Item Description

No.

Unit

Qty

Rate
Ushs

Amount
Ushs

BILL No. 2
ELEMENT NO. 1
SUBSTRUCTURE ( ALL PROVISIONAL )
Site Preparation
A Allow for general site preparations and final levelling of site

ITEM

2,000,000

2,000,000

Excavation :
B

Excavate for bases & strip footings: commencing from stripped levels
not exceeding 1.5m deep

CM

136

5,000

680,000

Extra over excavation for excavating in hard rock

CM

10,000

10,000

D Ditto in soft rock

CM

8,000

8,000

SM

5,000

5,000

CM

78

4,000

312,000

CM

58

3,000

174,000

ITEM

250,000

250,000

ITEM

250,000

250,000

1,000

751,000

Trim surface of rock to receive concrete blinding


Disposal of excavated material : (Provisional)

Backfill selected excavated material fill around foundations : water


and compact in layers not exceeding 200mm thick to 95% MDD

G Remove surplus excavated material from site


Planking and strutting
H Planking, strutting and shoring to sides of all excavations : keep
excavations free from all fallen materials
Disposal of water:
I

Allow for keeping the whole of the excavation free from general water.

Chemical anti-termite treatment to subsoil or filling : Dragnet 38%


E.C. or equal and approved : provide a ten year guarantee

Anti-termite treatment:
SM

TO COLLECTION

751

4,440,000

Element No. 1
Substructure

3/1/1