Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1.10 1.30M
Length of Wheelchair
0.60 0.75M
Width of Wheelchair
1.50M
0.70 1.20M
0.70M
Architectural Features Stairs, Walkways, Corridors, Doors, Entrances, Lifts, Ramps, Parking Areas,
Switches, Handrails, Thresholds, Floor Finishes, Drinking Fountains, Public
Phone, Seating
2 wheelchair seating
4 50 seating capacity
4 wheelchair seating
6 wheelchair seating
301 500 seating capacity; additional 1 wheelchair seating for every 100
additional seats
5 disabled seats
Regular bus
6 disabled seats
2 disabled seats
Airplanes
2 disabled seats
Jeepneys
20 minutes
International Symbol
of Access
0.90M
1 : 12 gradient
1 : 20 cross gradient
25MM
1: 20 or 5%
1.20M
13mm x13mm
projecting at 6.5mm
maximum
2.0M
Handrail height
1.0M 1.06M
300mm
Handrail extension
30mm 50mm
diameter
Handrail grip
50mm
40mm
1.50M min 2M
preferred
0.90m/sec
3.70M
1.80M x 1.50M
6.0M
1.5M
1.8M
0.10M
0.8
4.0KG
1.0KG
1.5M x 1.5M
0.82M & 1.06M : 0.90M Doorknobs and other hardware location above floor
preferred
1.06M
0.30M 0.40M
Kick-plate height
1.20M 1.30M
0.20M
Turnabouts to be provided
1.70M x 1.80m
Toilet signage
0.45M
1.20M
0.80M
0.60M 0.70M
0.5M
0.48M
Slanted Nosing
0.30M
30M
1.10M x 1.40M
0.90M 1.20M
20mm
1.0M
0.35M
0.20M
VIBRA ALARM
SECRETARY
Administration of Code
BUILDING OFFICIAL
Enforcement of Code
amount
Contract Lease
15 days
1 year or 12 months
1 month or 30 days
TYPE 1
Wood construction
TYPE 2
TYPE 3
TYPE 4
Steel, iron, concrete or masonry with fire resistance except permanent nonbearing structure may use fire retardant treated wood
TYPE 5
Steel, iron, concrete or masonry with fire resistance including all permanent
structures
Center line of
adjoining street
GENERAL USE
AND CHARACTER
OF OCCUPANCY
OF BUILDING
PRINCIPAL
GROUP A
RESIDENTIAL
DWELLING
28sqm
ZONING CLASSIFICATION
PARKING
Indegenouse
dwelling
1:6 units
DIVISION A2 non-leasing
occupants not
exceeding 10
persons
Single-attached or duplex or
Residential R2
1:1 lot
townhouse, Police barracks, medium density residential use, Lot: 100 120sq.m
steam/dry cleaning, branch characterized mainly as a low rise GFA: 30 42 sq.m
library, museum etc.
structure for exclusive use as
multiple family dwellings
2 Types
Basic R2 single attached or
duplex from 1-storey to 3-storeys
in height
Maximum R2 low rise multilevel building from 3-storeys to 5storeys in height
GROUP B
RES. HOTELS &
APARTMENTS
DIVISION B1 Multiple Dwelling
units
Residential R1
low density residential zone
characterized mainly by singlefamily, single detached dwellings
with usual community ancillary
uses on a neighborhood scale.
Such as: executive subdivisions
and relative exclusive residential
communities which are not
subdivisions
1: 6 lots
Lot: 32 72 sq.m
GFA:18-22 sq.m
1: 4 lots
Lot: 50 96sq.m
GFA: 30 42 sq.m
18.6sqm/person
boarding/lodging
houses,
hotels, apartments, convents
and
monasteries
which
accommodates more than
10 persons
Residential R3
High density residential use or
occupancy characterized mainly
as a low-rise or medium-rise
structure; condominium buildings
1:1 lot
Lot: Above
120sq.m
GFA: Above
42.0sq.m
DIVISION C1 Educational
Institution
1:2 units
GFA: 50.0sq.m
1:1 unit
GFA: above 50.0
150
2:1 unit
GFA: above
150sqm
Residential R5
A very high density residential
use, mainly as a medium-rise or
high-rise condominium
1:8 units
GFA: 18 -22sq.m
1:6 units
50sq.m (med.
