requirement shall be provided.

Approximately 10NMCH

1.4
1.5

1.6

1.7
1.8

THERMOSYSTEMS REPLY DATE: 17.01.11.

Terminal point for return line from boiler with respect to the
HFO tank dyke wall shall be indicated.
GA drawing for oil water collection and separation shall be
provided.
Insulation thickness calculation shall be furnished.

1.9

I&C comments are attached separately along with this


transmittal letter (Annexure-1).

1.10

Consultant name in the title block TCE shall be corrected to


TATA with TATA symbol.

As per TCE technical specification section C8, Sheet 1 of 1 Return


line from boiler up to tank nozzle is in customer scope and same is
indicated in the drawing please accept the same.
For GA drawing for oil water collection and separator please refer
Doc. No. TSPL-P174-GAD-222 and same will be submitted later.
For Insulation thickness calculations please refer Doc. No. TSPLP174-CAL-115 and same has been submitted to you.
Noted.
Consultant name in the title block TCE is corrected to TATA with
TATA symbol in the revised drawing.

2x600 MW SUB-CRITICAL COAL BASED TPP. DERANG, ANGUL DIST, ORISSA.


TSPL REPLY TO JITPL COMMENTS ON (dt: 30-12-10)

TITLE: P&ID Diagram HFO system


TSPL DOC. NO.: TSPL-P174 -PID-201Rev 00

C&I Comments and Resolution Sheet

1.0

2.0

3.0

4.0
5.0
6.0

Control valve on the auxiliary steam shall control the HFO tank
temperature i.e. the floor coil heater. TSPL shall provide the Control
Valve on each of the inlet auxiliary steam header lines to the HFO
tanks with necessary interlocks for HFO Tank #1 and Tank#2
temperature control.
TE 00EGB02CT001 of HFO Tank#1 and TE 00EGB05CT001 of HFO
Tank#2 shall be interlocked with the control valve of the respective
Auxiliary steam headers to Tank #1&#2
Level signals from level transmitter 00EGB02CL001, Low Level Switch
00EGB04CL001, High Level Switch 00EGB03CL001 shall be
hardwired to DCS for monitoring.
All pressure indicators and differential pressure indicators for HFO
service will be provided with diaphragm seals.
The LPBS Start/stop for all the pumps shall be explosion proof as per
hazardous area requirement.
Bidder shall supply PLC/Relay based local Control Panels along with
all necessary hardware and wiring to meet the minimum operation and
Control requirements.

There is a separate P&ID for Steam & Condensate System vide Doc. No.
TSPL-P174-PID-204 please refers the same.

Noted.
We would like to clarify that from FOHS PLC Panel to DCS will be
communicated through communication cable as per the Technical
Specification (Control Philosophy note point no. 1).
Noted and Confirm.
Noted and Confirm.
Please note TSPL are providing one common PLC system for HFO, LDO
and HSD system as per the system requirement.

2x600 MW SUB-CRITICAL COAL BASED TPP. DERANG, ANGUL DIST, ORISSA.


TSPL REPLY TO JITPL COMMENTS ON (dt: 30-12-10)

TITLE: P&ID Diagram HFO system


TSPL DOC. NO.: TSPL-P174 -PID-201Rev 00

Additional Comments on PIDs


1.0
a
b
c
d
e
f
2.0
3.0
4.0

5.0

Tag Nos listed below are repeating in HFO,LDO and Diesel PIDs

--------------------------

Low Level Switch LDO/Diesel Storage Tanks 00EGB04CL001,


High Level Switch LDO/Diesel Storage Tanks 00EGB03CL001
Diff. Press. across strainer of LDO/Diesel/HFO unloading pumps
00EGC04/05CP001
Diff. Press. across strainer of LDO/Diesel/HFO unloading pumps
00EGC01/02CP001
Diff. Press. across strainer of Diesel unloading pumps
00EGC04CP001
Flow Meter of HFO/Diesel storage tank inlet line 00EGC01CF001
TSPL shall furnish the control philosophy, Erection Sketches and Data
sheets for all the instruments.
Pressure instruments shall be provided with suitable manifolds and
isolation valves.
Interlocks shall be indicated with appropriate description.
For drives, apart from the local push button operation for start/stop,
process interlocks shall be realized in the PLC for remote operation.
Operation of the drive from PLC shall only be possible upon fulfillment
of all process & protection interlocks.

Noted and Incorporated.

Please note that we have already submitted control philosophy and Data
sheets for all the instruments to you as a separate document for approval.
Noted and Confirm.
Confirm.

Noted and Confirm.

2x600 MW SUB-CRITICAL COAL BASED TPP. DERANG, ANGUL DIST, ORISSA.


TSPL REPLY TO JITPL COMMENTS ON (dt: 30-12-10)

TITLE: P&ID Diagram HFO system


TSPL DOC. NO.: TSPL-P174 -PID-201Rev 00

6.0
7.0

TSPL shall check the tag No. repetition in the PIDs for all the
instruments and valves and correct
The tag Nos of valves, pumps and strainers are overlapping. The
same shall be checked and corrected.

Noted and Incorporated.


Noted and Incorporated.