Sei sulla pagina 1di 37

HIGH RISE BUILDING PROJECT

RACHATEWI RD.,BANGKOK,THAILAND

PH.W.STUDIO
PHATTIYA WANGNIWETKUL
5416680105
DEC 05 , 2014

DRAWING CONTENTS
DWG.
NO.
A-01
A-02
A-03
A-04
A-05
A-06
A-07
A-08
A-09
A-10
A-11
A-12
A-13
A-14
A-15
A-16
A-17
A-18
A-19
A-20
A-21
A-22
A-23
A-24
A-25
A-26
A-27
A-28
A-29
A-30
A-31
A-32
A-33
A-34

SYMBOLS & LEGEND


DWG.
NO.

TITLE
ARCHITECTURAL
DRAWING CONTENTS , OUTLINE SPECIFICATION
SYMBOLS & LEGEND
LOCATION MAP
SITE PLAN
GROUND FLOOR PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
TYPICAL FLOOR PLAN 4,6,8
TYPICAL FLOOR PLAN 5,7,9
ROOF DECK PLAN
ROOF PLAN 1
ROOF PLAN 2
ELEVATION 1
ELEVATION 2,4
ELEVATION 3
SECTION A-A
SECTION B-B
ROOM TYPE DETAIL PLAN
W.C. 1 DETAIL
W.C. 2 DETAIL PLAN
DOORS DETAIL & SCHEDULE 01
DOORS DETAIL & SCHEDULE 02
WINDOWS DETAIL & SCHEDULE 01
WINDOWS DETAIL & SCHEDULE 02
WINDOWS DETAIL & SCHEDULE 03
WINDOWS DETAIL & SCHEDULE 04
WINDOWS DETAIL & SCHEDULE 05
WINDOWS DETAIL & SCHEDULE 06
WINDOWS DETAIL & SCHEDULE 07
ST-01 MAIN STAIRCASE DETAIL PLAN
ST-01 SECTION 1, DETAIL 1-3
ST-02 FIRE ESCAPE DETAIL PLAN
ST-02 SECTION 1 , DETAIL 1-3
ST-03 STAIRCASE DETAIL

PH.W.STUDIO

TITLE

NORTH ARROW

R-01 RAMP DETAIL


T-01 ROOF TRUSS DETAIL & D-01 DETAIL 001

A-35
A-36

ELEVATION
INDICATES DRAWING SHEET NO.A-00
SECTION CUT LINE
SEE DETAIL

OUTLINE SPECIFICATION
FLOOR FINISHING
1
2
3
4
5
6
7
8
9
10
11

WHITE CARRARA

. .
. .

COTTO 24"X24"
SOLUMAT

POSITANO
DYNOFLEX
WM 994
DYNOFLEX
WE 1075
SOLID
MOZART
P11 PINE
COTTO 24"X24" POSITANO
COTTO GLAZED PORCELAIN ECO TOUCH
SM00507

1
2
3
4
5
6
7
8
9

SYMBOLIC OF WALL MATERIAL

C1

SYMBOLIC OF CEILING MATERIAL

D1

SYMBOLIC OF DOOR

W1

SYMBOLIC OF WINDOW
DISTANCE OF CENTER TO CENTER
DISTANCE OF EDGE TO EDGE
DISTANCE OF CENTER TO EDGE

GP 6x36

BOUNDARY LINE
BREAK LINE
BRICK WALL

TOA

CEILING FINISHING

LIGHT WEIGHT WALL

TOA

CONCRETE WALL

TOA

GROUND LEVEL

TOA
COTTO 24"X24" POSITANO
COTTO 32"X32" ARDOISE
GT738647
COTTO 12"X12" THE EDGE
MT2SM
COTTO GLAZED PORCELAIN ECO TOUCH
GP 6x36

POSITION OF WORK
LEVEL
0.00

Date

CENTER LINE OF REFERENCE COLUMN

PARKING

F1

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY

REFERENCE LEVEL

1
2
3

Project Title :

Description

SYMBOLIC OF FLOOR MATERIAL

WALL FINISHING

Issue Amendments :

Reference

F1

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

C1

ROOM NAME
LEVEL OF CEILING
LEVEL OF FLOOR
SYMBOLIC OF FLOOR MATERIAL
Drawing Title :

Project Code : -

Date :

Drawn By :

Scale : -

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

DRAWING CONTENTS
Drawing Number :

A-01

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:1250

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

LOCATION MAP
Drawing Number :

A-02

ENTRANCE
F2 +0.20 -

FOOTPATH
F3 +0.35 C1

POOL
F2 +0.50

GARBAGE ROOM
F1 +0.35 C3

FOOTPATH
F3 +0.35 C3
FIRE ESCAPE
F3 +0.35 C3

M&E
F3 +0.80 C3
UP

F.H.C.

