Sei sulla pagina 1di 4

Supplymentary Estimate for Construction of single Row 600 mm Dia

on Belodi College approach road = 2nos.


Bridge S.O.R.Enforced From 1 January 2015
S.No.
Description of Item
Nos.
1/ item
2.1
p-13

4.20
7.50
4.00
4.00

1.60
1.70
1.50
3.00

Excavation for Structures Earth


work in excavation of foundation of
structures as per drawing and
technical specification, including
setting out, construction of shoring
and bracing, removal of stumps and
other deleterious matter,dressing of
sides and bottom and backfilling
with approved material including
dewatering etc. complete.

Ordinary soil

i)

up to 3.0m depth
Face Wall
For pipe
apron u/s
apron d/s

2
1
1
1

2/ item Sand Filling in Foundation Trenches as


2.3
per Drawing &Technical Specifications
p-13
filling Below Base
Outer face of face wall
Inner face of face wall
Around the pipe
Cushion above pipe

2
2
2
1
1

4.20
1.60
4.20
0.10
4.20
(0.36+0.10)/2
(5.30+5.80)/2
1.70
(5.80+6.10)/2
4.00

3/ item Plain/Reinforced cement concrete in


2.6 p- open foundation complete as per
13 drawing and technical specifications.
A
(i)

Using concrete mixer


PCC Grade M15
base of face wall
Concrete for below pipe
face wall bottom to top
concrete outer side of pipe

Deductions for pipe

2
1
2
2

4.00
7.50
4.00
7.50

1.60
1.70
(0.45+1.80)/2
1.70

1.00

3.14/4
x0.60x0.60
Net Quantity

Road S.O.R.Enforced From 1 January 2015

S.No.
Description of Item
4/ item Providing and laying Reinforced
9.4
Cement Concrete pipe NP 3 /
p-39 prestressed concrete pipe. (Laying
Reinforced cement concrete pipe
NP3 /prestressed concrete pipe for
culverts including fixing collar with
cement mortar 1:2 but excluding
bedding below pipes, excavation,
protection works, backfilling, concrete
and masonry works in head walls and
parapets .
B

600 mm dia

5 /item
Providing and laying Filter material
9.12
underneath pitching in slopes
p-40
complete as per drawing and
Technical specification.
u/s apron below boulder pitching
d/s apron below boulder pitching

Nos.

7.50

1
1

4.00
4.00

1.50
3.00

1
1

4.00
4.00

1.50
3.00

6/tem Providing and laying boulders apron


9.10
on river bed for protection against
p-40 scour with stone boulders weighing
not less than 40 kg each complete as
per drawing and Technical
specification.as per clause 2503

u/s apron
d/s apron

for 2 nos. culve

Sub Engineer

Sub Divisional officer


P.W.D. Sub Division Gunderdehi

ow 600 mm Dia Np3 Hume Pipe Culvert

h road = 2nos.
H

QTY

1.90
2.54
0.55
0.55
Total

25.54
32.39
3.30
6.60
67.82

0.30
1.25
0.95
0.80
0.60
Total

4.03
1.05
1.84
7.55
14.28
28.75

0.20
0.20
3.49
0.30
Total

2.56
3.26
31.41
7.65
44.88

0.60

0.34

Net Quantity

44.54

Unit

Cum

Rate

Amount

146.00

9902.00

Cum

1234.00 35472.00

Cum

4613.00 205478.00

QTY

Unit

Rate

Amount

7.50

2617.00 19628.00

0.25
0.25
Total

1.50
3.00
4.50

Cum

2079.00

0.30
0.30
Total

1.80
3.60
5.40

Cum

9356.00

2413.00 13030.00
Total
292866.00
for 2 nos. culvert=2x292866.00
585732.00

Gunderdehi

Executive Engineer
P.W.D. Division Balod