Sei sulla pagina 1di 41

B-84567-SB-PP0-DSR-ST-60-0009 Rev 1

Datasheet
Fuel Gas Filter Coalescer
ConocoPhillips (Grissik) Ltd.

Page 2 of 2

Revision Sheet
ConocoPhillips (Grissik) Ltd.

REVISION

DATE

DESCRIPTION OF CHANGE

0A

15-Apr-15

First Issuance

0B

29-May-15

Incorporate clients comment

0C

26-Jun-15

Incorporate clients comment

7-Jul-15

Issued for Use


Revise gas flowrate due to relocation of GTG fuel gas system line

Additional Approvers (If Applicable)


Name

Designation

Signature

Date

PROCESS DATASHEET FOR GAS FILTER COALESCER


1
2
3
4
5
6
7
8

ITEM
SERVICE
TAG NUMBER
LOCATION
NUMBER
TYPE
P&ID REF. NO
DESIGN

FILTER COALESCER
FUEL GAS FILTER COALESCER
60NAD-303A/B
SUBAN GAS PLANT
2 x 100%
FILTER COALESCER TYPE
B-84567-SB-PP0-PID-ST-60-0012 SHEET 1
UNIT

10
Design Pressure
11
Design Temperature
12
13 OPERATING CASE

Psig
o
F
UNIT
Case-1
Max Case
(Note 1)

Case-2
Backup Case
(Note 1)

Case-3
Start-up Case
(Note 1)

Psig
o
F

357.2
171.7

357
170.8

356.8
170.7

lb/hr
MMscfd
lb/ft3

44907
21.26
1.098
0.0137
19.24

42306
21.14
1.039
0.0135
18.23

15269
7.63
1.034
0.0135
18.23

0.443
0.051
37.37
0.2539

14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Operating Pressure (P)


Operating Temperature (T)
VAPOUR
Mass Flowrate
Molar Flowrate
Density
Viscosity
Molecular Weight
LIQUID HYDROCARBON
Mass Flowrate
Volume Flowrate
Density
Viscosity
LIQUID AQEUOUS
Mass Flowrate
Volume Flowrate
Density
Viscosity
VESSEL

Note 1

cP
Note 1

34
Horizontal / Vertical
35
Shell Diameter
36
Shell Length (T/T)
37
Material of Construction
38
Corrosion Allowance
39
Insulation
40 INTERNALS (Note 11)
41
42
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
1
0C
0B
0A
Rev.

490
-20 / 225

lb/hr
bpd
lb/ft3
cP
lb/hr
bpd
lb/ft3
cP
in
in
in
-

Vertical
VTA
VTA
SS 316L (VTA) (Note 3)
NIL
Hot Insulation

Solids Removal Efficiency


Liquids Removal Efficiency
Clean Pressure Drop (Allow / Calc)
Dirty Pressure Drop (Changeout /
Collapse)
Inlet Device
Vortex Breaker Required
Other Internals
NOTES
1.
2.
3.

10 microns at 99.9%
3 microns at 99.9%
3 / VTA
5 / VTA
VTA
VTA
VTA

Flowrate already includes 10% design margin


VTA = Vendor To Advise.
Material of construction is 316L SS. To be validated during EPCI stage.

07-Jul-15
26-Jun-15
29-May-15
15-Apr-15
Date

Issued for Use


Re-Issued for Approval
Issued for Approval
First Issuance
Description

ADI
ADI
ADI
ADI
Prepared

AND/YHT
AND/YHT
AND/YHT
AND/YHT
Check

MCH
MCH
MCH
MCH
Approved

SUBAN COMPRESSION PROJECT


Process Datasheet for Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Doc. No : B-84567-SB-PP0-DSR-ST-60-0009

Sheet 1 of 3
Rev 1

PROCESS DATASHEET FOR GAS FILTER COALESCER


59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

Mark

Number

Size (in)

