Sei sulla pagina 1di 10

CALCULO DE ARMADURA DE RESERVORIO

DATOS

PROYECTO

"INSTALACION DE SISTEMA DE AGUA


POTABLEY DISPOSICION DE EXCRETAS
DELALOCALIDAD DE CATUYO GRANDE, DEL
DISTRITO DE SAN ANTON - AZANGARO PUNO"

ACERO MUROS

EXPEDIENTESan Anton
ZONAL
PUNO

ACERO VERTICAL

= 3/8

Pulg.

DIAMETRO
AREA

= 0.953
= 0.713

Cms.
Cms2.

FECHA

PESO

CARACTERISTICAS GEOMETRICAS
VOLUMEN RESERVORIO

###

m3

ALTURA UTIL RESERVORI

1.35

mts.

LADO UTIL RESERVORIO

2.75

mts.

200 Kg/m2

ACERO fy

### Kg/cm2

RESISTENCIA DEL SUELO


COEF. SISMICO

=
=

1.00 Kg/cm2
0.12

RECUBRIMIENTO r =
fs

=
=

4.00 Cm
### Kg/cm2

fc

94.5 Kg/cm2

###

Kg/ml
Pulg.
Cms.

AREA

= 0.713

Cms2.

PESO

= 0.560

Kg/ml

ACERO LOSA DE TECHO

ESPECIFICACIONES
CONCRETO f'c
=
210 Kg/cm2
SOBRECARGA EN LOSA

= 0.560

ACERO HORIZONTA= 3/8


DIAMETRO
= 0.953

ACERO HORIZONTA= 3/8

Pulg.

DIAMETRO
AREA

= 0.953
= 0.713

Cms.
Cms2.

PESO

= 0.560

Kg/ml

ACERO LOSA DE FONDO


ACERO HORIZONTA= 3/8
DIAMETRO
= 0.953

Pulg.
Cms.

AREA

= 0.713

Cms2.

PESO

= 0.560

Kg/ml

0.15

1.38

1.73
1.73

Sc
SL
A'

Wc
###

B'
###
WL

NIVEL DE AGUA

S1
###
Ea
###

###

W1

0.5

###

Wa
A

B
S2

###

###
C

W2
0.28
0.87
1.04

CALCULOS
W1= Pc x V1

594.00 Kg

W2 = Pc x V2

830.40 Kg

Wa = Pa x Va
WL = Pc x VL

1863.00 Kg
367.20 Kg
306.00 Kg

Ws = Sc x A
S1 = 0,12 x W1
S2 = 0,12 x W2
SL = 0,12 x WL

106.92 Kg
149.47 Kg
66.10 Kg

Ss = 0,12 x Ws

66.10 Kg

Ea = 1,12 x 0,5 x Pa x H12

### Kg

VERIFICACION DEL ESFUERZO CORTANTE EN LA BASE AB


V = Fh / A

1.18 Kg/cm2

Vc = 0,29 ( f'c )^1/2

4.20 Kg/cm2
V=

1.18

Kg/cm2

<

Vc =

4.20

Kg/c BIEN !!

CALCULO DE LA ARMADURA
ACERO VERTICAL CARA B'-B
MOMENTO MAXIMO EN LA BASE A-B
Mu
d = t1 - r - D/2

1005.15 Kg-mts.
10.52 Cms.

AREA DE ACERO
As1 =
86.85 Cms2
As2 =
2.60 Cms2

SE ASUME :

0.002

CUANTIA = As / t1 x b
CUANTIA MINIMA POR FLEX 0.001
USAR :

2.60 Cms2

3/8

<

###

BIEN!!

0.27 mts.

ACERO HORIZONTAL B'B


ASUMIR CUANTIA MINIMA PARA EL ACERO HORIZONTAL, CONSIDERANDO P = 0,0018
As = P x b x t1
USAR :

2.70 Cms2

3/8

0.26 mts.

ACERO EN LA ZAPATA
ASUMIR EL AREA DE ACERO HALLADA PARA LA BASE DE MURO
USAR :

3/8

0.27 mts.

ACERO EN LA LOSA DE FONDO


P1

3370.9

P2
P3
P4

5452.92
4918.32
8619.55

P5

###

LUEGO:

WuD :
WuL :

4035.56
360.00

Wu : 4395.56

CALCULO DEL MOMENTO ULTIMO


2111.42 Kg--mts

Mu = 0,0513 * Wu * L2

d = t1 - r - D/2

15.52 Cms.

AREA DE ACERO
As1 = 128.25 Cms2
As2 =
3.70 Cms2

SE ASUME :

0.0019

CUANTIA = As / t1 x b
CUANTIA MINIMA POR FLEX 0.001
USAR :

3.70 Cms2

3/8

<

0.0019

BIEN!!

0.19 mts.

ACERO EN LA LOSA DE TECHO


WuD = 2400 * t1 * 1,5

360

WuL = SC * 1,8

360
Wu =

720

CALCULO DEL MOMENTO ULTIMO


Mu = 0,0479 * Wu * L2
d = t1 - r - D/2

262.72 Kg--mts
5.72 Cms.

AREA DE ACERO
As1 =
47.37 Cms2
As2 =
1.25 Cms2

SE ASUME :

1.25 Cms2

0.0012

CUANTIA = As / t1 x b

CUANTIA MINIMA POR FLEX 0.001

<

0.0012

BIEN!!
Cms2

USAR :

3/8

0.20 mts

TAPA SANITARIA METALICA

3/8

0.20

TUBERIA DE VENTILACION FG 2"

0,60 x 0,60 mts.

0.10

0.30
NIVEL DE AGUA

3/8

0.27

3/8

0.26

3/8

0.27

3/8

TARRAJEO C / IMPERMEABILIZANTE

1.65

1.35

3/8

0.19

PENDIENTE DE FONDO 1%

0.27

0.20

0.075

0.92

0.20

0.15

SOLADO DE CONCRETO

2.75

0.15

0.20

RESERVORIO APOYADO 10 M3
CORTE A-A
Apr-16

VOLUMEN

ALTURA

LADO INTER

3.00
4.00

1.25
1.25

1.55
1.80

5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
55.00
56.00
57.00
58.00
59.00

1.25
1.25
1.25
1.30
1.30
1.35
1.40
1.45
1.50
1.55
1.55
1.60
1.65
1.65
1.70
1.70
1.75
1.75
1.80
1.85
1.85
1.85
1.90
1.90
1.95
1.95
2.00
2.00
2.05
2.05
2.05
2.10
2.10
2.15
2.15
2.15
2.20
2.20
2.20
2.25
2.25
2.25
2.30
2.30
2.30
2.35
2.35
2.45
2.40
2.40
2.40
2.40
2.45
2.45
2.55

2.00
2.20
2.40
2.50
2.65
2.75
2.85
2.90
2.95
3.05
3.15
3.20
3.25
3.35
3.35
3.45
3.50
3.55
3.60
3.65
3.70
3.75
3.80
3.85
3.90
3.95
3.95
4.00
4.05
4.10
4.15
4.15
4.20
4.25
4.30
4.35
4.35
4.40
4.45
4.45
4.50
4.55
4.55
4.60
4.65
4.65
4.70
4.65
4.70
4.75
4.80
4.85
4.85
4.90
4.85

VOLUMEN ASUMIDO

10.00 M3
ALTURA

LADO

1.35

2.75

60.00

2.45

4.95

Potrebbero piacerti anche