Sei sulla pagina 1di 3

Contractor

Owner

Main Subcontractor

PROJECT NAME: Khabat Thermal Power Plant Units 1&2


OWNER: Ministry of Electricity of Kurdistan Regional Goverment
CONTRACTOR: POSCO Engineering & Construction Co. Ltd.
MAIN SUBCONTRACTOR: GAMA Power Systems Engineering &
Contracting Inc.
PROJE REFERENCE NO:
Re
v
A

Revision
Date
15.09.201
5

Description
For Review

Revision History
Created by
Checked by
A.E.
AKMAN

Emission
Status

Return
Status

B. GKCE

Vendor doc No.:

Vendor Logo

Approved by

Document Code :

Title, Subtitle

AUTO TRANSFORMER
TEST REPORT
(FOR SECONDARY)

Format
A4

Rev. A

Date
15.09.2015

Lang.
En

Date
15.09.2015

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

AUTO TRANSFORMER
TEST REPORT
(FOR SECONDARY)

ENG. N

SH/OF
2/3

CLIENT N

REV.

Summary
LIST OF REQUIRED TEST EQUIPMENT S
2.

SITE TESTS AND CHECKS COMMISSIONING REPORT

KESR Mh. Elektrik


ti.
Date
Name
Signature

Page

Revision
A

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

AUTO TRANSFORMER
TEST REPORT
(FOR SECONDARY)

ENG. N

SH/OF
3/3

CLIENT N

REV.

1. LIST OF REQUIRED TEST EQUIPMENTS


Test equipment
Designation / Manufacturer
FLUKE

Name
Signature

Type / Serial Nr

4
X

KESR Mh. Elektrik


ti.
Date

Test corresponding to paragraph

Potrebbero piacerti anche