CRONOGRAMA VALORIZADO DE AVANCE DE OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE
CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

OBRA
SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

CONTRATO

N 164-2015-MDI/GM

Item

PLAZO DE EJECUCION: 120 DIAS CALENDARIOS

MESES EJECUCION

PRESUPUESTO BASE

Descripcin

NOVIEMBRE- 2015

DICIEMBRE - 2015

ENERO - 2015

FEBRERO - 2015

MARZO - 2015

Und.

Metrado

Precio S/.

Parcial S/.

METRADO

Parcial S/.

METRADO

Parcial S/.

METRADO

Parcial S/.

METRADO

Parcial S/.

METRADO

Parcial S/.

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA


I.E.I.P N 429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC,
DISTRITO DE IGUAIN- HUANTA-AYACUCHO

UND

1.00

749466.27

749466.27

0.1739

130329.05

0.2119

158,827.72

0.28816

215,966.23

0.2561

191,931.81

0.0699

52,411.33

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA


I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE
IGUAIN- HUANTA-AYACUCHO

UND

1.00

779508.30

779508.30

0.1971

153656.36

0.2342

182,572.42

0.2795

217,851.59

0.2298

179,109.14

0.0594

46,318.69

COSTO DIRECTO
GASTOS GENERALES
UTILIDADES

14.85%

4.514407%

SUB TOTAL
IGV
18 %
TOTAL PRESUPUESTO SEGN EXPEDIENTE TECNICO
FACTOR DE RELACION
PRESUPUESTO DEL CONTRATO
AVANCE DE LA OBRA PROGRAMADO

1,528,974.57

283,985.40

341,400.13

433,817.82

371,040.95

98,730.02

227,052.72

42,171.83

50,697.91

64,421.94

55,099.58

14,661.40

69,024.14

12,820.26

15,412.19

19,584.30

16,750.30

4,457.07

1,825,051.42
328,509.26
2,153,560.68
1.00
2,153,560.68

338,977.49
61,015.95
399,993.43
1.00
399,993.43
18.57%

407,510.24
73,351.84
480,862.08
1.00
480,862.08
22.33%

517,824.06
93,208.33
611,032.39
1.00
611,032.39
28.37%

442,890.82
79,720.35
522,611.17
1.00
522,611.17
24.27%

117,848.50
21,212.73
139,061.23
1.00
139,061.23
6.46%

RESUMEN DE VALORIZACION N 2015-01 NOVIEMBRE 2015


MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE
CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

OBRA
SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

CONTRATO

N 164-2015-MDI/GM

PLAZO DE EJECUCION:

120 DIAS CALENDARIOS

INICIO DE OBRA 16/11/2015


Item

PRESUPUESTO BASE

Descripcin
Und.

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA


I.E.I.P N 429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC,
DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA


I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE
IGUAIN- HUANTA-AYACUCHO

COSTO DIRECTO
GASTOS GENERALES
UTILIDADES

14.85%

4.514407%

SUB TOTAL
IGV
18 %
TOTAL PRESUPUESTO SEGN EXPEDIENTE TECNICO
FACTOR DE RELACION
PRESUPUESTO DEL CONTRATO
AVANCE DE LA OBRA EJECUTADO
AVANCE DE LA OBRA PROGRAMADO

UND

UND

Metrado

TERMINO DE OBRA 14/03/2016

MESES EJECUCION
NOVIEMBRE- 2015

Precio S/.

Parcial S/.

1.00

749,466.27

749,466.27

1.00

779,508.30

779,508.30

METRADO

0.13

#REF!

Parcial S/.

99,064.27

#REF!

1,528,974.57

#REF!

227,052.72

#REF!

69,024.14

#REF!

1,825,051.42
328,509.26
2,153,560.68
1.00
2,153,560.68

#REF!
#REF!
#REF!
1.00
#REF!
#REF!
18.57%

DICIEMBRE - 2015
METRADO

ENERO - 2015

Parcial S/.

METRADO

FEBRERO - 2015

Parcial S/.

METRADO

MARZO - 2015

Parcial S/.

METRADO

Parcial S/.

VALORIZACION N 03 DEL 02 DE ENERO 2016 AL 31 DE ENERO 2016


MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

OBRA

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

Item

Und.

