4.20
7.50
4.00
4.00
1.60
1.70
1.50
3.00
Ordinary soil
i)
up to 3.0m depth
Face Wall
For pipe
apron u/s
apron d/s
2
1
1
1
2
2
2
1
1
4.20
1.60
4.20
0.10
4.20
(0.36+0.10)/2
(5.30+5.80)/2
1.70
(5.80+6.10)/2
4.00
2
1
2
2
4.00
7.50
4.00
7.50
1.60
1.70
(0.45+1.80)/2
1.70
1.00
3.14/4
x0.60x0.60
Net Quantity
S.No.
Description of Item
4/ item Providing and laying Reinforced
9.4
Cement Concrete pipe NP 3 /
p-39 prestressed concrete pipe. (Laying
Reinforced cement concrete pipe
NP3 /prestressed concrete pipe for
culverts including fixing collar with
cement mortar 1:2 but excluding
bedding below pipes, excavation,
protection works, backfilling, concrete
and masonry works in head walls and
parapets .
B
600 mm dia
5 /item
Providing and laying Filter material
9.12
underneath pitching in slopes
p-40
complete as per drawing and
Technical specification.
u/s apron below boulder pitching
d/s apron below boulder pitching
Nos.
7.50
1
1
4.00
4.00
1.50
3.00
1
1
4.00
4.00
1.50
3.00
u/s apron
d/s apron
Sub Engineer
h road = 2nos.
H
QTY
1.90
2.54
0.55
0.55
Total
25.54
32.39
3.30
6.60
67.82
0.30
1.25
0.95
0.80
0.60
Total
4.03
1.05
1.84
7.55
14.28
28.75
0.20
0.20
3.49
0.30
Total
2.56
3.26
31.41
7.65
44.88
0.60
0.34
Net Quantity
44.54
Unit
Cum
Rate
Amount
146.00
9902.00
Cum
1234.00 35472.00
Cum
4613.00 205478.00
QTY
Unit
Rate
Amount
7.50
2617.00 19628.00
0.25
0.25
Total
1.50
3.00
4.50
Cum
2079.00
0.30
0.30
Total
1.80
3.60
5.40
Cum
9356.00
2413.00 13030.00
Total
292866.00
for 2 nos. culvert=2x292866.00
585732.00
Gunderdehi
Executive Engineer
P.W.D. Division Balod