PETROBRAS

Opportunitiesfor
theOffshoreIndustry
in Brazil
inBrazil

June18,2013

DISCLAIMER
FORWARD-LOOKING STATEMENTS
The presentation may contain forward-looking
statements about future events within the meaning
of Section 27A of the Securities Act of 1933, as
amended, and Section 21E of the Securities
Exchange Act of 1934, as amended, that are not
based on historical facts and are not assurances of
future results.
Such forward-looking statements
merely
l reflect
fl t the
th Companys
C
currentt views
i
and
d
estimates of future economic circumstances,
industry conditions, company performance and
financial results. Such terms as "anticipate",
"believe", "expect", "forecast", "intend", "plan",
"project", "seek", "should", along with similar or
analogous expressions, are used to identify such
forward-looking statements. Readers are cautioned
that these statements are only projections and may
differ materially from actual future results or
events. Readers are referred to the documents filed
by the Company with the SEC, specifically the
Companys most recent Annual Report on Form 20F, which identify important risk factors that could
cause actual results to differ from those contained
in the forward-looking statements, including,
among other things, risks relating to general
g crude
economic and business conditions,, including
oil and other commodity prices, refining margins
and prevailing exchange rates, uncertainties
inherent in making estimates of our oil and gas
reserves including recently discovered oil and gas
reserves, international and Brazilian political,
economic and social developments, receipt of

We undertake no obligation to publicly update


or revise any forward-looking statements,
whether as a result of new information or
future events or for any other reason. Figures
for 2013 on are estimates or targets.
All forward-looking statements are expressly
qualified in their entirety by this cautionary
statement, and you should not place reliance
on any forward-looking statement contained
in this presentation.
NON-SEC
COMPLIANT
RESERVES:

OIL

AND

GAS

CAUTIONARY STATEMENT FOR US INVESTORS


We present certain data in this presentation,
such as oil and gas resources, that we are not
permitted to present in documents filed with
the United States Securities and Exchange
Commission (SEC) under new Subpart 1200 to
Regulation S-K because such terms do not
qualify as proved,
proved
probable or possible
reserves under Rule 4-10(a) of Regulation SX.

InvestmentsintheCountryCatalyzetheShipbuildingand
OffshoreIndustry:
US$107.6billion

Exploration and Production

Refining, Transportation and Commercialization

US$ 131.5 billion

US$ 71.6 billion

21.1

2.9
(4%)

3.5 1.0
(5%) (1%)

(16%)

5.6

25.4

(8%)

(19%)

31.2

83.6
(64%)

16.3
89.9

(12%)

(68%)

(44%)

15 2
15.2

US$
107.6 bi

(21%)

12.1
(17%)

Production Development
Exploration
Infrastructure and Support

Expansion of Refining Park


Operational improvement
Compliance with Internal Market
Allocation of National Oil

Expansion of Fleet
Petrochemicals
Biofuels

Constructionof132Units:DrillingRigs,Stationary
ProductionUnits(SPU)andTankers
Priority: OIL PRODUCTION, Brazil: 2.022 4.200 mbpd

2
SPU

Oil aand NGL Produ


uction Curve (m
mbpd)

38 SPU by 2020: 65% < Local Content < 80%


45 Rigs by 2020: 15 without local content
30 with 55% < Local Content < 70%
49 Tankers by 2020: 65% < Local Content < 74%

3
SPU

7
SPU

1/1
SPU
10/10
4/4
2/2
Rigs

1 Tanker

2,022
(1 unit
delivered)
2011

3/3
Tankers

3/7
SPU

3
SPU

1
SPU

7
SPU
7
Rigs

1/1
Rig

(20 units
delivered)

(4 units
delivered
and 7 to be
delivered)

2012

2013

(11)

7
Rigs
6
Tankers

5
Rigs

7
Rigs

3
Tankers

2
Rigs

8
SPU

5
Tankers

4.200

2
Tankers
5
Tankers

8
Tankers

8
Tankers

8
Tankers

2.500

(11)

(9)

(23)

(20)

(16)

(17)

(10)

2014

2015

2016

2017

2018

2019

2020

MajorShipyardsandGantriesw/TradeRelationswith
Petrobras

MainShipyardsinBrazil
Flexibilityinconcessionagreements
Atlntico Sul (PE)

Partners:CamargoCorraandQueirozGalvo
MarMediterrneo
(since2005)
TechnologyPartner:Ishikawajima

UnitUnderConstruction:
P62
Contracts:
6drillingrigs(Sete Brasil)

Brasfels (RJ)
Onwnership /Technology:KeppelFELS Singapore(inBrazilsince2000)
RecentUnitsbuilt:P57,P56andFPSOCidade deSoPaulo
UnitsUnderConstruction:
FPSOCidade deParaty
P61
Contracts:
6drillingrigs(Sete Brasil)
Modulesintegrationofthe
FPSOs forthePresalt