N1
N2
N3A
N3B
N4A/B
N5A/B
N6A/B
N7A/B
N8
N9
N10
N11A/B
N12
N13
N14

1
1
1
1
2
2
2
2
1
1
1
2
1
1
1

10 (VTA)
8 (VTA)
2
2
2
2
2
2
2
2
VTA
2
2
2
2

NOZZLE SCHEDULE
Flange Rating Service
300#
300#
300#
300#
300#
300#
300#
300#
300#
300#
300#
300#
300#
300#
300#

FILTER COALESCER

Gas Inlet
Gas Outlet
Liquid outlet - upper section
Liquid outlet - bottom section
LG connection - bottom section
LG / LT connection - upper section for switchover
PDT connection
LTZ connection - at upper section for trip
TI connection
PI connection
Quick opening closure
LT connection - alarm for bottom section
Equalization line for liquid trap - upper section
Equalization line for liquid trap - upper section
Vent connection

SKETCH

77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
1
0C
0B
0A
Rev.

07-Jul-15
26-Jun-15
29-May-15
15-Apr-15
Date

Issued for Use


Re-Issued for Approval
Issued for Approval
First Issuance
Description

ADI
ADI
ADI
ADI
Prepared

AND/YHT
AND/YHT
AND/YHT
AND/YHT
Check

MCH
MCH
MCH
MCH
Approved

SUBAN COMPRESSION PROJECT


Process Datasheet for Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Doc. No : B-84567-SB-PP0-DSR-ST-60-0009

Sheet 2 of 3
Rev 1

PROCESS DATASHEET FOR GAS FILTER COALESCER


FILTER COALESCER
FEED COMPOSITION

120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
1
0C
0B
0A
Rev.

Composition
Nitrogen
CO2
Methane
Ethane
Propane
i-Butane
n-Butane
i-Pentane
n-Pentane
n-Hexane
Mcyclopentan
Benzene
Cyclohexane
n-Heptane
Mcyclohexane
Toluene
n-Octane
m-Xylene
p-Xylene
o-Xylene
n-Nonane
124-MBenzene
n-Decane
n-C11
n-C12
n-C13
n-C14
n-C15
n-C16
n-C17
n-C18
n-C19
n-C20
H2O
H2S
Mercury

07-Jul-15
26-Jun-15
29-May-15
15-Apr-15
Date

Case-1
0.00181
0.05740
0.88127
0.03397
0.00998
0.00297
0.00296
0.00164
0.00105
0.00167
0.00017
0.00061
0.00017
0.00080
0.00022
0.00042
0.00050
0.00009
0.00009
0.00004
0.00020
0.00002
0.00008
0.00003
0.00001
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00180
40 ppm
< 1 g/Nm3

Issued for Use


Re-Issued for Approval
Issued for Approval
First Issuance
Description

Mole Fraction
Case-2
Backup Case
0.00187
0.03482
0.91051
0.03447
0.00970
0.00269
0.00254
0.00119
0.00069
0.00069
0.00007
0.00021
0.00006
0.00018
0.00005
0.00007
0.00006
0.00001
0.00001
0.00000
0.00001
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00008
3 - 4 ppm
< 1 g/Nm3

Case-3
Start-up Case
0.00187
0.03482
0.91051
0.03447
0.00970
0.00269
0.00254
0.00119
0.00069
0.00069
0.00007
0.00021
0.00006
0.00018
0.00005
0.00007
0.00006
0.00001
0.00001
0.00000
0.00001
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00000
0.00008
3 - 4 ppm
< 1 g/Nm3

ADI
ADI
ADI
ADI
Prepared

AND/YHT
AND/YHT
AND/YHT
AND/YHT
Check

MCH
MCH
MCH
MCH
Approved

SUBAN COMPRESSION PROJECT


Process Datasheet for Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Doc. No : B-84567-SB-PP0-DSR-ST-60-0009

Sheet 3 of 3
Rev 1

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment List

Attachment List
1.

Attachment 1 Fuel Gas Demand

2.

Attachment 2 HYSYS Snapshot

3.

Attachment 3 Liquid Produced

4.

Attachment 4 Minimum Design Temperature

5.

Attachment 5 Pressure Drop Check

6.