market)
1:1 unit
50sq.m (med/open
market)
1:4 units
above 50-100
(med. Market)
1:1 unit more than
100sq.m
HOTEL
1:3 rooms
(urbanized area)
1:7 rooms (other
area)
2 tourist bus
parking
1 articulated truck
MOTEL
1 :1 unit
PENSION HOUSE
GROUP C
EDUCATIONAL
AND
RECREATIONAL
Residential R4
A medium to high density use
mainly as a low-rise townhouse
building. The term R4 specifically
refers to the series or rows of R4
within a subdivision lot/property
1 : 20 beds
Classroom:
1.80sq.m/person
Shops/Labs/Vocational
rooms: 1.4sq.m
Laboratory: 4.6sq.m
Dry Nursery:
3.25sq.m/person
Schools,
universities,
seminar/workshop
seminaries etc
colleges,
facilities
CHURCHES AND
WORSHIP PLACE
1 car and 1
jeepney : 50sq.m
congregation
PUBLIC ELEMENTARY,
SECONDARY AND
VOCATIONAL SCHOOL
1 off-street cum
on site : 10
classrooms
1 off street for
passenger loading
for 2 jeeps
DIVISION C2
Recreational
GROUP D
INSTITUTIONAL
DIVISION D1
where personal
liberty of inmates
are restrained or
quarters of those
rendering public
assistance and
maintenance of
peace and order
PRIVATE ELEMENTARY,
SECONDARY AND
VOCATIONAL SCHOOL
1 : 5 classrooms
1 school bus :
100 students
1 off street for
passenger loading
for 2 jeeps
1 : 5 classrooms
1 school bus :
200 students
1 off street for
passenger loading
for 2 jeeps
1 : 3 classrooms
1 school bus :
100 students
1 off street for
passenger loading
for 2 jeeps
Amusement
Halls,
GENREAL INSTITUTION (GI)
1 : 4 bowling alley
Massage/Sauna
Parlors a community to national level of
Dancing School, Billiards etc
institutional use
characterized as low-rise to
medium rise or high-rise for
educational training and related
facilities
Sanitaria: 8.4sq.m/person
Nursing homes:
7.4sq.m/person
Sleeping Dept:
11sq.m/person
In-patient: 22sq.m/person
Dry Nursery:
3.25sq.m/person
Mental Hospitals, Police Fire
GENERAL INSTITUTION (GI)
station, Jails, Rehabilitation a community to national level of
Centers
institutional use
characterized as low-rise to
medium rise or high-rise for
medical, government service,
administrative and related facilities
MENTAL HOSPITAl,
SANITARIA AND ASSYLUM
DIVISION D2 for
Health Care
1 : 25 beds
1 off street for
passenger loading
for 2 jeeps
1 : 25 beds
1 off street for
passenger loading
for 2 jeeps
1 articulated truck
1 standard truck
PRIVATE HOSPITAL
DIVISION E1
where no work is
done except for
change of parts
requiring no open
flame, welding or
use of highly
flammable liquids
1 : 12 beds
1 off street for
passenger loading
for 2 jeeps
1 articulated truck
1 standard truck
for
1 : 12 beds
1 off street for
passenger loading
for 2 jeeps
COMMERCIAL 1 OR LIGHT
COMMERCIAL C1
a neighborhood or commercial
level
use
occupancy
characterized as low-rise structure
for low intensity commercial/trade
service; 1-3 storey shopping
center, small offices etc.
DIVISION E2
business and
mercantile in
nature
1 : 500sq.m
1 off street for
passenger loading
for 2 jeeps or bus
RESTAURANT,
FASTFOOD, BEERHOUSE
1 : 20sq.m cust.
