Sei sulla pagina 1di 2

PROBLEM & RESOLUTION

Problems

Resolution
To flush water at level 2 plumbing riser for 10 min.
To change GI piping to copper.
To upgrade existing filtration system to new fully automatic back wash
media filtration system.

Action
Night shift Main Exe

Bathtub Stopper.

To change bathtub controller software items.

Mustaffa and Ibrahim

Shower head, Flushing System & Tap

To service every 6 month the shower

Mustaffa and Ibrahim

Bathtub

On going for bathtub silicon

Mustaffa,Din & Wahab

Deluxe wing bathroom

Extra light fitting in the bathroom

Razali,Wan and Razak

Noise sound

To check all window gasket.

Mustaffa and Din

Hot water and cold water.

Every shift Maint Exe need to check the heat machine


twice

Maint Executive

Air conditioner

To check all room F.C.U two way valve and thermostat setting.

Hassan & Fadhil

Wear and tear of room and bathroom

Time for refurbishment for superior wing rooms

San Amalan, Kumar L &


Rahman

Inadequate lighting

Extra lighting point on top of writing table

San Amalan, Kumar L &


Rahman

Hotel condition

External wall need to paint and wall crack need to redo

San Amalan, Kumar L &


Rahman

Superior car lift

Need to upgrade the existing lift due to 23 years old.

San Amalan, Kumar L &


Rahman

Water dirty.

San Amalan, Kumar L &


Rahman

Deluxe wing PRE A.H.U

Need to fix damper control at uncompleted floor to improve the


completed rooms air flow.

San Amalan, Kumar L &


Rahman

Swimming pool

Rectify work for piping pressure test was done and found out the
underground water piping leaking, wastage of water approximate
RM4,000.00 per month. CAPEX raised and sent to FHH a year ago. Still San Amalan, Kumar L &
no reply.
Rahman

Potrebbero piacerti anche