The document outlines 5 PLC ladder programs:
1) Implement logic gates using a PLC ladder diagram.
2) Design an alarm system with multiple inputs that triggers lights and sirens.
3) Create a process with 3 mixers that start at timed intervals and run until a master switch is off.
4) Design a ladder program where a light turns on at a count of 23 and off at 31.
5) Make a program for a conveyor that indicates status using lights for counts less than, equal to, and greater than 45 parts.
The document outlines 5 PLC ladder programs:
1) Implement logic gates using a PLC ladder diagram.
2) Design an alarm system with multiple inputs that triggers lights and sirens.
3) Create a process with 3 mixers that start at timed intervals and run until a master switch is off.
4) Design a ladder program where a light turns on at a count of 23 and off at 31.
5) Make a program for a conveyor that indicates status using lights for counts less than, equal to, and greater than 45 parts.
The document outlines 5 PLC ladder programs:
1) Implement logic gates using a PLC ladder diagram.
2) Design an alarm system with multiple inputs that triggers lights and sirens.
3) Create a process with 3 mixers that start at timed intervals and run until a master switch is off.
4) Design a ladder program where a light turns on at a count of 23 and off at 31.
5) Make a program for a conveyor that indicates status using lights for counts less than, equal to, and greater than 45 parts.
Using PLC ladder diagram realize the following logic gates.
AND, OR, NOT, NAND, NOR, EX-OR PLC Ladder Program 2: Design a PLC ladder diagram to construct an alarm system which operates as follows . If one input is ON nothing happens . If any two inputs are ON, a red light goes ON . If any three inputs are ON, an alarm sirens sound . If all are ON, the fire department is notified PLC Ladder Program 3: There are 3 mixing devices on a processing line A, B, C. After the process begin mixer-A is to start after 7 seconds elapse, next mixer-B is to start 3.6 second after A. Mixer-C is to start 5 seconds after B. All then remain ON until a master enable switch is turned off. Write PLC ladder diagram and realize the same. PLC Ladder Program 4: An indicating light is to go ON when a count reaches 23.The light is then go off when a count of 31 is reached. Write PLC ladder diagram and realize the same. PLC Ladder Program 4: A conveyor is supposed to have exactly 45 parts on it. You have three indicating lights to indicate the conveyor count status: less than 45, yellow: exactly 45, green: and more than 45, red. The count of parts on the conveyor is set at 45 each morning by an actual count of parts. There are two sensors on the conveyor, one is actuated by parts entering the conveyor, and the other is actuated by parts leaving. Design a PLC program to carry out this process.