Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SYMPOSIUM 2005
MONTREAL, QUEBEC
CANADA
SEPTEMBER 27-29, 2005
Gary Souza
Chief Project Engineer
Model 250
Helicopters & Small Gas Turbines
Rolls-Royce Corporation
Fleet
Composition
and Service
Hours
Engine not
Involved
Safety
Events
Engine
Involved
Cause
Reduction
(Effect of Mitigating
Actions)
Event
Severity
Historical
Rates
Cause
Analysis
Component &
Mode Safety
Assessments
Event
Analysis
Percentage of Total
Human Factors
Weather
Mechanical
Wirestrike
Source: HAI Accident Summary
3% 1%
Event Break-down of
1561 Events in Study
Period
No EI / Not Established
6%
4%
EI Potential Hazard
EI Incident
EI Accident - No Injury
EI Accident - Injury
EI Accident - Fatalities
81%
30
25
20
EI Incident & Accidents
15
EI Accidents
EI Accidents with Fatalities
10
5
l
Al
8
T6
3
C2
0
C2
8
C3
0/
S
C3
0P
C3
0
C3 R
0R
/3
C4
0
C4
7
C1
B1
23%
Engine Systemic
(basic)
Unknown
4%
10%
Fatigue Bearing #3
ECU Capacitor
Failure
Misalignment
Sulphidation Turbine
Wear
Fatigue
OvertemperatureTurbine
Oil Starvation/Contam
Loose B Nuts
Corrosion Comp
Blockage/FOD/Ingestion
Fuel Contamination
9.00%
8.00%
7.00%
6.00%
5.00%
4.00%
3.00%
2.00%
1.00%
0.00%
FUEL CONTAMINATION
Failure to Properly Maintain and Inspect
Fuel System Results In:
FUEL CONTAMINATION
Fuel system contamination with the use of Jet A
fuel and anti-icing inhibitor, Diethylene Glycol
Monomethyl Ether (DIEGME).
FUEL CONTAMINATION
FUEL SYSTEM CONTAMINATION WITH DIEGME
FUEL CONTAMINATION
FUEL STORAGE TANK CONTAMINATION WITH DIEGME
(Apple Jelly)
FUEL CONTAMINATION
FUEL SYSTEM CONTAMINATION CAN RESULT IN
RESTRICTED FUEL FLOW, CAUSING:
FUEL CONTAMINATION
CLEAN FUEL
NOZZLE INLET
SCREEN
DIRTY FUEL
NOZZLE INLET
SCREEN
Nozzle Separated for Cleaning
FUEL CONTAMINATION
Collapsed contaminated screen resulting in loss
of power in-flight
COMPRESSOR
EROSION & CORROSION
Failure to Inspect Compressor Cases
and Blades Regularly for Erosion and/or
Corrosion Results In:
COMPRESSOR
FAILURE
EXPOSED VANE
BAND IS NOT
ACCEPTABLE
NOTE EROSION
UNDERCUT
NEAR VANE
ROOT AT
PLASTIC LINE
NOTE PITS AT
ROOT AREA OF
BLADE
CRACK
FORMING ON
LEADING EDGE
NEAR ROOT
FROM
CORROSION
PIT
03FA8-113
98FA8-026
250-C40 CSL-5017
250-C20 CSL-1135
250-C47 CSL-6004
250-C28 CSL-2082
250-C30 CSL-3085
250-C20R CSL-4018
REQUIRES OPERATORS WHO DO NOT USE DEMINERALIZED WATER OR ARE UNSURE OF LEVEL OF
MINERAL CONTENT OF WATER USED FOR COMPRESSOR
RINSE / WASH TO PERFORM 600 HR INSPECTION OF THE
1ST STAGE TURBINE BLADES
SUMMARY
THANK YOU!
QUESTIONS?