NTDC operates and maintains twelve 500 KV and twenty nine 220 KV Grid Stations, 5077 km of 500 KV transmission
lineand7359kmof220KVtransmissionlineinPakistan.
View500KVGridStations
ViewPotentialConsumers
MAINLINKS
TheCompany
Projects
EnergyResources
TransmissionNetworks
Tenders
Departments
Careers
ViewPersonalFile
OldNTDCMail
ServicesDivision
NPCC
CPPA
GSIS
CPPAG
Downloads
ContactUs
http://www.ntdc.com.pk/Grid200.php
LISTOF220KVGRIDSTATIONS
1
Islamabad
BURHAN
BANNU
DAUDKHEL
MARDAN
SANGJANI
SHAHIBAGH
UNIVERSITY
Lahore
BUNDROAD
GHAKKAR
10
JARANWALA
11
KALASHAHKAKU
12
LUDEWALA
13
NISHATABAD
14
NEWKOTLAKPAT
15
RAVI
16
SARAFRAZNAGAR
17
SIALKOT(SAHOWALA)
18
WAPDATOWN
19
SHALAMAR
20
SUMUNDARIROAD
21
Multan
NEWMUZAFFARGARH
1/7
5/16/2016
HRIS
NationalTransmissionAndDespatchCompanyLimited(NTDC)Pakistan
22
BAWALPUR
23
ERP
HIMS
CONTACTUS
ForHRQuriesClickHere
Email:hr@ntdc.com.pk
VEHARI
24
Hyderabad
HALAROAD
25
QUETTAINDUSTRIAL
26
SIBBI
27
SHIKARPUR
28
T.M.KHAN
29
DAHARKI
30
ROHRI
PROFILEMDNTDC
LISTOF220KVGRIDSTATIONSUNDERCONSTRUCTION
EngineerMuhammadArshadChaudhry
GRIDSTATIONWAPDATOWN,LAHORE
GRIDSTATIONGHAZIROAD,LAHORE
GRIDSTATIONROHRI
GRIDSTATIONKHUZDAR
GRIDSTATIONMANSEHRA
GRIDSTATIONCHISHTIAN
GRIDSTATIONKASOWAL
GRIDSTATIONDADUKHAIL
220KVDaudKhelG/Stn.wascommissionedon25.09.1995with2x160MVA220/132KVPowerT/Fs.TheG/Stn
isbeingfeedfrom500KVG/Stn.Peshawarthrough220KVD/CT/LineandisconnectedwithChashmaNuclear
PowerStationthrough220KVD/CT/Line.220KVDaudKhelG/Stn.isalsoconnectedwith220KVBannuG/Stn
and500KVSh.MuhammadiPeshawarG/Sthrough220KVD/CDaudKhelBannuand220KVSh.Muhammadi
DaudkhelT/Line.OneNo.13MVA,132/11KVPowerT/FisalsoinstalledattheG/Stn.For220KVbays,double
busbarwithone&halfbreakerschemeandfor132KVbydoublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONBANNU
Thenew220/132KVG/Stn.Bannuwith2x160MVA,220/132KVAutoT/FBankswascommencedon07.05.1996
andcommissionedonnoloadbybackfeeding11KVsupplyon19.07.1999.TheGridStationisconnectedwith
220KVDaudkhelG/Sthrough220KVD/CT/Lines.2x26MVApowertransformersarealsoinstalledatthegrid
station.For220KVbaysone&halfbreakersschemeandfor132KVbaysdoublebusbarwithsinglebreaker
schemeisused.
Top
GRIDSTATIONMARDAN
220KV3rdT/Fenergizedon11/90atMardanG/Stn.wascommissionon05.02.1983with2x160MVA,
220/132KVPowerT/Fs.The3rd160MVA,220/132KVPowerT/Fwascommissionduring11/90.TheG/Stn.is
beingfedfromTarbellathrough220KVD/CT/Line.220KVMardanG/Stn.1x26MVA&1x40MVA,132/11KV
PowerT/FsarealsoinstalledattheG/Stn.For220KVbays,doublebusbarwithsinglebreakerschemeandfor
132KVbaysalsodoublebusbarwithsinglebreakerschemeisused.
Top
http://www.ntdc.com.pk/Grid200.php
2/7
5/16/2016
NationalTransmissionAndDespatchCompanyLimited(NTDC)Pakistan
GRIDSTATIONBURHAN
220KVBurhanG/Stn.wascommissionedon01.06.1977with3x160MVA,220/132KVAutoTransformerBanks.
ThegridstationisbeingfedfromTarbelathrough220KVthreeno.circuitsTarbellaBurhantransmissionline.