FIRE ESCAPE
F3 +0.35 C3

TRANSFORMER
F3 +0.40 C3

UP

UP
F.H.C.
F.H.C.

HALL
F1 +0.80 C1

FIRE LIFT LOBBY


F3 +0.80 C3

PARKING
F2 +0.20 C3

LOBBY
F1 +0.80 C1

UP

TERRACE
F7 +0.70 -

FOOTPATH
F3 +0.30 C3

W.C.
F4 +0.75 C2

OFFICE
F1 +0.80 C1

F.H.C.

W.C.
F4 +0.75 C2

STORAGE
F4 +0.80 C3

UP

UP

UP

FIRE ESCAPE
F3 +0.35 C3

FIRE ESCAPE
F3 +0.35 C3

GENERATOR
F3 +0.40 C3

ENTRANCE
F3 +0.30 -

WATER PUMP
F3 +0.40 C3

F.H.C.

LOBBY
F1 +0.80 C1

UP

MDB
F3 +0.40 C3

UP

FOOTPATH
F3 +0.35 C3

3/4'GATE VALVE
WATER METER
3/4"CHECK VALVE
3/4'GATE VALVE

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:250

Phattiya Wangniwetkul

DEC 5,2014

Client :

Civil Engineer :

Location :

Project Director :

Interior Designer :

Checked By :

Phattiya Wangniwetkul

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

SITE PLAN
Drawing Number :

A-03

FOOTPATH
F3 +0.35 C1

POOL
F2 +0.50

GARBAGE ROOM
F1 +0.35 C3

FOOTPATH
F3 +0.35 C3
FIRE ESCAPE
F3 +0.35 C3

M&E
F3 +0.80 C3
UP

F.H.C.

FIRE ESCAPE
F3 +0.35 C3

TRANSFORMER
F3 +0.40 C3

UP

UP
F.H.C.
F.H.C.

HALL
F1 +0.80 C1

FIRE LIFT LOBBY


F3 +0.80 C3

PARKING
F2 +0.20 C3

LOBBY
F1 +0.80 C1

UP

TERRACE
F7 +0.70 -

FOOTPATH
F3 +0.30 C3

W.C.
F4 +0.75 C2

OFFICE
F1 +0.80 C1

F.H.C.

W.C.
F4 +0.75 C2

STORAGE
F4 +0.80 C3

UP

UP

UP

FIRE ESCAPE
F3 +0.35 C3

FIRE ESCAPE
F3 +0.35 C3
LOBBY
F1 +0.80 C1

UP

ENTRANCE
F3 +0.30 -

GENERATOR
F3 +0.40 C3

MDB
F3 +0.40 C3

WATER PUMP
F3 +0.40 C3

F.H.C.

UP

FOOTPATH
F3 +0.35 C3

3/4'GATE VALVE
WATER METER
3/4"CHECK VALVE
3/4'GATE VALVE

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

GROUND FLOOR PLAN


Drawing Number :

A-04

VOID

M&E
F3 +4.10 C4
UP

DN

F.H.C.

HALL
F5 +4.10 C1

FIRE LIFT LOBBY


F3 +4.10 C4

VOID

CAFE & BAKERY


F5 +4.10 C1
KITCHEN
F3 +4.10 C1
VOID

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

FIRST FLOOR PLAN


Drawing Number :

A-05

F9

W.C.

+7.35

C2

WALK IN CLOSET
F8

+7.40

C1

F9

W.C.

+7.35

WALK IN CLOSET

C2

F8

+7.40

WALK IN CLOSET

C1

F8

+7.40

W.C.

F9

C1

+7.35

C2

VOID

M&E
F3 +7.40 C3
UP

F6

FOYER
+7.40

C1

FOYER

F6

DN

+7.40

F6

C1

FOYER
+7.40

F6

C1

F.H.C.

TERRACE

F11
F.H.C.

+7.35

C1

HALL
F5 +7.40 C1

F6

UP

KITCHEN
+7.40

+7.40

C1

F.H.C.

