Sei sulla pagina 1di 3

PARK ONE

COMMERCIAL & LUXURY APARTMENTS

Daily Construction Report


WEATHER
TEMPERATURE: 31oC

CONDITIONS:
Snow

sunny

Partly Cloudy

Cloudy

Windy

WORKMEN/EQUIPMENT
WORKERS
Contract #01
Bukhari (piling
sub-contractor)

Mgt staff: 1
Labors:

TOTAL

Contract #05

Ch Zulfiqar
(excavation)

TESTS/INSPECTIONS
Contract #02

Contract #03

Sabz ali
(pile head
cutting)

Contract #04

Ishaq butt
(steel fixer)

Mgt staff: 1

Mgt staff:

Labors:

31

Labors:

TOTAL

32

TOTAL

10

Contract #06

Mgt staff: 1
Labors:
TOTAL

Contract #07

Azam (concrete
mobile pump)

1. Concrete compressive strength test


2.Pile load test (in process)

Royal
geotech(piling
sub -contractor)

9
10

Contract #08

Nazar(rental
excavator)

Deepwell (piling
sub-contractor)

Machines: 3
Mgt staff: 1

Mgt staff: 1

Mgt staff: 1

Labors:

Labors:

Labors:

TOTAL

TOTAL

TOTAL

Contract #09
Abbot
Construction
(Plastering)

Contract #10
Al-wahab
(Rental mobile
crane)

Mgt staff: 1

Mgt staff: 1

Labors:

Labors:

TOTAL 6

TOTAL

Mgt staff: 1

Labors:

TOTAL

Contract #11
Majid cont
(plastering)

Mgt staff: 1
Labors: 16
TOTAL

16

This legend shows the contractors working on a particular day.

21
22

Rain

EQUIPMENTS AVAILABLE AT SITE

REMARKS

REMARKS

EQUIPMENT AVAILABLE AT SITE

1. Auger machine

8.concrete mobile pump


9. Tractor

2. Excavator
3. Dewatering pumps

10. Mobile crane


11.Batching plant
12. Compressive testing machine
13.Plate compactor

4. Air compressor

01m

5. Welding plant
6. Dumper
7. Concrete mixer

SAFETY NOTE
Nil

KEY ACTIVITIES
Activity
1.steel cage fabrication

Qty
5

Unit
#

Total
-

2.de watering

Occurring (Quantity not available)

3.pile concreting

991

4.levelling and spreading

5.pile boring/drilling

6.Slush removal

Occurring (Quantity not available)

Activity detail
1.Pile concreting
Zone
1

Pile concreted
(particular
day )
-

Pile
concreted to
date
186

2
3

2
7

460
345

Total piles

Pile No

186

ICL-RCPL

Remarks

75

466
623,622
405
1049,1053,1046,829,828,827,826
Total pile concreted=991

2.Concrete compressive strength test for piles


Sample No of
Concrete
Pile No
#
days
Purchased
from
1
28
Sarwar
152,831,832,833,107,108,151
2

Total Concrete
used (M)

1042,1043,1044,670,671,1054

Strength
achieved (psi)
4463
3975

Required
strength
(28 days)
4000

Remarks
Passed
-

3.Pile cutting and excavation:


Pile cap

Grid

Zone

Excavation

PC 156

F~8

In process

Pile head cutting


Previous
This day
To date
102
20
122

PC4 A

F~3-4

Completed

4.Steel fixing and formwork:


Pile cap
Grid
PC12B
C~4-5
PC17

E~5

5.Plastering:
Location
Main office
Mustafa tower side

Status
Completed

Formwork
Placed

In process

Not placed

Grid
1~6
1~6

Completion status
Completed
5~6 (80 % completed)

6.Concrete compressive strength test for pile caps:


Pile Cap
Grid
-

Strength achieved
-

Remarks

Remarks
Bottom and top
reinforcement placed
Bottom main and dist bars
placed
Remarks
RFI awaited
RFI awaited

Strength Required (28 days)


-

Remarks
-

7.Pile load test result:


Pile no 711 grid F~11.
8. Dewatering was occurring.
9. Slush removal occurring.
11.Plastering Mustafa tower side grid 1~6 95% completed..

MATERIAL DELIVERIES
Items

DATE

1-05-2016

SOURCE/VENDOR

Signature

QTY

UNIT

REMARKS