I.E.I.P. N 429-114 DE CHIHUA

01

INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO

01.01
01.01.01

Metrado

Precio S/.

02/01/16 AL 31/01/16

MES:

ENERO 2016

120 DIAS CALENDARIOS


AVANCES FISICOS

PRESUPUESTO BASE

Descripcin

PERIODO

ANTERIOR
Parcial S/.

METRADO

Parcial S/.

EN EL MES
PORCENTA
JE

METRADO

SALDO

ACUMULADO

Parcial S/.

PORCENT
AJE

METRADO

PORCENT
Parcial S/.
AJE

METRADO

Parcial S/.

PORCENT
AJE

745390.63
322217.93

CONSTRUCCION 01 AULA, SALA DE USOS MULTIPLE, DEPOS. DE MAT. EDUCATIVO Y SS.HH. NIOS, NIAS

672.94

TRABAJOS PRELIMINARES

01.01.01.01

LIMPIEZA DE TERRENO MANUAL

m2

255.87

1.39

355.66

255.87

355.66

100.00%

0.00

0.00%

255.87

355.66

100.00%

0.00

0.00

0.00%

01.01.01.02

TRAZO Y REPLANTEO DURANTE EL PROCESO

m2

255.87

1.24

317.28

255.87

317.28

100.00%

0.00

0.00%

255.87

317.28

100.00%

0.00

0.00

0.00%

01.01.02

16421.44

MOVIMIENTO DE TIERRAS

01.01.02.01

REFINE Y PERFILADO DEL TERRENO

m2

355.87

21.05

7491.06

355.87

7,491.06

100.00%

0.00

0.00%

355.87

7,491.06

100.00%

0.00

0.00

0.00%

01.01.02.02

EXCAVACION DE TERRENO PARA ZAPATAS HASTA 1.70 M.

m3

57.78

30.37

1754.78

57.78

1,754.78

100.00%

0.00

0.00%

57.78

1,754.78

100.00%

0.00

0.00

0.00%

01.01.02.03

EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

39.15

30.37

1188.99

39.15

1,188.99

100.00%

0.00

0.00%

39.15

1,188.99

100.00%

0.00

0.00

0.00%

01.01.02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

39.54

40.25

1591.49

39.54

1,591.49

100.00%

0.00

0.00%

39.54

1,591.49

100.00%

0.00

0.00

0.00%

01.01.02.05

ELIMINACIN DE MATERIAL EXCEDENTE

m3

85.3

13.37

1140.46

85.30

1,140.46

100.00%

0.00

0.00%

85.30

1,140.46

100.00%

0.00

0.00

0.00%

01.01.02.06

NIVELACION Y COMPACTADO DE SUB-BASE

m2

230.5

2.62

603.91

230.50

603.91

100.00%

0.00

0.00%

230.50

603.91

100.00%

0.00

0.00

0.00%

01.01.02.07

RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO

m2

230.5

11.5

2650.75

230.50

2,650.75

100.00%

0.00

0.00%

230.50

2,650.75

100.00%

0.00

0.00

0.00%

01.01.03

22522.61

CONCRETO SIMPLE

01.01.03.01

SOLADO PARA ZAPATA ( e= 0.10 m) MEZCLA C:H 1:10

m2

51.67

45

2325.15

51.67

2,325.15

100.00%

0.00

0.00%

51.67

2,325.15

100.00%

0.00

0.00

0.00%

01.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.