F11

FIRE LIFT LOBBY


F3 +7.40 C3

FOYER

TERRACE

C1

+7.35

F6

C1

KITCHEN
+7.40

F11

TERRACE
+7.40

C1

F11

C1

F6

UP

KITCHEN
+7.40

C1

TERRACE

C1

+7.35

UP

UP

F8

BEDROOM
+7.40

LIVING ROOM

C1

F6

+7.40

C1

F8

VOID

F8

BEDROOM
+7.40

C1

BEDROOM
+7.40

LIVING ROOM

C1

F6

+7.40

C1

LIVING ROOM

F6

+7.40

F8

F8

C1

BEDROOM
+7.40

C1

BEDROOM
+7.40

LIVING ROOM

C1

F6

+7.40

LIVING ROOM

C1

F6

LIVING ROOM

F6

+7.40

LIVING ROOM

F6

C1

+7.40

C1

F8

BEDROOM
+7.40

C1

+7.40

F8

BEDROOM
+7.40

C1

F9

+7.35

C1

VOID
F6

KITCHEN
+7.40

UP

C1
F11

TERRACE
+7.35

F6

KITCHEN
+7.40

C1

UP

F6

C1
F11

TERRACE
+7.35

PH.W.STUDIO

Issue Amendments :

W.C.

+7.35

C2

WALK IN CLOSET
F8

Project Title :

+7.40

C1

FOYER
+7.40

C1

F9

Mechanical Engineer :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

F6
F11

F6

W.C.

+7.35

C2

WALK IN CLOSET
F8

+7.40

C1

Site Orientation :

FOYER
+7.40

C1

F9

Client :

UP

C1

TERRACE
+7.35

KITCHEN
+7.40

C1

C1

F.H.C.

F6

F9

+7.40

C1

F.H.C.

AHU
F3 +7.40 C3

KITCHEN

F6

W.C.

+7.35

FOYER
+7.40

C1

WALK IN CLOSET

C2

F11

+7.40

WALK IN CLOSET

C1

F8

+7.40

C1

W.C.

C2

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

SECOND FLOOR PLAN


Drawing Number :

A-06

F6

FOYER
+10.70

C1

W.C.

F10

+10.65

F6

C2

FD.

FOYER
+10.70

C1

W.C.

F10

+10.65

F6

C2

FOYER
+10.70

C1

F10

W.C.

+10.65

F6

C2

FOYER
+10.70

C1

CORRIDOR
F5 +10.70 C1

M&E
F3 +10.70 C3
UP

DN

VOID

DN

DN

DN

VOID

DN

VOID

VOID

F.H.C.

F.H.C.

HALL
F5 +10.70 C1

FIRE LIFT LOBBY


F3 +10.70 C3

F11

TERRACE
+10.65

C1

WALK IN CLOSET
F8

LIVING ROOM

F6

+10.70

F8

BEDROOM
+10.70

F11

TERRACE
+10.65

C1
F8

C1

C1

F6

+10.70

BEDROOM
+10.70

F11

F8

C1

+10.70

TERRACE
+10.65

C1
F8

C1

WALK IN CLOSET

LIVING ROOM

C1

+10.70

F.H.C.

BEDROOM
+10.70

F11

F6

+10.70

+10.65

C1

LIVING ROOM

WALK IN CLOSET

LIVING ROOM

C1

TERRACE

C1
F8

C1

+10.70

F6

C1

+10.70

C1

FD.

VOID
F7

ROOF TOP
+10.50

LIVING ROOM

WALK IN CLOSET
F8

+10.70

F6

C1

F8

BEDROOM
+10.70

C1
F11

+10.70

TERRACE
+10.65

LIVING ROOM

WALK IN CLOSET

C1

F8

+10.70

F6

C1

F8

BEDROOM
+10.70

C1

C1

F11

+10.70

TERRACE
+10.65

F8

+10.70

F6

C1

F8

BEDROOM
+10.70

C1

F11

C1

F.H.C.

+10.70

TERRACE
+10.65

C1
F8

BEDROOM
+10.70

F8

+10.70

F10

+10.65

C1

C1

C1

F.H.C.

VOID

VOID

WALK IN CLOSET

LIVING ROOM

WALK IN CLOSET

C1

VOID
DN

DN

W.C.

C2

DN

HALL
F5 +10.70 C1
CORRIDOR
F5 +10.70 C1
FD.

F10

PH.W.STUDIO

CORRIDOR
F5 +10.70 C1

FD.

Issue Amendments :

W.C.

+10.65

C2

Project Title :

F6

FOYER
+10.70

Mechanical Engineer :

C1

F10

W.C.

+10.65

C2

Site Orientation :

F6

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

FOYER
+10.70

C1

F10

W.C.

+10.65

C2

F6

FOYER
+10.70

C1

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

THIRD FLOOR PLAN


Drawing Number :

A-07

F9

W.C.