Area
2 tourist bus slots
NIGHTCLUBS, SUPER
CLUBS AND THEATERRESTAURANT
1 : 30sq.m
1 pooled parking
(for units with a
GFA 18 40sq.m)
UNITS LOCATED IN
OFFICE, COMMERCIAL OR
MIXED USE
CONDOMINIUM
1 : unit w/ GFA 41
70sqm
1 : unit w/ GFA
70sqm
COLUMBARIUM
DIVISION E1
where no work is
done except for
change of parts
requiring no open
flame, welding or
use of highly
flammable liquids
GROUP F
INDUSTRIAL
(NON POLLUTIVE
& NONHAZARDOUS)
DIVISION F1
Light Industrial
SPECIAL (SPE)
1 : compartment
other
vertical
facilities
not niche
mentioned
under
regular
uses/occupancies of buildings
such as cemeteries, memorial
parks and the like
GROUP G
STORAGE AND
HAZARDOUS
INDUSTIAL
(POLLUTIVE/
NONHAZARDOUS /
POLLUTIVE AND
HAZARDOUS
Light Hazard:
9.3sq.m/person
DIVISION G1
Medium Industrial
which shall include
storage of
hazardous and
highly flammable
materials
INDUSTRIAL 1 I1
Light industrial use/occupancy
characterized mainly as a low-rise
but sprawling building structure
for low intensity manufacturing or
production activities
1 : 1000sq.m of
GFA
1 bus : 100
workers
INDUSTRIAL 2 I2
medium
industrial
use
characterized mainly as a low-rise
but sprawling building for medium
intensity
manufacturing
or
production activities
1 : 1000sq.m of
GFA
1 bus : 100
workers
1 articulated truck
1 standard truck
UTILITIES TRANSPORTATION
AND SERVICES (UTS)
Range
of
utilitarian/functional
uses/occupancies characterized
mainly by low-rise or medium rise
buildings for low to high density
community functions
DIVISION G2
Medium Industrial
which shall include
storage flammable
materials
DIVISION G3
Medium Industrial
buildings for wood
working activities,
Sawmills,
planing
mills,
paper factories, textile and
fiber spinning mills garment
and undergarment factories
paper cardboards,
textile and garment
DIVISION G4
Repair garages and shops,
Med Industrial for
factories for engines and
repair garages &
testing facilities
engine manufacture
DIVISION G5
Medium Industrial
for aircraft facilities
GROUP H
ASSEMBLY LESS
THAN 1000
DIVISION H1
Recreational;
occupant load less
than 1000
Theaters,
auditoriums,
concert halls, little theaters
and audio-visual rooms
PARK STRUCTURES
RECREATION &
ENTERTAINMENT (PRE)
Range of recreational uses or
occupancies, characterized mainly
as a low or medium rise building
for low to medium intensity
recreational functions - gym
1 : 50sq.m
spectator area
1 jeep : 50sq.m
spectator area
1 bus : 200
spectators
CULTURAL (CUL)
A community to National level of
cultural use characterized mainly
as low rise or medium rise building
for cultural activities cultural
center
DIVISION H2
Dance
halls,
cabarets,
assembly with
ballrooms, cockfight arena,
stage and occupant skating rinks
load 300 or more
-do-
DIVISION H3
Dance Halls, Skating Rinks
assembly with
stage and occupant
load of less than
300
-do-
DIVISION H4
tourism estate
developments or
tourism oriented
Sport
stands,
reviewing
stands,
grandstands,
all
types of resort complexes
COVERED AMUSEMENT
PARKS
1 : 50sq.m GFA
1 : 100sq.m GFA
GROUP I
ASSEMBLY of
1000 or more
DIVISION I1
Coliseum
and