Quip
Partners:QueirozGalvo,UTCEngenharia
and Iesa (since 2005)
Recent unit built:P53
UnitsUnderConstruction:
Units Under Construction:
P55(modulesintegration)
P62
DeckmatingconclusionperformedbyQUIPinRio
P63
GrandeShipyard.Theoperationwastheheaviest
P58
structureeverliftedintheworld(17thousandtons)

RioGrandeShipyard
Partners:EcovixEngevix
(created in2010)
UnitsUnderConstruction:
8FPSOHulls(forthePresalt)
P55(Topside)
Contractsfor3drillingrigs(Sete
Brasil)

MainShipyardsinBrazil
NewshipyardsthatwillincreasetheBraziliancapacity
17 new shipyards currently under construction, getting license or
MarMediterrneofinancing approved by FMM (some capable of building platforms, rigs
and tankers)
EnseadadoParaguau(BA)
Partners:Odebrecht,OASandUTC(70%)
Technology:Kawasaki Japan(30%)
Contracts:
P59
P 59
P60
6 drillingrigs

Jurong Aracruz(ES)
( S)
Ownership:SembCorp Marine(SCM)from Singapore
ConstructionworksstartedinDec/11.
Experience:Sembcorp
p
p MarinealreadyoperatesinBrazil
y p
inexistingshipyardsfornearly14years,havingbuiltP
50,P54,P43,P40,P38
Contracts with Petrobras:
7 drillingrigs
ModulesintegrationfortheFPSOsforthePresalt
Modules integration for the FPSOs for the Presalt

EstaleiroInhauma (RJ)
PetrobrasleasedInhama shipyardto
Companhia Brasileira deDiques CDBfor
20years.
Contracts forthe Transfer of Rights (with
Odebrecht,OASand UTC):
P74:hull
P75:hull
P76:hull
P77:hull

P74

Source:SINAVAL

Rio Grande Shipyard ERG1 - RS

1
3

Aerial View of the Estaleiro Rio Grande ERG1 - RS (09/03/12).


(1) Ecovix's Sheets Yard; (2) Sub-blocks Yard of Ecovix's replicating hooves; (3) QUIP's modules gantry for topside and integration of the P-55; (4 ) IESA's modules gantry; (5) Pre-construction
area, with detail to the yellow blocks of Konecranes Goliath type portico (largest crane in the world: 210m span and capacity of 2,000 tons) delivered in Aug/12; (6) Integration work of the P-55;
(7) Construction work of Estaleiro ERG 2, where it will be built 3 Setebrasil's Drillships (NS Cassino, NS Curumim and NS Salinas)

BrasFels Shipyard - RJ

2
3

Overview of Estaleiro BrasFels in Angra dos Reis - RJ (31/08/12).


(1)
P-61 (CL:65%): HULL'S Construction of TOPSIDE's TLWP and integration (deckbox and built modules in Singapore).
(2)
So Paulo City FPSO (CL: 65%): HULL's Conversion in China and integration of the 16 mod., Built in Brasfels (5 mod), Enaval (1 mod), Thailand (8 mod) and China (2 mod).
(3)
Paraty City FPSO (CL: 65%): HULL's Conversion in Singapore and integration of 15 modules built in the Brasfels (5), Nuclep (4), Enaval (2), and Singapore (4).

Mau Shipyard - RJ

Overview of Estaleiro Mau, in Niteri - RJ (08/31/12).


(1)
Romulo Almeida Products Ship: Third Lot's Ship of 4 PROMEF 1's products ships (1st Phase), with delivery scheduled for Dec/12;
(2)
Jos Alencar Products Ship: Fourth Batch's ship of 4 PROMEF 1s products ships (1st Phase), with delivery scheduled for Mar/13;
(3)
1st Panamax Vessel: Construction, in the Estaleiro Mau dry dock, 1st batch's Panamax Ship of 4 PROMEF 1 ships (1st Phase), with delivery scheduled for Jan/14.

Atlntico Sul Shipyard - PE

4
2
3

Estaleiro Atntico Sul (Ipojuca-PE): Construction of the Zumbi dos Palmares ship in dry dock and integration of P-62 on the shipyard dock (08/29/12).
(1)
P-62: Integration of the FPSO to the 15 modules, including 3 built in EAS, 7 in the UTC gantry and 5 in the Nuclep gantry
(2)
Zumbi dos Palmares SHIP of Suezmax type (2nd Lot's Ship of PROMEF 1) in dry dock; (3)Panel manufacturing workshops and pre-assembly of block,
(4)
Future area for construction of 7 Setebrasil's rigs ; (5) Future area of Estaleiro Promar, responsible for building the batch of 8 Promef Phase 2's gas tankers.