+13.95

WALK IN CLOSET

C2

F8

+14.00

C1

F9

W.C.

+13.95

WALK IN CLOSET

C2

F8

+14.00

WALK IN CLOSET

C1

F8

UP

F6

FOYER
+14.00

C1

F11
F.H.C.

TERRACE
+13.95

C1

F6

BEDROOM
+14.00

KITCHEN
+14.00

C1

FOYER

F6

F6

+14.00

TERRACE
+13.95

C1

TERRACE

F11

C1

F6

C2

+14.00

C1

F6

FOYER

C1

+14.00

KITCHEN
+14.00

+13.95

C1

F11

C1

F6

UP

KITCHEN
+14.00

C1

TERRACE

C1

+13.95

UP

UP

LIVING ROOM

C1

+13.95

F.H.C.

F11

UP

F8

+14.00

F.H.C.

FIRE LIFT LOBBY


F3 +14.00 C3

HALL
F5 +14.00 C1

FOYER

F6

DN

W.C.

F9

C1

CORRIDOR
F5 +14.00 C1

CORRIDOR
F5 +14.00 C1

M&E
F3 +14.00 C3

+14.00

C1

F8

BEDROOM
+14.00

C1

F8

BEDROOM
+14.00

LIVING ROOM

C1

F6

+14.00

LIVING ROOM

C1

F6

C1

+14.00

F8

BEDROOM
+14.00

C1

F9

+13.95

LIVING ROOM

F6
VOID

F8

F6

KITCHEN
+14.00

BEDROOM
+14.00

C1

+14.00

F8

C1

UP

F6
F11

+13.95

C1

LIVING ROOM

F6

C1

TERRACE

+14.00

KITCHEN
+14.00

C1

BEDROOM
+14.00

C1

LIVING ROOM

F6

+14.00

LIVING ROOM

F6

C1

UP

F6

C1
F11

TERRACE
+13.95

KITCHEN
+14.00

PH.W.STUDIO

Issue Amendments :

W.C.

C2

WALK IN CLOSET
F8

Project Title :

+14.00

FOYER
+14.00

C1

Mechanical Engineer :

Reference

Description

Date

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

C1

TERRACE
+13.95

KITCHEN
+14.00

FOYER
+14.00

C1

WALK IN CLOSET
F6

C1

C1

FOYER
+14.00

F8

+14.00

C1

W.C.

C2

C1

CORRIDOR
F5 +14.00 C1

F9

C1

Client :

+14.00

F6
F11

F6

W.C.

+13.95

C2

WALK IN CLOSET
F8

+14.00

F9

C1

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY

BEDROOM

UP

C1

CORRIDOR
F5 +14.00 C1

+13.95

F8

F.H.C.

F6

F9

C1

C1

F.H.C.

OFFICE
F5 +14.00 C1

+14.00

W.C.

+13.95

WALK IN CLOSET
F8

C2

+14.00

C1

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

TYPICAL FLOOR PLAN


4,6,8
Drawing Number :

A-08

F6

FOYER
+17.30

M&E
F3 +17.30 C3
UP

F10

C1

W.C.

+17.25

C2

F6

FOYER
+17.30

C1

W.C.

F10

+17.25

F6

C2

FOYER
+17.30

DN

FIRE LIFT LOBBY


F3 +17.30 C3

F11

TERRACE
+17.25

VOID

C1
F8

VOID

F8

C1

+17.30

+17.30

F8

+17.30

C1
F11

TERRACE
+17.25

+17.25

C1

+17.30

+17.30

F8

C1

F8

+17.30

+17.30

F11

F6

C1

F8

BEDROOM
+17.30

C1

C1

F11

TERRACE
+17.25

+17.30

+17.30

F11

F8

WALK IN CLOSET
F8

+17.30

F6

LIVING ROOM

F6

F8

BEDROOM
+17.30

+17.30

C1
F11

C1

DN

C1

TERRACE
+17.25

+17.30

C1

WALK IN CLOSET

C1

F8

F8

BEDROOM
+17.30

+17.30

C1

C1

C1

F10

VOID
DN

+17.25

LIVING ROOM

C1

C1

C1

+17.30

TERRACE

C1

F.H.C.

VOID

JANITOR ROOM
F5 +17.30 C1

BEDROOM

WALK IN CLOSET

F.H.C.

JANITOR ROOM
F5 +17.30 C1

C1

LIVING ROOM

F6

C1

+17.30

+17.25

F8

C1

+17.30

TERRACE

C1

LIVING ROOM

WALK IN CLOSET

C1

BEDROOM

WALK IN CLOSET

LIVING ROOM

LIVING ROOM

BEDROOM

TERRACE

F8

F6

F6

C1

+17.30

C1

VOID

C1

C1

WALK IN CLOSET
F8

+17.30

+17.30

F.H.C.

