Sei sulla pagina 1di 1

Electrical Works(MV Switchgear Installation)

Inspection Checklist - 1

Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2

Owner Name

Ministry of Electricity (MOE) of Kurdistan


Regional Government

Contractor

POSCO ENGINEERING &


CONSTRUCTION CO., LTD.

Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING INC.

Area / Unit

SEE ATTACHED
DRAWING/CABLE LIST

Item Name / Item No


/ Description

ITP No

KP-00+++-CQ712-B7907

ITP Item

Report No

1,1 /1,2 / 2 / 3,1 / 3,2 / 3,3

Date
Rev.0

Drawing No
Approximate Date/Time of Related Activity:
No.

ITEM DESCRIPTION

Subcontractor

MV Switchgear and all accessories match with the shipping/delivery list

Floor civil works are done by civil discipline in accordance with the approved drawings

MV Switchgear and all accessories are installed in accordance with the approved
drawings

Cable connections and test are done in accordance with the approved MS and ITP for
Cable Pulling Termination and Jointing

Earth continuity is checked

All connections are done with torque wrench and marked.

Overall insulation measurement and continuity test is done (optional)

GAMA

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712-B7907-F01, Rev.0

Potrebbero piacerti anche