Attachment 6 GTC and GTG Fuel Gas Demand

7.

Attachment 7 LP Fuel Gas Demand

8.

Attachment 8 Line Sizing

9.

Attachment 9 Required Filtration Performance

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 1
Fuel Gas Demand

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 1 - Fuel Gas Demand

SUMMARY FOR FUEL AND SEAL GAS DEMAND

Total Fuel Gas


Demand (MMscfd)
(Note 1)
8.66
15.49
18.30
17.51

Total + 10 % Design
Margin (MMscfd)
(Note 2)
9.52
17.04
20.13
19.26

Beyond PSC Life

16.63

18.29

Highest Gas Demand (Note 5)

19.33

21.26

selected as case with highest gas


demand

Start-up Case (Note 3)

6.94

7.63

selected as start-up case

Backup Case (Note 4)

19.22

21.14

selected as case with alternative


gas supply

Early Life
Mid-Life-1
Mid Life-2
Late-Life

Remark

Note:
1. Fuel gas demand above already consider switchover scenario with 4.5 compressor train running (standby compressor is
running at 50% load), except for start-up case.
2. Total fuel gas gas demand above already includes 10% design margin and will be used for equipment sizing.
3. Start up case consist of 1 GTC and LP Fuel Gas for flare.
4. During Backup Case, fuel and seal gas supply is supplied from sales gas and to be bypassed from Fuel/Seal Gas Filter Coalescer
(60NAD-301A/B).
5. Highest gas demand is considered based on max. turbine power of 16193 hp and lowest LHV during normal operation.

Sheet 1 of 2

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 1 - Fuel Gas Demand

Sheet 2 of 2

FUEL GAS DEMAND

1. GTC Fuel Gas Demand

Train BHP Required Heat Rate


Incl. Losses 2% (HP) (Btu/hp-hr)
(Note 1)
(Note 1)

LHV
(Btu/scf)

No Train
GTC Fuel Gas
Running
Demand per
Incl.
train (MMscfd)
Switchover
(Note 2)
(Note 3)

GTC Fuel
Gas Total
Demand
(MMscfd)

2. Purge Gas
(MMscfd)
(Note 4)

3. Pilot Gas
(MMscfd)
(Note 5)

4. GTG Fuel
Gas Demand

5. Total Fuel Gas


Demand
(MMscfd)

Early Life

5323.38

7709

933.6

1.16

4.5

5.22

1.13

0.001

2.30

8.66

Mid-Life-1

12279.78

7709

933.1

2.68

4.5

12.05

1.13

0.001

2.30

15.49

Mid Life-2

15144.96

7709

933.1

3.30

4.5

14.86

1.13

0.001

2.30

18.30

Late-Life

14353.44

7709

934.1

3.13

4.5

14.07

1.13

0.001

2.30

17.51

Beyond PSC Life

13517.04

7709

938.5

2.93

4.5

13.19

1.13

0.001

2.30

16.63

Highest Gas Demand


Start-up case
Backup Case

16193.00
16193.00
16193.00

7709
7709
7709

933.1
939.4
939.4

3.53
3.51
3.51

4.5
1.0
4.5

15.89
3.51
15.79

1.13
1.13
1.13

0.001
0.001
0.001

2.30
2.30
2.30

19.33
6.94
19.22

Notes: 1. GTC horse power and heat rate is taken from vendor datasheet in Attachment 5 which still exclude 2% of gearbox losses
2. 10% design margin is applied to GTC Fuel Gas demand as stated by GTC vendor (see attachment 5)
3. Number of train running is included switchover scenario in which the backup compressor will run at 50% load
4. Purge Gas consumption is calculated by FLARENET with backpressure of 2 psig (Attachment 6). This value to be revalidated during EPCI stage.
5. Pilot Gas demand is referred to vendor qoutation by NAO (Attachment 6). This value to be revalidated during EPCI stage.
6. GTG Fuel Gas demand is taken from maximum flowrate to existing GTG as per PFD (attachment 8) which is higher than data provided from GTG
vendor. This value to be revalidated during EPCI stage.