F11

WALK IN CLOSET

LIVING ROOM

F6

BEDROOM

FOYER

F6

DN

F.H.C.

F.H.C.

C2

DN

VOID

HALL
F5 +17.30 C1

+17.25

VOID

DN

DN

W.C.

F10

C1

W.C.

+17.25

C2

DN

HALL
F5 +17.30 C1

F10

PH.W.STUDIO

Issue Amendments :

W.C.

+17.25

F6

C2

Project Title :

FOYER
+17.30

Mechanical Engineer :

C1

F10

W.C.

+17.25

F6

C2

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

FOYER
+17.30

C1

F10

W.C.

+17.25

C2

F6

FOYER
+17.30

C1

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

TYPICAL FLOOR PLAN


5,7,9
Drawing Number :

A-09

FD.

FD.

MECHANICAL LIFT
F3

+35.80

C3

VOID

UP
F3

DN

F5

STAIR HALL
+33.80

F3

C1

FOOTPATH
+33.80

VOID

ROOF TANK
+34.80

C3

F.H.C.
FD.

ROOF DECK

F11

+33.75

UP

FD.

MECHANICAL LIFT
F3

FD.

PH.W.STUDIO

+35.80

C3

FD.

Issue Amendments :

Project Title :

Mechanical Engineer :

FD.

Site Orientation :

FD.

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ROOF DECK PLAN


Drawing Number :

A-10

F3

ROOF
+38.80

F3

ROOF

+37.30

F3

ROOF
+37.30

VOID

RD.

RD.

RD.

RD.

RD.

F3

F3

ROOF
+37.30

ROOF
+37.30

F3

ROOF

+37.30

DN
RD.

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ROOF PLAN 1
Drawing Number :

A-11

MATAL SHEET ROOF

RD.

RD.

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ROOF PLAN 2
Drawing Number :

A-12

MATAL SHEET ROOF

MATAL SHEET SIDING


VOID

MATAL SHEET ROOF

+39.00 ROOF LEVEL


+37.10 ROOF LEVEL

VOID
VOID

VOID

+33.80 ROOF DECK LEVEL

+30.50 9TH FLOOR LEVEL

+27.20 8TH FLOOR LEVEL

+23.90 7TH FLOOR LEVEL

+20.60 6TH FLOOR LEVEL

+17.30 5TH FLOOR LEVEL

+14.00 4TH FLOOR LEVEL

+10.70 3RD FLOOR LEVEL

+7.40

2ND FLOOR LEVEL

+4.10

1ST FLOOR LEVEL

VOID
VOID

VOID

VOID

+0.80 GROUND FLOOR LEVEL


+0.00 GROUND FLOOR LEVEL

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ELEVATION 1
Drawing Number :

A-13

MATAL SHEET ROOF


VOID

MATAL SHEET ROOF

+39.00 ROOF LEVEL

+39.00 ROOF LEVEL


MATAL SHEET ROOF

+37.10 ROOF LEVEL

MATAL SHEET SIDING

+37.10 ROOF LEVEL

VOID
VOID

+33.80 ROOF DECK LEVEL

+33.80 ROOF DECK LEVEL

+30.50 9TH FLOOR LEVEL

+30.50 9TH FLOOR LEVEL

+27.20 8TH FLOOR LEVEL

+27.20 8TH FLOOR LEVEL

+23.90 7TH FLOOR LEVEL

+23.90 7TH FLOOR LEVEL

+20.60 6TH FLOOR LEVEL

+20.60 6TH FLOOR LEVEL

+17.30 5TH FLOOR LEVEL

+17.30 5TH FLOOR LEVEL

+14.00 4TH FLOOR LEVEL

+14.00 4TH FLOOR LEVEL

+10.70 3RD FLOOR LEVEL

+10.70 3RD FLOOR LEVEL

+7.40

2ND FLOOR LEVEL

+7.40

2ND FLOOR LEVEL

+4.10

1ST FLOOR LEVEL

+4.10

1ST FLOOR LEVEL

+0.80 GROUND FLOOR LEVEL


+0.00 GROUND FLOOR LEVEL

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

+0.80 GROUND FLOOR LEVEL


+0.00 GROUND FLOOR LEVEL

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ELEVATION 2,4
Drawing Number :

