Post Insulator Erection Installation Inspection

Checklist

Project Name

SEC PP13 PROJECT

Owner Name

Contractor

WORLEY PARSONS
resources&energy

GAMA POWER SYSTEMS


Main Subcontractor ENGINEERING & CONTRACTING
INC.

Area / Unit

PP13 CCPP

Item Name / Item


No / Description

ITP No

ITP Item

Report No

Date

Drawing No

Saudi Electric Company (SEC)

Rev.

Approximate Date/Time of Related Activity:

No.

ITEM DESCRIPTION

Visual check of the equipment.

Checking Erection release of steel support.

Checking of Package.

Assembly and fixing.

GAMA

a. Reviewing and checking of lifting plan.

b. Controlling of Insulator type according to voltage level and place


of use.
Checking of Screw torques.

Checking of Connector Erection.

WORLEY
PARSONS

Remarks / Comments

GAMA

HHI

3rd Party / Al

WORLEY PARSONS

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No:???, Rev.0