m3

16.97

304.31

5164.14

16.97

5,164.14

100.00%

0.00

0.00%

16.97

5,164.14

100.00%

0.00

0.00

0.00%

01.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

73.54

59.45

4371.95

73.54

4,371.95

100.00%

0.00

0.00%

73.54

4,371.95

100.00%

0.00

0.00

0.00%

01.01.03.04

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

7.14

342.86

2448.02

7.14

2,448.02

100.00%

0.00

0.00%

7.14

2,448.02

100.00%

0.00

0.00

0.00%

01.01.03.05

CANALETA DE EVACUACION PLUVIAL ENCOFRADO Y DESENCOFRADO

m2

11.01

48.13

529.91

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.01

529.91

100.00%

01.01.03.06

CANALETA DE EVACUACION PLUVIAL F'C=175KG/CM2

01.01.03.07

FALSO PISO DE 4" DE CONCRETO 1:8

01.01.04

18.35

47.2

866.12

0.00

0.00

0.00%

m2

155.86

43.74

6817.32

0.00

0.00

0.00%

155.86

0.00

0.00%

0.00

0.00

0.00%

18.35

866.12

100.00%

6,817.32

100.00%

155.86

6,817.32

100.00%

0.00

0.00

0.00%

138134.08

OBRAS DE CONCRETO ARMADO

01.01.04.01

ZAPATAS CONCRETO F'C=210 KG/CM2

m3

22.08

544.79

12028.96

22.08

12,028.96

100.00%

0.00

0.00%

22.08

12,028.96

100.00%

0.00

0.00

0.00%

01.01.04.02

ZAPATAS ACERO FY=4200 KG/CM2

kg

605.44

4.5

2724.48

605.44

2,724.48

100.00%

0.00

0.00%

605.44

2,724.48

100.00%

0.00

0.00

0.00%

01.01.04.03

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

m2

70.61

59.45

4197.76

70.61

4,197.76

100.00%

0.00

0.00%

70.61

4,197.76

100.00%

0.00

0.00

0.00%

01.01.04.04

VIGAS DE CIMENTACION ACERO FY=4200 KG/CM2

kg

1258.11

4.5

5661.5

1,258.11

5,661.50

100.00%

0.00

0.00%

1,258.11

5,661.50

100.00%

0.00

0.00

0.00%

01.01.04.05

VIGAS DE CIMENTACION CONCRETO F'C=210KG/CM2

m3

8.03

624.72

5016.5

8.03

5,016.50

100.00%

0.00

0.00%

8.03

5,016.50

100.00%

0.00

0.00

0.00%

01.01.04.06

COLUMNAS ENCOFRADO Y DESENCOFRADO

m2

147

65.49

9627.03

147.00

9,627.03

100.00%

0.00

0.00%

147.00

9,627.03

100.00%

0.00

0.00

0.00%

01.01.04.07

COLUMNAS ACERO FY=4200 KG/CM2

kg

2352.04

4.5

10584.18

2,352.04

10,584.18

100.00%

0.00

0.00%

2,352.04

10,584.18

100.00%

0.00

0.00

0.00%

01.01.04.08

COLUMNAS CONCRETO F'C= 210 KG/CM2

m3

11.38

658.74

7496.46

11.38

7,496.46

100.00%

0.00

0.00%

11.38

7,496.46

100.00%

0.00

0.00

0.00%

01.01.04.09

COLUMNETAS CONCRETO F'C= 175 KG/CM2

m3

2.75

496.01

1364.03

2.75

1,364.03

100.00%

0.00

0.00%

2.75

1,364.03

100.00%

0.00

0.00

0.00%

01.01.04.10

VIGAS ENCOFRADO Y DESENCOFRADO

m2

197.41

71.69

14152.32

197.41

14,152.32

100.00%

0.00

0.00%

197.41

14,152.32

100.00%

0.00

0.00

0.00%

01.01.04.11

VIGAS ACERO FY=4200 KG/CM2

kg

2317.11

4.5

10427

2,317.11

10,427.00

100.00%

0.00

0.00%

2,317.11

10,427.00

100.00%

0.00

0.00

0.00%

01.01.04.12

VIGAS CONCRETO F'C=210KG/CM2

m3

17.66

624.72

11032.56

17.66

11,032.56

100.00%

0.00

0.00%

17.66

11,032.56

100.00%

0.00

0.00

0.00%

01.01.04.13

VIGAS CONCRETO F'C=175KG/CM2

m3

0.59

496.01

292.65

0.59

292.65

100.00%

0.00

0.00%

0.59

292.65

100.00%

0.00

0.00

0.00%

01.01.04.14

LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO

m2

243.84

70.49

17188.28

243.84

17,188.28

100.00%

0.00

0.00%

243.84

17,188.28

100.00%

0.00

0.00

0.00%

01.01.04.15

