Sei sulla pagina 1di 4

Project Name :

Project No :
Engineer :
Date :
Client Order No :
Contract No :

White Nile
E3979
Jafta Blennis

DOC NO.

Draft

CONSOLIDATED POWER PROJECTS


PROTECTION & AUTOMATION
DOC NO.

Draft

REV

SUBJECT

WRITTEN

FACTORY ACCEPTANCE TESTING


CHECK SHEET

Project Name :

White Nile

REVIEWED

DATE 19/07/2006
D MEYER
A.RICHELMANN

APPROVED

Project No :

Client Order No :
Engineer :

E3979

Contract No :
Jafta Blennis

Date :

Factory Acceptance Secondary Testing


Description

Yes

Continuity testing of schemes

Relay specific logics uploaded on to the Relays as per designs

Relay specific logics tested to be correct as per designs

Functional testing of schemes as per design

Settings received and implemented

Secondary injection of Relays

SCADA - Gateway tested

SCADA - HMI set up and tested

GOOSE connections functional

No

N/A

Scheme Specific Deviations


Description

Project Engineer Signature

04/27/2016

FAT Engineer Signature

Page 3 of 4

CONSOLIDATED POWER PROJECTS


PROTECTION & AUTOMATION
DOC NO.

Draft

REV

SUBJECT

WRITTEN

FACTORY ACCEPTANCE TESTING


CHECK SHEET

Project Name :

White Nile

Client Order No :
Engineer :

REVIEWED

DATE 19/07/2006
D MEYER
A.RICHELMANN

APPROVED

Project No :

E3979

Contract No :
Jafta Blennis

Date :

Scheme Specific Deviations


Description

Project Engineer Signature

04/27/2016

PM / DE

FE

FAT Engineer Signature

Page 4 of 4