Onecircuitof220KVisalsoconnectedwithISPRGridStation.OneNo.13MVA,132/11KVpowerT/Fisalso
installedatthegridstation.For220KVbays,doublebusbarwithoneandhalfbreakerschemeisused.For132
KVbuys,doublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONISPR(SANGJANI)
220KVIslamabadPeshawarRoad(Sangjani)G/Stn.hasbeencommissionedon17.12.1998with3x160MVA,
220/132KVPowerT/Fs.TheG/STn.isbeingfedthrough220KVD/CRawatISPRand220KVTarbelaISPR
and220KVBurhanISPRSingleCircuits.TwoNos.132/11KVPowerT/Fsofcapacity10/13MVAeacharealso
installedattheG/Stn.For220KVbays,doublebusbarwithoneandhalfbreakerschemeand132KVbays
doublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONUNIVERSITYISLAMABAD
220KVUniversityGridStationwascommissioned09.10.2004withoneNo.250MVAandoneNo.160MVAAuto
Transformer.ThisGridStationisbeingfedfrom500KVGridStationRawatthrough220KVDoubleCircuit.This
GridStationisalsofeeding02No.20/26MVAAutoTransformers.
For220KVand132KVBaysdoublebusbarsinglebreakerschemerisused.
Top
GRIDSTATIONSHAHIBAGHPESHAWAR
220KVShahiBaghGridStationwascommissionedon28.02.2006with04No.160MVAAutoTransformers.This
GridStationisbeingfedfromBarothathrough220KVsinglecircuitandfrom500KVGridStationSheikh
Muhammadithough220KVsinglecircuit.ThisGridStationisalsofeeding02No.10/13MVAPower
Transformers.
For220KVBaysone&halfbreakerschemeisused.For132KVBaysdoublebusbarwithsinglebreakerschemer
isused.
Top
GRIDSTATIONGAKHAR
132kvGhakharG/Stn.whichwascommissionedduring01/77wasupgradedto220KVlevelwithcommissioning
on11.06.1982.220KVGhakharG/Stn.has04Nos.160MV,220/132KVPowerT/Fsand02Nos.26MVA,
132/11KVPowerT/FsinstalledattheG/Stn.TheG/Stn.isbeingfedfromManglaPowerHousethrough02Nos.
220KVD/CT/Lines.ThisG/Sisalsoconnectedwith220KVG/SSialkotthroughSingleCircuitand500KVNokhar
andManglaPowerHousethroughINOutarrangement
Top
http://www.ntdc.com.pk/Grid200.php
3/7
5/16/2016
NationalTransmissionAndDespatchCompanyLimited(NTDC)Pakistan
GRIDSTATIONSIALKOT
220KVSialkotG/Stn.wascommencedon08.10.1995andcommissionedon11.08.1999with3x160MVA,
220/132KVPowerT/Fsand2x13MVA,132/11KVPowerT/Fs.TheG/Stn.isconnectedwith220KVG/SGhakhar
and220KVG/SK.S.K.throughsinglecircuiteach.For220KVBays,one&halfbreakerschemeisusedandfor
132KVbaysdoublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONKALASHAHKAKU
KalaShahKakuGridStationwascommissionedduring1970with3x160MVA,220/132KVAutoTransformer
Banks.Thisgridstationisconnectedwith220KVManglaP/Housethrough03No.220KVcircuits.ThisG/Sis
alsoconnectedwith500KVGatti,220KVBundRoad,220KVRaviG/Stationsthrough220KVdoublecircuiteach
andalsoconnectedwith220KVSialkotG/Sthrough220KVsinglecircuit.TwoNo.26MVA,132/11KVPowerT/F
isalsoinstalledtheG/Stn.For220KVbaysdoublebusbarwithone&halfbreakerschemeisusedfor132KV
bays,doublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONRAVILAHORE
132KVRaviG/Stn.whichwascommissionedduring1970hasbeenupgradedto220KVlevelwith
commissioningon21.03.1994.220KVRaviG/Stn.has3x250MVA220/132KVPowerT/FsandtwoNos.
