Sei sulla pagina 1di 3
Republie of the Philippines Department of Education Region X DIVISION OF MISAMIS OCCIDENTAL Oroguieta City Email-add: deped_misoce@vahoo.com Fax No.: (088) 531-1145 Tel, No.: (088) 531-1872/531-0067 June 17, 2015 DIVISION MEMORANDUM No._132 _s.2015 STANDARD DESIGN & A PROGRAM OF WORK OF A. FABRICATED COT BED TO Public Schools District Supervisors Secondary School Principals/Head Teachers/TICs Elementary School Principals/Head Teachers This Division 1. In preparation for the hosting of the 2015 Palarong Pampook (Northern Mindanao Regional Athletics Association Meet) which is tentatively scheduled on December 2015, please find enclosed a design and a copy of the program of work of a cot bed which is one of the requirements of the Billeting Committee for your reference. 2. To determine the required number of cot beds per school, please use the following formula "CONSTANT NO. 75 DIVIDED BY THE NUMBER OF TEACHERS IN THE DISTRICT TIMES NUMBER OF TEACHERS IN THE SCHOOL EQUALS COT BEDS REQUIREMENT PER SCHOOL" EXAMPLE: Given = 75 No of Teachers in the District No of Teachers in the Schoo 75 ~ 100 = .75 X 10 =7.5 cot beds or 8 cot beds 3. Expenses incurred in the fabrication of cot beds is chargeable against school MOOE. Local School Board and others sources of funds subject to the usual accounting and auditing rules and regulations. 4. Immediate and wide dissemination of this Memorandum is hereby desired. INATHAM'S, DELA PENA, CESO VI ‘Schgolé Division Superintendent Encl As stated To be indicated in the perpetual Index Under the following subjects SPORTS PROGRAM COMMITTEE iat Pst Water-trot Sheeting | Yy # At Prasic Wate Pret Sheeting a 226 lumber | _ 20mmp treaded corisge bots with 2 washer 8 rut by, aa nate ter ] a T | Prepared by ecommeralaAsprova ty: | Approved by: me | | | | | | | | | | B ‘ | | | | onval gey pms, ce, n YAanco ——owarnan sata BENA,ceso vi FABRICATION oF fectr | ov | ig//s000, s2to0s Don Suerte | Republic of the Philippines Department of Education R-x DWSION OF MISANMIS OCCIDENTAL Disteet of. erase: PROJECT: FABRICATION OF 1-SET BEDCOT Sheol DETAILED ESTIMATES pes 11/2%0"s igemeinay | 200] set stressed orage EWAN waters 050) a" cw Lil, TOTAL COST (b+ up Prepared by: ‘School Head/Principal Dinision Engineer i Anocove by

Potrebbero piacerti anche