A-14

MATAL SHEET SIDING


VOID

+39.00 ROOF LEVEL


VOID

+37.10 ROOF LEVEL

VOID
VOID

+33.80 ROOF DECK LEVEL

+30.50 9TH FLOOR LEVEL

+27.20 8TH FLOOR LEVEL

+23.90 7TH FLOOR LEVEL

+20.60 6TH FLOOR LEVEL

+17.30 5TH FLOOR LEVEL

+14.00 4TH FLOOR LEVEL

+10.70 3RD FLOOR LEVEL

VOID

VOID

VOID

+7.40

2ND FLOOR LEVEL

+4.10

1ST FLOOR LEVEL

VOID

+0.80 GROUND FLOOR LEVEL


+0.00 GROUND FLOOR LEVEL

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ELEVATION 3
Drawing Number :

A-15

MATAL SHEET ROOF

STEEL COLUMN
WF 400x200x8x13 mm.
MATAL SHEET ROOF

+39.00 ROOF LEVEL

VOID

+37.10 ROOF LEVEL

VOID

ROOF DECK

F11

+33.75

VOID

VOID

+33.80 ROOF DECK LEVEL


VOID

LIVING ROOM

F6

VOID
F8

BEDROOM
+27.20

+30.50

LIVING ROOM

F6

C1

VOID

BEDROOM 2

F8

C1

+27.20

C1

F8

BEDROOM
+27.20

LIVING ROOM

F6

+23.90

+30.50

LIVING ROOM

F6

C1

LIVING ROOM

F6

C1

+27.20

C1

F8

BEDROOM
+27.20

BEDROOM 2

C1

F8

+23.90

+30.50

BEDROOM 2

F8

C1

LIVING ROOM

F6

C1

+27.20

C1

F8

BEDROOM
+27.20

F6

+23.90

LIVING ROOM

F6

C1

LIVING ROOM

F6

C1

LIVING ROOM

C1

+30.50

+27.20

F8

C1

BEDROOM
+27.20

F8

LIVING ROOM
+27.20

C1

LIVING ROOM

F6

+27.20

LIVING ROOM

C1

+23.90

BEDROOM 2

F8

C1

F6

C1

BEDROOM 2

C1

+30.50

F6

+23.90

+30.50

F8

C1

LIVING ROOM

F6

C1

BEDROOM
+27.20

C1

LIVING ROOM

F6

+27.20

F8

+23.90

F8

C1

BEDROOM 2

C1

+30.50

+30.50 9TH FLOOR LEVEL

C1

BEDROOM
+27.20

C1

LIVING ROOM

C1

F6

+23.90

+27.20 8TH FLOOR LEVEL

+23.90 7TH FLOOR LEVEL

C1

VOID
F8

BEDROOM
+20.60

LIVING ROOM

F6

C1

VOID

+20.60

C1

F8

BEDROOM
+20.60

LIVING ROOM

F6

VOID

VOID
F8

BEDROOM
+14.00

+17.30

VOID

F8

LIVING ROOM
+14.00

C1

F8

BEDROOM
+14.00

LIVING ROOM

F6

+10.70

+20.60

C1

F8

BEDROOM
+20.60

BEDROOM 2

C1

F6

C1

LIVING ROOM

F6

C1

+17.30

F6

LIVING ROOM
+14.00

C1

F8

BEDROOM
+14.00

BEDROOM 2

C1

F8

+10.70

+20.60

C1

F8

BEDROOM
+20.60

+17.30

F8

LIVING ROOM
+14.00

C1

F8

BEDROOM
+14.00

F6

+10.70

F8

C1

BEDROOM
+20.60

+14.00

F8

C1

BEDROOM
+14.00

F8

C1

LIVING ROOM

F6

+20.60

F8

LIVING ROOM

F6

F6

+10.70

F8

C1

BEDROOM
+20.60

C1

LIVING ROOM

F6

+20.60

+14.00

C1

LIVING ROOM

F6

+14.00

+17.30

F8

C1

+14.00

F6

C1

F8

+10.70

+17.30

LIVING ROOM

F6

+14.00

F18

C1

BEDROOM 2

C1

BEDROOM
+20.60

C1

LIVING ROOM

C1

BEDROOM

F8

C1

BEDROOM 2

C1

LIVING ROOM

C1

+10.70

+17.30

C1

BEDROOM 2

C1

+20.60

LIVING ROOM

F6

LIVING ROOM

F6

LIVING ROOM

F6

C1

C1

+17.30

C1

LIVING ROOM

C1

+20.60

BEDROOM 2

C1

F6

C1

LIVING ROOM

F6

C1

LIVING ROOM

C1

F6

C1

LIVING ROOM

F6

C1

+17.30 5TH FLOOR LEVEL

C1

BEDROOM
+14.00

C1

LIVING ROOM

C1

F6

+10.70

+20.60 6TH FLOOR LEVEL

+14.00 4TH FLOOR LEVEL

+10.70 3RD FLOOR LEVEL

C1

VOID
F8

BEDROOM
+7.40

LIVING ROOM

C1

F6

+7.40

C1

F8

BEDROOM
+7.40

LIVING ROOM

C1

F6

+7.40

C1

F8

BEDROOM
+7.40

C1

LIVING ROOM

F6

+7.40

C1

F8

BEDROOM
+7.40