sport
PARK STRUCTURES
assembly with
complexes, theaters, concert
RECREATION &
stage and occupant halls, convention center
ENTERTAINMENT (PRE)
load of 1000 or
Range of recreational uses or
more
occupancies, characterized mainly
as a low or medium rise building
for low to medium intensity
recreational functions gym
1 : 50sq.m
spectator area
1 jeep : 50sq.m
spectator area
1 bus : 200
spectators
CULTURAL (CUL)
A community to National level of
cultural use characterized mainly
as low rise or medium rise building
for cultural activities cultural
center
GROUP J
ACCESSORY
AGRICULTURAL
& OTHERS
DIVISION J1
Agricultural
structures;
AGRICULTURAL (A)
1 : 1000sq.m of
sheds, bams, poultry house, for low to high intensity agricultural GFA
piggeries, stables
related activities
1 bus : 100
workers
1 articulated truck
1 standard truck
AGRO INDUSTRIAL (AI)
For low to high intensity agroindustrial related activities
DIVISION J2
Accessories
DIVISION J3
AMBF
MACA
AMVB
Allowable Maximum Building TLA Setbacks (Land required for yards/courts) + additional
Footprint
buildable lot area due to firewall
Maximum Allowable
Construction Area
TGFA
GFA
TLA
BHL
BB
Building Bulk
PSO
Percentage of Site
Occupancy
FLAR
OFB
Max
ISA
Min
USA
TOSL
OSL
750mm
No firewall for R1
R2 firewall
R3 firewall
R3 firewall
R5 firewall
RROW ; 6 7M
RROW ; 4 5M
RROW ; 3M
4 kilometer
2.5M x 5M
2.15M x 6M
Parallel parking
3.6M x 12M
3.6M x 18M
Articulated truck
3M x 9M
Jeepney
20 % within 200M
radius
Minimum easement
1 sanitary
Minimum toilet
Minimum footing
200kg / sq.m
150kg / sq.m
120kg / sq.m
200mm x 200mm x
750mm
Entrance / exit
Clearance for
cemeteries
3M
st
nd
1M deep
150mm
50mm
100mm
300x300x460
50sq.m.
1.60sq.m
Administrative office
100m
5% of GFA of
cemetery
Parking area
GROUP A, B, C, D
AND J
GROUP E, F, G, H AND I
INTERIOR
50.00%
20.00%
INSIDE
20.00%
15.00%
CORNER
10.00%
5.00%
THROUGH
10.00%
5.00%
CORNER-THROUGH
5.00%
5.00%
5.00%
5.00%
30-50% (A,B,C,D,E-2
& H)
4.5 2 2
BASIC
R 2 (FRONT SIDE
REAR)
322
MAXIMUM
R 2 (FRONT SIDE
REAR)
822
BASIC
R 3 (FRONT SIDE
REAR)
300
MAXIMUM
R 3 (FRONT SIDE
REAR)
8 2(optional) 2
INDIVIDUAL LOT/UNIT
R 4 (FRONT SIDE
REAR)
4.5 2(optional) 2
R 5 (FRONT SIDE
REAR)
633
30 METERS &
ABOVE
855
25 -29 METERS
633
20 24 METERS
533
10 19 METERS
522
BELOW 10 METERS
522
SIDEWALK
PLANTING STRIP
30 METERS &
ABOVE
1/6 to of RROW
25 -29 METERS
20 24 METERS
10 19 METERS
to 1/3 of RROW
BELOW 10 METERS
to 1/3 of RROW
OPTIONAL
WIDTH OF STREETS
0.60 METER
0.90 METER
1.00 METER
1.10 METERS
1.30 METERS
1.40 METERS
14 METERS OR
OVER
1.50 METERS
MINIMUM ROAD
WIDTH
MIN. SIDEWALK
WIDTH (EACH
SIDE)
TOTAL RROW
WIDTH
UP TO 6 UNITS
3M
0.60M
4.2M
7 15 UNITS
4M
1M
6M
16 25 UNITS
5M
1M
7M
26 35 UNITS
6M
1M
8M
36 and ABOVE
6.7M
1M
8.7M
AGRICULTURAL AREAS
FOREST AREAS
th
400mm
2HR
Mezzanine Floor
6sqm; minimum
dimension of 2m
3sqm; minimum
dimension of 1.5m
Kitchen
1.2sqm; minimum
dimension of 0.90m
School rooms
Habitable rooms
.82M x 1.0M
820mm
200mm
300mm
800mm
1/3 to slope
Minimum entry ramp of the driveway connecting the roadway surface to the
sidewalk
1/8 slope