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 2
HYSYS Snapshot

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Case with Highest Gas Demand

Attachment 2 - HYSYS Snapshot

Sheet 1 of 3

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Backup case

Attachment 2 - HYSYS Snapshot

Sheet 2 of 3

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Start-up Case

Attachment 2 - HYSYS Snapshot

Sheet 3 of 3

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 3
Liquid Produced

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer
Attachment 3 - Liquid Produced Calculation
Sheet 1 of 1

ConocoPhillips (Grissik) Ltd.

Determined liquid rate to be handled by Fuel Gas Filter Coalescer (60NAD-303A/B)

Early Life
Mid-Life-1
Mid Life-2
Late-Life
Beyond PSC Life
Startup case
Backup case
0.1 gal/MMscf

Gas Flowrate
(MMscfd)

Liquid flowrate
(bpd) (Note 2)

9.52
17.04
20.13
19.26
18.29
7.63
21.14
21.26

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.051

Remark

Based on this composistion,


there is no liquid found.

Note 1

Note:
1. Since no liquid is produced in all cases, for sizing purpose liquid amount is determined by using
assumption of 0.1 gal/MMscf. The nominal flowrate is taken based on highest fuel gas demand.
2. Liquid flowrate is taken from HYSYS snapshot in Attachment 1.

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 4
Minimum Design Temperature

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 4 - Minimum Design Temperature

Minimum Design Temperature Summary

Temperature (oF)

Remark

Minimum blowdown temperature


14.99
Case-1: Pressurizing in min. ambient temp
154.1
Note 1
Selected Minimum Design Temperature
-20.00
Note 1: For pressurizing case as modelled in snapshot below, Fuel/Seal Gas Heater (60HAP-301) is
already on duty since it is required to operate before gas can be distributed through Mercury
Removal Unit (60NAF-301). Therefore, during pressurizing from 0 atm, the temperature result
is still considerably high.

Pressurizing case

Sheet 1 of 3

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 4 - Minimum Design Temperature

1. With the exception for pressurizing in minimum ambient temperature (case-2), the lowest predicted
temperature for Fuel / Seal Gas Filter Coalescer is -5.35oF (case-3), therefore the minimum design

Sheet 2 of 3

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 4 - Minimum Design Temperature

1. With the exception for pressurizing in minimum ambient temperature (case-2), the lowest predicted
temperature for Fuel / Seal Gas Filter Coalescer is -5.35oF (case-3), therefore the minimum design

Sheet 3 of 3

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 5
Pressure Drop Check

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 5 - Pressure Drop Check

Settle out Pressure, psig


1st stage no 2nd stage no
leak
leak
887
1131
578
957
471
885
359
811
260
779

Leak case

Required seal gas pressure as per GTC


spec (psig)
1st stage no 2nd stage no
leak
leak
1181
937
1007
628
935
521
861
409
829
310

Leak case

Case-1
994
1044
Case-2
744
794
Case-3
652
702
Case-4
557
607
Case-5
487
537
Notes:
Operating pressure and pressure drop allocation is given in sketch below, to be validated during EPCI phase.

Sheet 1 of 2

Compressor
Discharge Header
Pressure (psig)

Pressure at the
Seal Gas Supply
Skid (psig)

1270
1270
1270
1240
1060

1220
1220
1220
1190
1010

TO SEAL GAS
DISTRIBUTION
SYSTEM

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 5 - Pressure Drop Check

Note:
1. 350 psig is taken as basis for fuel gas pressure delivery into GTC skid.

Sheet 2 of 2

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 6
GTC and GTG Fuel Gas Demand

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 6 - GTC and GTG Fuel Gas Demand

Note:
1. BHP for each compressor case above is used for fuel gas demand calculation as given in
Attachment 1, note that no external or girbox losses given in the value above.

Sheet 1 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 6 - GTC and GTG Fuel Gas Demand

Note:
1. BHP for each compressor case above is used for fuel gas demand calculation as given in
Attachment 1, note that no external or girbox losses given in the value above.