LIVING ROOM

C1

F6

+7.40

C1

F8

BEDROOM
+7.40

LIVING ROOM

C1

F6

+7.40

C1

LIVING ROOM

F6

+7.40

C1

F8

BEDROOM
+7.40

C1

LIVING ROOM

F6

+7.40

C1

F8

BEDROOM
+7.40

C1

+7.40

2ND FLOOR LEVEL

+4.10

1ST FLOOR LEVEL

VOID

VOID

VOID

VOID

VOID

VOID

VOID

LOBBY
F11 +0.80 C1

+0.80 GROUND FLOOR LEVEL


+0.00 GROUND FLOOR LEVEL
ENTRY
F11 +0.65 C1

PH.W.STUDIO

PARKING
F2 +0.20 C3

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

SECTION A
Drawing Number :

A-16

+39.00 ROOF LEVEL


+37.10 ROOF LEVEL
VOID

F.H.C.

+33.80 ROOF DECK LEVEL

+30.50 9TH FLOOR LEVEL

+27.20 8TH FLOOR LEVEL

+23.90 7TH FLOOR LEVEL

+20.60 6TH FLOOR LEVEL

+17.30 5TH FLOOR LEVEL

+14.00 4TH FLOOR LEVEL

+10.70 3RD FLOOR LEVEL

+7.40

2ND FLOOR LEVEL

+4.10

1ST FLOOR LEVEL

CAFE & BAKERY


F1 +4.10 C1

OFFICE
F1 +0.80 C1

VOID

STAIR HALL
F1 +0.80 C1

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

LOUNGE
F1 +0.80 C1

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

+0.80 GROUND FLOOR LEVEL


+0.00 GROUND FLOOR LEVEL

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:200

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

SECTION B
Drawing Number :

A-17

F6
F9

W.C. 1
+7.35

KITCHEN
+7.40

F10

C1

W.C. 2
+10.65

C2

C2

BEDROOM 2

F8

+10.70

C1

BEDROOM 1

F8

+7.40

C1

LIVING ROOM

F6

UP
F11

+10.70

TERRACE
+10.65

C1

C1

VOID
F11

TERRACE
+7.35

C1

LIVING ROOM

F6

+7.40

VOID

C1

F6

FOYER
+7.40

C1

DN

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:75

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ROOM TYPE DETAIL PLAN


Drawing Number :

A-18

F9

W.C. 1
+7.35

C2

F9

LAV.
WC.
SHW.
S.
HS.
BH.
FD.

COTTO
DIAMOND
COTTO
COTTO RAIN SHOWER
COTTO ASTORIA
C839
COTTO

PH.W.STUDIO

W.C. 1
+7.35

C2

QUADO C0900
CT102C9
C13507
Z95

CT667NV#CR[HM]
COTTO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:25

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

W.C. 1 DETAIL
Drawing Number :

A-19

F10

W.C. 2
+10.65

C2

F10

LAV.
WC.
SHW.
S.
HS.
BH.
FD.

W.C. 2
+10.65

C2

COTTO
DIAMOND

QUADO C0900
CT102C9
COTTO
C13507
x COTTO RAIN SHOWER
Z95
COTTO ASTORIA
C839
COTTO

PH.W.STUDIO

CT667NV#CR[HM]
COTTO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:25

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

W.C. 2 DETAIL
Drawing Number :

A-20

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

DOOR DETAIL
& SCHEDULE 01
Drawing Number :

A-21

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

DOOR DETAIL
&SCHEDULE 02
Drawing Number :

A-22

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

WINDOW DETAIL
&SCHEDULE 01
Drawing Number :

A-23

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

WINDOW DETAIL
&SCHEDULE 02
Drawing Number :

A-24

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

WINDOW DETAIL
&SCHEDULE 03
Drawing Number :

A-25

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

WINDOW DETAIL
&SCHEDULE 04
Drawing Number :