If curb is 200mm
1/10 slope
2 steps
300mm
Minimum run
100mm
Minimum rise
RROW ABOVE
GRADE
From the finished surface of the road way all the way up to the air
RROW AT GRADE
RROW BELOW
GRADE
From the finished surface of the road all the way into the ground
10M
Minimum RROW width that services the lot on which basement can be
constructed
1.4M
DRINKING WATER
APPROVAL
PIPE MATERIALS
NOISE STANDARDS
300mm
3M
2.4M
4M
3.6M
650kg/sqm
1M
2.4M
30 days
48 hours
10 days
BENCH
7.5M length
300mm
600mm
1.8M
CAMBER
DRAFT STOPS
300mm change of
elevation
Requires ramp
2 exits
3 exits
4 exits
45 meters
No sprinkler
50 meters
Provide sprinkler
13sqm
Prohibited
700mm
1.2M
50mm
1.1M
6M
900mm
50 or less
750mm
Less than 10
200mm x 250mm
1500mm x 300mm
250mm
1.2M
3.6M
1 for every 3M
Staircase handrail
800 900mm
5mm
Maximum variation
2.0M
Minimum headroom
1.1M
1 : 10 slope
1 : 8 slope
10.7 LUX
800mm
840mm
450mm
500mm
525mm
550mm
600mm
750mm
850mm
400mm
Footboard
2 exits
Minimum for safe dispersal area accommodation more than 300 persons
3 exits
More than 6000 persons (safe dispersal area) accommodation more than 1000
persons
4 exits
More than 9000 persons (safe dispersal area) accommodation more than 3000
persons
2 exits 1 may be a
ladder
625mm
1.5M
6M
12.5mm
Fire extinguishing
system
4 or more storeys
2 or more storeys
1.2M
38mm
23M
Proscenium wall
1.2M
600mm
2 hoistways
4 elevators
3 hoistways
2 hoistways
60 degrees
30mm
1 elevator
5-storey building
30 degrees
560mm
1.2M
38M / minute
Escalator speed
1M
1 safety valve
1 year
15 30 days
20 24 deg celcius /
4.6 7.6M /minute
2.10M
100mm pipe
To be flanged
MATERIAL PIPED
PIPE COLOR
PIPE IDETIFICATION
WATER DISTILLED
GREEN
Distilled water
RED
WATER HOT
WATER HIGH PRESSURE
YELLOW
Hot water
H.P. water
GREEN
L.P. Water
Treated water
1.2M 3M height
clearance
600mm
300mm
3M
1M 5M height
clearance
4M
3M height 300mm
projection
4.5 height 1M
projection
RA 9266
ARCHITECT
15 years
ARCHITECT-OFRECORD
ARCHITECTURAL
FIRM
AUTHORSHIP
SERVICE
AGREEMENT
Duly notarized written Contract stipulating the scope of services and guaranteeing
compensation
IAPOA
ASSOCIATION
ARCHITECTURAL
COMPANY
ARCHITECTURAL
CORPORATION
ARCHITECTURAL
PARTNERSHIP
Group of two or more architects duly registered with the SEC and BOA
CERTIFICATE OF
REGISTRATION
FILIPINO
COUNTERPART
PLANNING
PHYSICAL PLANNER
Person whose name and registration license number is entered in the PRC
registry book
PIC
SOLE
PROPRIETORSHIP
URBAN DESIGN
CIAC
GOCC
10 YEARS
3 years
Term of office
30 days
CONTRACT
CONTRACTUAL
OBLIGATIONS
OBLIGATIONS IN
TORT
ESTIMATES
COST ESTIMATES
QUANTITY
ESTIMATES
Primary estimation
PRODUCTIVITY
ESTIMATES
BILL OF MATERIALS
List of materials
VALUE ENGINEERING a review of the plan and design of a project so as to coordinate with the sizes and
specifications of construction materials. Its aim is to avoid wastage and maximize
the use of each material
DETAILED ESTIMATE estimate that breaks the subject down into as many items or components
possible. Each component are often described with specifications
ROUGH ESTIMATE
LUMP SUM
