Sei sulla pagina 1di 1

Turnco Tool & Instrument

Inc.

In-Process
Inspection Report
Date:

Job Number

109 Park Central Blvd.


Georgetown, TX 78634

01/09/2012

004

Rev:

ASM#

Approval:

Customer
Line
Number

Customer PO Number

Part Number

Material(s) Lot Number

Jerry Guffy

Rev

Lot Qty. Sample

Description
Initiated by:

Date Approved by:

Date

Sample Number:
Inspected By
Date
Inspected By
Date

Operation #______

Item

Operation #______
Dimension

Tolerance

Method

Visual Disposition
Dimensional Disposition
Yes o
NCR Required
NCMR Disposition Codes:

No o
Use As Is(UAI)

Tool #

Print
OP
Zone

Actual Values

AC / RE
AC / RE
If Yes, Enter NCR#
Disposition:
Rework(RWK) Process Correction(PC) Return to Vendor(RTV)

Scrap(SCRAP)

Training(TRN)

Notes:
Inspection Codes(Sample Number):

Inspection Report, Rev. 004

First Piece(FP)

In-Process(IP)

Final Inspection(FI)

Turnco Tool & Instrument, Inc.

First Article(FA)

RMA Inspection (RMA)

Page 1 of 1

Potrebbero piacerti anche