Leased FPSOs for Pre-salt

Agenda

Lula Pilot
On stream since Oct
Oct/2010
/2010
FPSO Cidade de Angra dos Reis

Baleia Azul
On stream since Set/2012
FPSO Cidade de Anchieta

Sapinho Pilot
On stream since Jan/2013
FPSO Cid
Cidade
d d
de So
S Paulo
P l

Lula NE
1st Oil in May/2013
FPSO Cidade de Paraty

PetrobrasVessels
Currentandprojectedfleet
FutureDemand(20132020)

2020StrategicPlanning
CriticalResources
TankerVessels(DWTx1000t)

FutureSituation
March/13 AccumulatedValues(1)
Situation
By2017
By2020

16,000

19,000

24,500

LargeSupplyBoats*

216

313

358

ProductionUnits(SSandFPSO)

50

72

84

DrillingRigs(SWD>2.000m)

41

44

54

(1) Thefuturesituationof2020doesnotreflectthesumofthecurrentsituationwithfuture
demand,astherearevesselswhosecontractsexpireby2020.Thisdemandmayberevised
asnecessary.
(2) FutureDemandincludeshireddemand,demandsinhiringphaseandyettobehired
demand.

+ 88 Tanker Vessels
+88TankerVessels
+198LargeSupply
Boats
+36Production
Units
+28DrillingRigs

Significantequipmentdemandmapping:
Historicallyimportedequipmentwithpotentialtoattractforeignsuppliers
Historically imported equipment with potential to attract foreign suppliers
Equipmentproducednationallybutwithpotentialbottlenecksinproductioncapacity
Source:Transpetro;PNG201317;Petrobras(E&PSERV/USCONTandABLO/TM)

*AHTS,ORSV,PSV

DrillingRigs
Fleetincreaseby2020
PetrobrasDrillingRigsStartupTimeline
+14

Drillingrigsconsideredforthe
g g
f
equipmentdemandanalysis

Equipmentdemandnot
yetaddressedforthe28
drillingrigstobedelivery
by 2020
by2020

+8
Exampleofequipmentwith
potentialfornationaldevelopment

+7
+4
+4

+5

+1

ConstructionSite
Source:Petrobras;Sinaval

Abroad

Brazil

28DerrickStructure
28Travelingequipment
28ChokeandKillManifold
28setsofRisers
28BOP(parcial)
28 t El t i l System
28setsEletrical
S t
168MainDieselGenerators(parcial)
28Emergencygenerators
84DeckCranes
168Azimut Thrusters
2,716Pumps
840HVACSystem
28Accomodation

*Beingnegotiated.Estimatewillbeconfirmedatthecontractsigning

TankerVessels
Fleetincreaseby2020

PetrobrasFleetGrowthProgramwith
BrazilianVessels
PROMEFIandII

EBNIandII

49Vesselsby2020

39Vesselsby2017

12Products
8LPG
3Bunkers

14Suezmax
8Aframax
4Panamax

26Products
6Bunker
7LPG

4 deliveredVesselsand21Vesselsinadvancedstageof
construction

2 Vessels in advanced stage of construction


2Vesselsinadvancedstageofconstruction

24Vesselsinhiringphaseorinitial
constructionphase

37Vesselsinhiringphaseorinitial
constructionphase

Equipmentdemandnotyetaddressedfor61Vessels(by2020)
Exampleofequipmentwithpotentialfornationaldevelopment

61 Vacuum Sewage Systems


61VacuumSewageSystems

72LifeBoats+Davit

53InertGasGenerationUnit

1.830AccomodationCabines

Source:Transpetro;Petrobras(ABLO/TM)

LargeSupplyVessels
Fleetincreaseby2020

CurrentPetrobrasFleet
AHTS

MaintenenceTOs+DMAs+NewProductionUnits
Instalation+FPSO`sandNTsOperation

OSRV

FutureDemand

Quantity

55

+198LargeSupplyVessels
by2020

36

Oil R
OilRecovery

(almostthesamequantityasthecurrent

PSV

fleet 216)

125

GeneralCargo+Oil+Bulk+Cement

TS
Tugs+OilRecovery

LH
SOSStandby+HandlingSpy(messenger)

SV
SOS Standby
SOSStandby

UT/P
EmergencyCargo/Passenger

Source:E&PSERV/USCONT

21
30
4
38

Exampleofequipmentwithpotentialfornational
development

198OffshoreandProvisionCranes
198VacuumSewageSystems
396RescueBoats
55 700 M
55,700ManualOperatedValves
lO
t dV l
44,550tonofPiping
4,800tonofFitting

Information:
Investor Relations
+55 21 3224-1510
petroinvest@petrobras.com.br
investors@petrobras com
investors@petrobras.com
www.petrobras.com.br/ir