OPEN
SPECIFICATIONS
CLOSED
SPECIFICATIONS
establishes the exact and specific quantity, types, color, texture, and other
properties. Such can not be changed or subjected to equivalencies without prior
concent from the specs writter or the architect
BRAND NAME
SPECIFICATIONS
COMBINATION
SPECIFICATION
GROUP 1
Simplest Utilization
Character
6 percent
GROUP 2
Moderate Complexity
7 percent
GROUP 3
Aquariums, Auditoriums, Airports, Hospitals, Observatories,
Exceptional Complexity Gymnasiums, Hotels, Laboratories, Mental Institutions,
Mortuaries
8 percent
GROUP 4
Residences
10 percent
GROUP 5
Monumental Buildings
12 percent
GROUP 6
First Structure ---------------------------------------------------------------- Minimum Basic
Repetitive Construction --------------------------------------------------------Fee
of Buildings
Second Structure ----------------------------------------------------------80% of Basic
----------------------------------------------------------Fee
Third Structure--------------------------------------------------------------60% of Basic
---------------------------------------------------------Fee
Succeding Structure-------------------------------------------------------40% of Basic
----------------------------------------------------------Fee
GROUP 7
Housing Project
First Unit----------------------------------------------------------------------10% of
-------------------------------------------------------Construction
2 10 units-------------------------------------------------------------------Cost
--------------------------------------------------------1 unit plus 60%
11 units and above---------------------------------------------------------10 units plus
---------------------------------------------------------30%
GROUP 8
Extensive Detail
GROUP 9
50 150% of
basic fee
GROUP 10
Technical advice
200php / hour
500php /
appearance
15% of Project
Construction
Cost
PAYMENT SCHEDULE
5%
15%
35%
85%
Remaining 15%
10%-------------------------- Architects Liabilty under civil code
--------------------Construction phase services
5%-----------------------------------------------MINIMUM BASIC FEE
5 SETS
2 COPIES
Project Construction
Cost
----does not include
ARCHITECTS FEE or
ENGINEERS FEE or
the SALARIES of
INSPECTORS
----Project
Classification----
Includes normal:
Structural
Electrical,
Plumbing/Sanitary
Mechanical Engineering Services
----Components of
Master Development
Plan----
Physical Plan
Transportation and Utilities System
Economic Component
Socio-Cultural Componant
Legal Administrative
Direct Selection
Comparative Selection
Architectural Design Competition
----percentage of
construction cost-------multiple of direct
personal expense-------lump sum or fixed
fee----
COMPETITION CODE
OWNER
ARCHITECT
Selection of
Consultants
Selection of
Consultants
Feasibilty
Marketing
Feasibility
Financial
Feasibility
Technical
Feasibility Socio
Economic
Estimates
Topographic Survey
Clearances
Approval of
Contract
Documents
Specifications
Preliminary
Estimates
Construction
Documents
Procurement
Specifications
GEN.