Sheet 2 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 6 - GTC and GTG Fuel Gas Demand

Note:
1. BHP for each compressor case above is used for fuel gas demand calculation as given in
Attachment 1, note that no external or girbox losses given in the value above.

Sheet 3 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 6 - GTC and GTG Fuel Gas Demand

Note:
1. For Fuel Gas Demand calculation based on Turbine Power and Heat Rate, 10% margin is
added as per vendor info stated above.

Sheet 4 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 6 - GTC and GTG Fuel Gas Demand

Note:
1. BHP for each compressor case above is used for fuel gas demand calculation as given in
Attachment 1, note that no external or girbox losses given in the value above.

Note:
1. Heat rate 7709 Btu/HP-hr at maximum ambient temperature 100oF above is used for fuel gas
demand calculation as given in Attachment 1.

Sheet 5 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 6 - GTC Fuel Gas Demand

Note: 1. 1600 scfm (2.30 MMscfd) is used as a basis for GTG fuel gas demand.
2. Existing GTG use same model to the new GTG proposed model which is Taurus 70.

Sheet 6 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 7
LP Fuel Gas Demand

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 7 - LP Fuel Gas Demand

Vendor Data for Pilot Gas Demand

Note: 1. 45000 BTU/hr is taken as a basis for Pilot Gas Demand.

Sheet 1 of 2

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 7 - LP Fuel Gas Demand

Flarenet snapshot calculation for Purge Gas Demand

Purge gas to flare header is


1.13 MMscfd (2,422 lb/hr)

Note:
1. Above snapshot is taken from flare header sizing result as a part of Blowdown, Relief and Flare Study
Doc.No. B-84567-SB-PP0-DRT-ST-00-0006.

Sheet 2 of 2

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 8
Line Sizing

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 8 - Nozzle and Line Sizing

Sheet 1 of 6

Summary Inlet Line Sizing for Fuel / Seal Gas Mercury Guard Bed

Case-1

Size
6

Case-2
Case-3
Case-4
Case-5

6
8
6
6

Remark

Selected as design case

Nozzle Sizing Calculation


INLET DEVICE

NO INLET DEVICE

NOZZLE DESCRIPTION
MOMENTUM CRITERIA, Pv2

UNIT

GAS INLET
670

GAS OUTLET
2500

LIQUID OUTLET
N/A

N/A

N/A

lb/hr

39563

39563

0.390

1.10
10.01

1.10
10.01

37.37
N/A

10
30
10.136
0.560

8
20
8.125
0.360

2
40S
1.939
0.020

lb/ft.s
ft/s

VELOCITY CRITERIA
MASS FLOWRATE
MASS DENSITY
ACTUAL GAS RATE

lb/ft
ft3/s
in

NOMINAL DIAMETER
PIPING SCHEDULE
INSIDE DIAMETER
AREA

in
2

VELOCITY
2
MOMENTUM CALCULATED, rv

ft
ft/s
lb/ft.s

REMARK

Unit

17.87

27.81

0.00014

350.66

849.31

N/A

OK

OK

OK

Size
selected
(Note 2)

Inlet Nozzle
inch
10
Gas Outlet Nozzle
inch
8
Liquid Outlet Nozzle
inch
2
Note:
1. Fluid data is taken from Highest Gas Demand Case HYSYS simulation (see attachment 2)
2. Nozzle sizing calculation is for preliminary only, to be verified by vendor calculation.

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 8 - Nozzle and Line Sizing

Sheet 2 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 8 - Nozzle and Line Sizing

Sheet 3 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 8 - Nozzle and Line Sizing

Sheet 4 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 8 - Nozzle and Line Sizing

Sheet 5 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 8 - Nozzle and Line Sizing

Sheet 6 of 6

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 9
Required Filtration Performance

SUBAN COMPRESSION PROJECT


Attachment for Process Datasheet Fuel Gas Filter Coalescer

ConocoPhillips (Grissik) Ltd.

Attachment 9 - Required Filtration Performance

GTC Vendor Data for Required Filtration Performance

Sheet 1 of 1