132/11KVPowerT/Fseachofcapacity26MVA,132/11KVinstalledintheG/Stn.TheG/Stn.isconnectedto
220KVKalaShahKakuG/Stn.through220KVD/CtwinbundleconductorsRaviKalaShahKakuT/Line.The
G/Stn.isalsoconnectedwith500KVLahore(Sheikhupura)G/Stn.through220KVS/CRaviSKPand220KVS/C
RaviAtlasPowerHouse.For220KV&132KVbaysdoublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONBUNDROADLAHORE
220KVBundRoadG/Stn.wascommissionedon24.06.1988.4x160MVA,220/132KVautotransformersare
installed.Thisgridstationisalsofeeding2x26MVAtransformers.Thisgridstationisconnectedwith500KV
Lahore(Sheikhupura)G/Stn.through04No.220KVT/Linesandalsoconnectedwith220KVKalaShahKakuand
220KVNewKotLakhpathG/Stns.through220KVD/CT/Lines.For220KVbaysdoublebusbarwithone&half
breakerschemeandfor132KVbaysdoublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONKOTLAKHPATLAHORE
220KVKotlakhpatgridstationwascommissionedduring1979with3x250MVA,220/132KVautotransformer
banks.Thegridstationisconnectedwith220KVBundRoadgridstationthrough220KVD/Ctransmissionlines
andalsoconnectedwith500KVLahore(Sheikhupura)gridstationand220KVSarfrazNagargridstationthrough
220KVD/Ctransmissionlines.ThreeNos.26MVA,132/11KVpowertransformersareinstalledatthegridstation.
For220KVbays,aswellasfor132KVbaysdoublebusbarwithsinglebreakerschemeisused.
Top
http://www.ntdc.com.pk/Grid200.php
4/7
5/16/2016
NationalTransmissionAndDespatchCompanyLimited(NTDC)Pakistan
GRIDSTATIONSARFRAZNAGAR
220KVG/Stn.SarfrazNagarwascommissionedon17.04.1995with3x160MVA,220/132KVAutotransformer
Banks.OneNo.Powertransformerofcapacity26MVA,132/11KVisalsoinstalledattheG/Stn.Thegridstation
isconnectedwith220KVNewKotlakpatgridstationthrough220KVD/Ctransmissionlinesandalsoconnected
with220KVYousafwalaG/Stn.through220KVD/CT/Lines.For220KVbays,doublebusbarwithoneandhalf
breakerschemeisused.For132KVbuysdoublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONNISHATABADFAISALABAD
220KVNishatabadG/Stn.wascommissionedon03.03.1960with4x63MVA&1x100MVA,220/132KVAuto
TransformerBanks.2x37.5MVA,132/66KVPowerTransformersarealsoinstalledatthegridstation.Thegrid
stationisbeingfedfrom500KVGattigridstationthrough220KVD/Ctransmissionlineandalsoconnectedwith
220KVSammundriRoadGridStationthrough220KVD/Ctransmissionline.
Top
GRIDSTATIONJARANWALAROADFAISALABAD
220KVJaranwalaRoadFaisalabadG/Stn.wascommissionon08.12.1982.TherearethreeNos.160MVA,
220/132KVAutoTransformersBanksinstalledatthegridstation.The220KVJaranwalaRoadG/Stn.isbeingfed
from500KVGattiG/Stn.through220KVD/C500KVGattiJaranwalaRoadtransmissionline.TwoNos.26MVA,
132/11KVPowerTransformersarealsoinstalledatthegridstation.
For220KVbaysaswell132KVbaysdoublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONSUMMANDRIROADFAISALABAD
220KVSummandriRoadFaisalabadG/Stn.wascommissionedon12.10.1995.3x160MVA,220/132KVAuto
TransformerBanksareinstalled.TheG/Stn.isbeingfedthroughINOUTarrangementof220KVD/CNishatabad
500KVNewMultanT/Line.2x13MVA,132/11KVPowerT/FareinstalledattheG/Stn.
For220KVbays,doublebusbarwithoneandahalfbreakerschemeisused.whereasfor132KVbaysdouble
busbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONLUDEWALASARGODHA
220KVLudewalaG/Stn.wascommissionedwith3x160MVA,220/132KVAutoT/Fs.TheG/Stn.isconnectedto
500KVGattiG/Stn.through220KVD/CT/Lineand220KVChashnupthrough220KVD/CT/Line.Oneno.13MVA
132/11KVpowertransformerisalsofeedingfromthesaidgridstation.For220KVbaysand132KVdoublebus
barwithsinglebreakerschemeisused.
Top
GRIDSTATIONVEHARI
http://www.ntdc.com.pk/Grid200.php
5/7
5/16/2016
NationalTransmissionAndDespatchCompanyLimited(NTDC)Pakistan
220KVVehariG/Stn.wascommissionedon29.03.1998.3x160MVA,220/132KVAutoTransformerBanksare
installedatthegridstation.1x13MVA132/11KVpowertransformerisbeingfedfromthesaidgridstation.The
G/Stn.isconnectedwith500KVYousafWalaG/Stn.through220KVD/CYousafWalaVehariT/Line.The220KV
VehariG/Stn.isalsoconnectedto500KVMultanaswellas220KVKotAdduG/Sthrough220KVS/CT/Lines.