CONTRACTOR
CONSTRUCTION
SUPERVISOR
GROUP
CONSTRUCTION
MANAGER
Preliminary
Estimates
Procurement
Specifications
Selection of
Selection of General
Construction
Contractor
Manager
Preparation of Bids
Selection of General
Documents
Contractor
Distribution of Bids
Selection of Bids
Documents
Distribution of Bids
Documents
Part Time
inspector
Full time
inspection
Secure Building
Review Schedule of
Permit
Construction
Payment of Building
Permit
Approve Schedule
of Construction
Full time
inspection
Secure Building
Secure Building
Permit
Permit
Payment of Building Review Schedule of
Permit
Construction
Schedule of
Construction
Keeping of Records Keeping of Records
(Time Records,
(Time Records,
Logbook, contract
Logbook, contract
documents, minutes documents, minutes
etc))
etc)
Certificate of
Payment
Billing
Evaluation of
Change Order
Evaluation of
Change Order
Resolution of
Conflict
Cost Control
Approval of Shop
Drawing
Approval of
FInishes
Payment
Preparation of Shop
Drawing
Quality Control
Coordination Works
Final Inspection
Correction
Measures
Quality Control
Quality Control
Coordination Works
Agreement
General Conditions
Special Provisions
Specifications
Drawings
Project
Representative
Contractor
Sub-contractor
Surety
Proposal
Proposal Bond
Performance Bond
approved form of security furnished by the contractor and his surety to execute
the work
Payment bond
approved form of security furnished by the contractor and his surety to pay all
obligations
Guaranteed Bond
approved form of security furnished by the contractor and his surety to the
quality of materials and equipments and workmanship
Agreement
Advertisement or
Invitation to Bid
Bid Bulletin
Instruction to Bidders List of Instructions stipulating the manner on how bids are to be prepared
Drawings
General Conditions
Special Provisions
Specifications
Supplementary
Specifications
Schedule of Material
and Finishes
Breakdown of work
and corresponding
value
Written Notice
Time Limits
Local Laws
Work
Furnish
Install
Provide
Required or
Necessary
Singular or Plural
Quintuplicate
Specifications
Detailed
Specifications
7 days
10 days
Contract
Time
Reckonin
g
(from
receipt of
notice to
proceed)
Beginning,
Suspending or
Resuming of work
(written notice to
the architect,
except in case of
accident)
15 days
Request for time
Extension
(from occurrence of
Delay)
5 days
Repair
and
Correctio
n Work
(at the
Contract Sum
expense
Breakdown
of
(from reciept of notice) contracto
Request for supply
r after
of Owner
Claim for extra cost
written
furnished
(to be given to
notice of
1 year
materials
architect, delay due to owner)
owners fault)
Contracto (Written request
prior to when its
rs
Architects action on
Guarante needed)
Payment Request
e Bond
(furnishe Correction Before (after receipt of of
final paymet
request for payment)
d to
(Contractor to
owner
remove
Owners action on
after
performa condemned work payment request
(from date of
nce and within 10 days)
architects approval on
payment
Correction Before payment request
bond
andtake final paymet
Contractor may
effect for (Contractor must
pay expenses of
terminate and suspend
a year)
condemned work work
within 10 days)
(after notice to owner
and architect)
Correction Before (after architect fails to
final paymet
act on request for
(Owner may sell
payment)
30 days
Release
of
retention
(after
date of
final
payment
)
90 days
Contract
or may
suspend
work
(if any
court /
public
authority
suspend
Owner to work for
pay
90 days)
contracto
r after
award by
arbitrator
s)
(Contract
or may
terminat
e and
suspend
work
upon 15
days)
1 week
2 weeks
Subcontracto
rs claim
for extra
cost
(claim to
the
contracto
r)
Request
for
drawings
(claim for
delay
only after
2 weeks)
Contract
Time
Reckonin
g
(from
receipt of
notice to
proceed)
1 year
Contracto
rs
Guarante
e Bond
(furnishe
d to
owner
after
performa
nce and
payment
bond
andtake
effect for
a year)
Release
of
retention
(after
date of
final
payment
)
Contract
or may
suspend
work
(if any
court /
public
authority
suspend
Owner to work for
pay
90 days)
contracto
r after
award by
arbitrator
s)
(Contract
or may
terminat
e and
suspend
work
upon 15
days)
Subcontracto
rs claim