A-26

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

WINDOW DETAIL
&SCHEDULE 05
Drawing Number :

A-27

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

WINDOW DETAIL
&SCHEDULE 06
Drawing Number :

A-28

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

WINDOW DETAIL
&SCHEDULE 07
Drawing Number :

A-29

VOID

UP

DN

LIVING ROOM

F6

PH.W.STUDIO

+7.40

C1

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ST-01 MAIN STAIRCASE


DETAIL PLAN
Drawing Number :

A-30

Issue Amendments :

TOP FINISH

1"
TOP FINISH

0.05 x 0.05

1" x 2 "

"

TOP FINISH

1"

1/2" x 1/2 "

1" x 2 "

1" x 2 "

PH.W.STUDIO

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:75

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ST-01 SECTION 1,
DETAIL 1-3
Drawing Number :

A-31

VOID

UP

UP

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

DN

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Client :

Civil Engineer :

Location :

Project Director :

Interior Designer :

Checked By :

Phattiya Wangniwetkul

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ST-02 FIRE ESCAPE


DETAIL PLAN
Drawing Number :

A-32

VOID

+0.35

GROUND LEVEL

1ST FLOOR LEVEL

2ND FLOOR LEVEL

3RD FLOOR LEVEL

4TH FLOOR LEVEL

5TH FLOOR LEVEL

6TH FLOOR LEVEL

7TH FLOOR LEVEL

8TH FLOOR LEVEL

9TH FLOOR LEVEL

ROOF DECK LEVEL

0.05 x 0.05

1" x 2 "

1/2" x 1/2 "

1" x 2 "

1" x 2 "

ROOF LEVEL

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:75

Phattiya Wangniwetkul

DEC 5,2014

Client :

Civil Engineer :

Location :

Project Director :

Interior Designer :

Checked By :

Phattiya Wangniwetkul

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ST-02 SECTION 1 ,
DETAIL 1-3
Drawing Number :

A-33

+10.70

UP

FLAT BAR 2"

"x2"

C 200x75x20

+7.40

VOID

"

C 200x75x20
+7.40
C 200x75x20

STEEL PLATE300x100x9 mm.

"x2"
+10.70

"
C 200x75x20
C 200x75x20
STEEL PLATE300x100x9 mm.

DN

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

"

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ST-03 STAIRCASE DETAIL


Drawing Number :

A-34

1" x 2"

+0.65

SLOPE 1:12

+0.35
@0.30

UP
1" x 2 "
0.05 x 0.05

PH.W.STUDIO

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

R-01 RAMP DETAIL


Drawing Number :

A-35

WF 400x200x8x13 mm.
STEEL PLATE 500x500x9 mm.

TRUSS
C75x50x16 mm. @ 1.20 m.
MATAL SHEET

+33.80 ROOF DECK LEVEL

C200x60x20 mm.

STEEL PLATE 500x500x9 mm.


FIXED SUPPORT
STEEL COLUMN
WF 400x200x8x13 mm.

FIXED SUPPORT
STEEL PLATE 500x500x9 mm.

MATAL SHEET ROOFING


DETAIL A

MATAL SHEET ROOFING


COLORBOND
PEANUT BUTTER CREAM COLOR

0.50x0.50

MATAL SHEET SIDING


DETAIL B

WF 400x200x8x13 mm.

FASHING MATALSHEET
MATAL SHEET ROOFING
COLORBOND
PEANUT BUTTER CREAM COLOR

4"

50x50x2
25x100

STEEL BEAM
WF 175x175x7.5x11 mm.

C-CHANAL 100X50XSUPPORT
U-CAMP
" @0.50 m.

MATAL SHEET SIDING

STEEL PLATE 500x500x9 mm.

4"

STEEL COLUMN
WF 400x200x8x13 mm.

DETAIL C

PH.W.STUDIO

4"

Issue Amendments :

Project Title :

Mechanical Engineer :

Site Orientation :

FACULTY OF ARCHITECTURE AND PLANNING


THAMMASAT UNIVERSITY
Reference

Description

Date

Client :

Civil Engineer :

Project Director :

Interior Designer :

Phattiya Wangniwetkul

Drawing Title :
Project Code : -

Date :

Drawn By :

Scale : 1:50

Phattiya Wangniwetkul

DEC 5,2014

Location :

Checked By :

Rachatewi, Bangkok, Thailand

Contractor must verify all dimension at the job before commercing any work or preparing shop drawing.

ROOF TRUSS DETAIL T-01


DETAIL 001 D-01
Drawing Number :

A-36

Potrebbero piacerti anche