Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Item
Descripcin
Und.
1
1.1
EXPEDIENTE TECNICO
INGENIERIA DEL PROYECTO
glb
2
2.1
2.1.1
2.1.2
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
2.3.7
2.3.8
2.4
2.4.1
2.4.2
2.5
2.5.1
2.5.2
2.5.3
2.5.4
2.5.5
2.5.6
2.6
2.6.1
2.7
2.7.1
2.7.2
2.8
2.8.1
Metrado
Precio
Unitario
(S/.)
Precio
Parcial
(S/.)
Sub Total
(S/.)
70,742.46
3
RESERVORIO ELEVADO V=250m3
3.1
OBRAS PROVISIONALES
3.1.1
CARTEL DE OBRA 3.60m x 2.70m
3.2
TRABAJOS PRELIMINARES
3.2.1
LIMPIEZA MANUAL DE TERRENO
3.3
MOVIMIENTO DE TIERRAS
3.3.1
EXCAVACION MASIVA EN TERRENO NORMAL C/EQUIPO
3.3.2
REFINE, NIVELACION DE FONDOS TERRENO NORMAL
3.3.3
RELLENO COMPACTADO C/MATERIAL PROPIO C/EQUIPO
3.3.4
RELLENO COMPACTADO C/MATERIAL DE PRESTAMO
3.3.5
ELIMIN. DESMONTE, CARG. Y VOLQ. 10M3 TERRENO NORMAL (R=5Km)
3.4
OBRAS DE CONCRETO SIMPLE
3.4.1
CONCRETO F'C=100 KG/CM2 P/SOLADOS
3.5
OBRAS DE CONCRETO ARMADO
3.5.1
CONCRETO F'C=280 KG/CM2 P/LOSA CIMENTACION
3.6
REVOQUES ENLUCIDOS Y MOLDURAS
3.6.1
TARRAJEO EN INTERIORES Y EXTERIORES
3.7
PISOS Y PAVIMENTOS
3.7.1
PISO DE CEMENTO PULIDO Y BRUADO
3.8
CARPINTERIA DE MADERA
3.8.1
ENCOFRADO Y DESENCOFRADO
3.9
INSTALACIONES ELECTRICAS
3.9.1
INSTALACION DE SISTEMA ELECTRICO EXTERIOR
3.10
ACCESORIOS
3.10.1
ACCESORIOS P/RESERVORIO
1.00
70,742.46
70,742.46
4,252,191.21
und
glb
2.00
1.00
900.00
8,640.34
glb
glb
m
m
1.00
1.00
6,994.54
6,994.54
867.72
9,600.00
0.83
1.00
m
m
m
m
m
m
m
m3
20,877.15
2,319.47
20,877.15
2,319.47
23,196.62
23,196.62
23,196.62
709.68
3.89
8.76
0.82
0.94
2.91
9.67
8.67
36.88
m
m
209,068.97
84,129.97
5.15
3.46
und
und
und
und
und
und
834.00
416.00
2,494.00
1,247.33
1,662.00
1,662.00
10.33
10.33
10.33
12.33
12.33
18.33
m3
1,619.20
13.26
m
und
63303
10550
0.94
188.82
und
32
1022.13
10,440.34
1,800.00
8,640.34
23,267.72
867.72
9,600.00
5,805.46
6,994.54
639,931.37
81,212.11
20,318.58
17,119.26
2,180.30
67,502.17
224,311.33
201,114.71
26,172.91
1,367,794.89
1,076,705.21
291,089.68
105,012.04
8,615.22
4,297.28
25,763.02
15,379.60
20,492.46
30,464.46
21,470.58
21,470.58
2,051,665.36
59,614.36
1,992,051.00
32,708.00
32,708.00
459,139.17
und
1.00
600.00
m2
74.69
8.70
m3
m2
m3
m3
m3
322.53
97.74
215.68
39.86
133.55
23.94
1.86
25.05
25.05
11.71
m3
31.34
197.97
m3
810.55
507.73
m2
438.67
18.68
m2
25.00
28.27
m2
39.73
72.38
GLB
1.00
775.89
GLB
1.00
13,024.01
4
4.1
4.1.1
4.2
4.2.1
5
5.1
CAPACITACIONES
TALLERES Y CHARLAS INFORMATIVAS
600.00
600.00
649.84
649.84
15,868.36
7,721.27
181.79
5,402.89
998.53
1,563.88
6,204.23
6,204.23
411,540.06
411,540.06
8,194.30
8,194.30
706.64
706.64
2,875.74
2,875.74
775.89
775.89
13,024.01
13,024.01
22,465.58
520.77
27.96
179.37
44.07
14,560.64
14,560.64
7,904.94
7,904.94
8.00
2,750.00
22,000.00
22,000.00
GLB
COSTO DIRECTO
4,755,795.96