for extra
cost
(claim to
the
contracto
r)
REPUBLIC ACTS
RA 9514
RA 9266
RA 9053
RA 8981
RA 8534
RA 8495
RA 8293
RA 9283
Copyright Law
RA 7279
RA 7277
RA 7160
RA 6541
RA 4726
Condominium Act
RA 4566
RA 1582
RA 1378
RA 1364
RA 545
RA 544
RA 386
RA 9161
RA 8763
Request
for
drawings
(claim for
delay
only after
2 weeks)
RA 8368
RA 496
PD 49
PD 223
PD 233
PD 757
PD 856
PD 933
PD 957
PD 1067
Water Code
PD 1096
PD 1151
PD 1185
PD 1216
PD 1267
Creating NHMFC
PD 1308
PD 1530
PD 1594
PD 1616
PD 1752
BATAS PAMBANSA
BP 220
BP 344
Accessibility Law
Batas Pambansa 220 and PD 957
10 Meters
3 meters
2 meters
3 meters 60 meters
max length
Path walk
6.5 meters
400M
250mm x 250mm
300mm
Firewall extension
6M
2M
560mm
TYPE OF HOUSING
ECONOMIC
(sq.m)
SOCIALIZED
(sq.m)
PD 957 open
market (sq.m)
PD 957 medium
cost (sq.m)
Single Detached
72
64
120
100
Duplex/Single
Attached
54
48
96
80
Row House
36
28
60
50
ECONOMIC
(sq.m)
SOCIALIZED
(sq.m)
PD 957 open
market (sq.m)
PD 957 medium
cost (sq.m)
22
18
42
30
RA 9514
Abatement
Blasting Agent
Cellulose Nitrate
Cellulose Nitrate
Plastic (Pyroxylin)
Curtain Board
Cryogenic
Descriptive of any material which by its nature or as a result of its reaction with
other elements produces a rapid drop in temperature of the immediate
surroundings
Damper
Normally open device installed inside an air duct system which automatically
closes to restrict the passage of smoke or fire
Distillation
The process of first raising the temperature in separate the more volatile from the
less volatile parts and then cooling and condensing the resulting vapor so as to
produce a nearly purified substance
Duct System
Dust
Finely powdered substance which, when mixed with air in the proper proportion
and ignited will cause an explosion
Electrical Arc
Ember
A hot piece or lump that remains after a material has partially burned, and is still
oxidizing without the manifestation of flames
Finishes
Fire
The active principle of burning, characterized by the heat and light of combustion
Fire Trap
A building unsafe in case of fire because it will burn easily or because it lacks
adequate exits or fire escapes
Fire Alarm
Fire Door
A fire resistive door prescribed for openings in fire separation walls or partitions
Fire Hazard
Any condition or act which increases or may cause an increase inthe probability of
the occurrence of fire, or which may obstruct, delay, hinder or interfere with fire
fighting operations and thesafeguarding of life and property
Fire Lane
The portion of a roadway or public way that should be kept opened and
unobstructed at all times for the expedient operation of firefighting units
device intended for the protection of buildings or persons to include but not limited
to built-in protection system such as sprinklers and other automatic extinguishing
system
Flash Point
The minimum temperature at which any material gives off vapor in sufficient
concentration to form an ignitable mixture with air
Forcing
Fulminate
Horizontal Exit
Hose Box
A box or cabinet where fire hoses, valves and other equipment are stored and
arranged for fire fighting
Hose Reel
A cylindrical device turning on an axis around which a fire hose is wound and
connected
Hypergolic Fuel
Jumper
Overloading
The use of one or more electrical appliances or devices which draw or consume
electrical current beyond the designed capacity of the existing electrical system
Public Assembly
Building
Any building or structure where fifty (50) or more people congregate, gather, or
assemble for any purpose
Self-closing Door
Automatic closing doors that are designed to confine smoke and heat and delay
the spread of fire
Smelting
Sprinkler System
Standpipe System
Dry Standpipe
Standpipes are not filled with water; 102mm equipped with four way
connection
Wet Standpipe
Vestibule
A passage hall or antechamber between the outer doors and the interior parts of a
house or building
Vertical Shaft
An enclosed vertical space of passage that extends from floor to floor, as well as
from the base to the top of the building
Class A
Class B
Class C
Class D
Class K
MEANS of EGRESS
Panic Hardware
0.71M
8 -10%
Class A Ramp
10 -17%
Class B Ramp
46M
61M