For220KVbays,doublebusbarwithoneandahalfbreakerschemeisused.whereasfor132KVbaysdouble
busbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONBAHAWALPUR
220KVBahawalpurGridStationwascommissionedon28.02.2003.3x160MVAAutoTransformersareinstalledat
theGridStation.ThisGridStationisbeingfedfromMuzafargarhPowerHousethrough220KVDoubleCircuit.
ThisG/SisalsofeedingoneNo.26MVAPowerTransformer.For220KVbays,doublebusbarwithoneanda
halfbreakerschemeisusedwhereasfor132KVbaysdoublebusbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONMUZAFARGARH
220KVMuzafargarhGridStationwascommissionedon30.06.2008.2x160MVAAutoTransformersareinstalledat
theGridStation.ThisGridStationisbeingfedfromTPSMuzaffargarhand500KVMultanGridStationthrough
220KVSingleCircuits.
For220KVbays,doublebusbarwithoneandahalfbreakerschemeisusedwhereasfor132KVbaysdouble
busbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONSIBBI
220KVSibbiGridStationwascommissionedon02.02.1982with2x160MVA,220/132KVAutoTransformer
Banks.TwoNo.13MVA,132/11KVPowerTransformersarealsoinstalledatthegridstation.Thegridstationis
beingfedfromGudduthrough3Nos.220KVcircuits.OneNo.circuitcomingdirectfromGuddutoSibbiand
twocircuitsfromGuddutoSibbihavebeenmadeINOUTatUchPowerHouse.ThisGridStationisalso
connectedwithQuettaIndustrialGridStationthrough220KVDoubleCircuit.
For220KVbays,doublebusbarwithoneandahalfbreakerschemeisused.whereasfor132KVbaysdouble
busbarwithsinglebreakerschemeisused.
Top
GRIDSTATIONQUETTAINDUSTRIALAREA
32kvQuettaIndustrialG/Stn.whichwascommissionedon14.10.1992wasupgradedto220KVlevelwith
commissioningon02.09.1995.220KVQuettaIndustrial.G/Stn.hasthreeNos.160MVA,220/132KVPower
TransformersandtwoNos.132/11KVPowerTransformers(OneNo.26MVA,132/11KVandOneNO.13MVA,
132/11KV)installedattheG/Stn.TheG/Stn.isbeingfedfrom220KVSibbiG/Stn.through220KVD/CSibbi
QuettaIndustrialT/Line.
For220KVbays,doublebusbarwithoneandahalfbreakerschemeisused.whereasfor132KVbaysdouble
busbarwithsinglebreakerschemeisused.
Top
http://www.ntdc.com.pk/Grid200.php
6/7
5/16/2016
NationalTransmissionAndDespatchCompanyLimited(NTDC)Pakistan
GRIDSTATIONHALAROADHYDERABAD
220KVHalaRoadHyderabadG/Stn.wascommissionedon02.06.1990with3x160MVA,220/132KVAuto
Transformer.OneNo.40MVA132/66KVandtwoNos.26MVA,132/11KVpowerT/Fsarealsoinstalledatthe
G/Stn.TheG/Stn.isconnectedto500KVJamshoroG/Stn.through220KVD/CJamshoroHalaRoadT/Line.
Top
GRIDSTATIONSHIKARPUR
220KVShikarpurG/Stn.hasbeencommissionedonnoloadbybackfeeding11KVsupplyonMarch28,2001.
3x160MVA,220/132KVAutoT/Fs.areinstalled.TheG/Stn.isconnectedwithTPSUchandTPSGudduthrough
220KVS/Ceach.TwoNos.132/11KVPowerT/Fseachofcapacity13MVAarealsoinstalledattheG/Stn.
For220KVbays,doublebusbarwithoneandahalfbreakerschemeandfor132KVbays,doublebusbarwith
singlebreakerschemeisused.
Top
GRIDSTATIONT.M.KHANROAD,HYDERABAD
220KVT.M.KhanRoad,HyderabadG/Stn.hasbeencommissionedon30.09.2000with2x160MVA,220/132KV
PowerT/Fs.TheG/Stn.isconnectedthrough220KVD/CT/Lwith500KVJamshoroG/Stn.TwoNos.132/11KV
PowerT/Fseachcapacity13MVAareinstalledattheG/Stn.
For220KVbays,doublebusbarwithoneandahalfbreakerschemeisusedwhereasfor132KVbaysdouble
busbarwithsinglebreakerschemeisused.
Top
HOME |THECOMPANY |PROJECTS |ENERGYRESOURCES |TRANSMISSIONNETWORKS |SERVICES |TENDERS |NEWS&MEDIA |CAREERS |SITEMAP |CONTACTUS
Copyright2016NationalTransmission&DespatchCompany(NTDC)
DesignedandDevelopedbyITDirectorate,NTDC
http://www.ntdc.com.pk/Grid200.php
7/7