BILL No. 2
ELEMENT NO. 1
SUBSTRUCTURE ( ALL PROVISIONAL )
Site Preparation
A Allow for general site preparations and final levelling of site
ITEM
2,000,000
2,000,000
Excavation :
B
Excavate for bases & strip footings: commencing from stripped levels
not exceeding 1.5m deep
CM
136
5,000
680,000
CM
10,000
10,000
CM
8,000
8,000
SM
5,000
5,000
CM
78
4,000
312,000
CM
58
3,000
174,000
ITEM
250,000
250,000
ITEM
250,000
250,000
1,000
751,000
Allow for keeping the whole of the excavation free from general water.
Anti-termite treatment:
SM
TO COLLECTION
751
4,440,000
Element No. 1
Substructure
3/1/1