Sei sulla pagina 1di 1

ACCOMPLISHED PEMAPS QUESTIONNAIRE

Project Name
Project Location
Proponent
Pollution Control Officer
Tel. No./Fax No./E-mail

:
:
:
:
:

Project Type
Project Status

:
:

I. PROJECT CONSIDERATIONS
Size and Type
Size based on number of employees
Specify number of employees:

(Specify number of employees)

Type
ECP (in either ECA or non-ECA)
Non-ECP but in ECA
Non-ECP and Non-ECA

__________
__________
__________

Waste Generation and Management


Enumerate Waste Type and Specify Quantity of Wastes generated in your facility. (Identify/Enumerate)
Category
Air

Liquid

Solid

Waste

Type
Hazardous

Waste 1
Waste 2
Waste 3
Wastewater
Waste 2
Waste 3
Sludge
Waste 2
Waste 3

Non-Hazardous

Quantity
(units: MT/yr)
(units: m3/yr)

Pollution Control System (PCS)


Enumerate PCS or Waste Management Method Used in your facility
(Identify/enumerate)
Category
Air

Liquid

Solid

PCS/Waste Management Method Used


PCS 1
PCS 2
PCS 3
Primary
Secondary
Tertiary

Remarks

Potrebbero piacerti anche