LOSAS ALIGERADAS LADRILLO HUECO DE ARCILLA 15X30X30 CM

und

2031.22

3.88

7881.13

2,031.22

7,881.13

100.00%

0.00

0.00%

2,031.22

7,881.13

100.00%

0.00

0.00

0.00%

01.01.04.16

LOSAS ALIGERADAS ACERO FY=4200 KG/CM2

kg

1445.65

4.5

6505.43

1,445.65

6,505.43

100.00%

0.00

0.00%

1,445.65

6,505.43

100.00%

0.00

0.00

0.00%

01.01.04.17

LOSAS ALIGERADAS CONCRETO F'C= 210 KG/CM2

m3

21.34

560.16

11953.81

21.34

11,953.81

100.00%

0.00

0.00%

21.34

11,953.81

100.00%

0.00

0.00

0.00%

01.01.05

15726.14

MUROS Y TABIQUES DE ALBAILERIA

01.01.05.01

MURO DE CABEZA LADRILLO K.K. 9X13X24

m2

89.54

113.66

10177.12

89.54

10,177.12

100.00%

0.00

0.00%

89.54

10,177.12

100.00%

0.00

0.00

0.00%

01.01.05.02

MURO DE SOGA LADRILLO K.K. 9X13X24

m2

73.11

69.31

5067.25

73.11

5,067.25

100.00%

0.00

0.00%

73.11

5,067.25

100.00%

0.00

0.00

0.00%

01.01.05.03

ALAMBRE N 8 REFUERZO HORIZONTAL EN MUROS

kg

13.82

4.8

66.34

13.82

66.34

100.00%

0.00

0.00%

13.82

66.34

100.00%

0.00

0.00

0.00%

01.01.05.04

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

8.43

49.28

415.43

8.43

415.43

100.00%

0.00

0.00%

8.43

415.43

100.00%

0.00

0.00

0.00%

01.01.06

15287.48

COBERTURA

01.01.06.01

COBERTURA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

m2

278.96

52.73

14709.56

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

278.96

14,709.56

100.00%

01.01.06.02

CUMBRERA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

24.09

23.99

577.92

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

24.09

577.92

100.00%

01.01.07

30453.97

REVOQUES, ENLUCIDOS Y MOLDURAS

01.01.07.01

TARRAJEO EN MURO INTERIOR Y EXTERIOR C:A 1:5, E=1.50CM

m2

356.77

25.24

9004.87

0.00

0.00

0.00%

356.77

9,004.87

100.00%

356.77

9,004.87

100.00%

0.00

0.00

0.00%

01.01.07.02

TARRAJEO PRIMARIO MORTERO 1:5

m2

35.54

25.24

897.03

0.00

0.00

0.00%

35.54

897.03

100.00%

35.54

897.03

100.00%

0.00

0.00

0.00%

01.01.07.03

TARRAJEO EN SUPERFICIE DE COLUMNAS C:A 1:5, E=1.50CM

m2

84.76

32.2

2729.27

0.00

0.00

0.00%

84.76

2,729.27

100.00%

84.76

2,729.27

100.00%

0.00

0.00

0.00%

01.01.07.04

TARRAJEO EN SUPERFICIE DE VIGAS C:A 1:5, E=1.50CM

m2

168.05

32.2

5411.21

0.00 3 de 27 0.00
Pagina

0.00%

168.05

5,411.21

100.00%

168.05

5,411.21

100.00%

0.00

0.00

0.00%

RESUMEN DE LIQUIDACION DE PAGO


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114
EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC, DISTRITO DE IGUAINHUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO
2,153,560.68

Monto Presupuesto EXPEDIENTE TECNICO:


FACTOR DE RELACION

1.00

Monto Presupuesto Convenio:

ITEM

01
02
03
04
05
07
08
09
10
11
12
13
14
15
16
17
18
19
20

DESCRIPCION
DE LA VALORIZACION
Monto Bruto valorizado Sin IGV
Monto Bruto Valorizado Segn Expediente Tecnico (C/IGV)
Factor de Relacion
Monto de Valorizacion segn Convenio MPH - SIMA PERU
Avance fisico del mes
Avance fisico acumulado
DE LOS REINTEGROS
Coeficiente de reajuste ( K NOVIEMBRE 2015 - 1.000)
Reintegro por reajuste
DE LAS DEDUCCIONES
Amortizacion del Adelanto Directo
Deduccion de reintegro que no corresponde por adelanto Directo
Adelando Especifico de Materiales (ver resumen)
Deduccion de reintegro que no corresponde por adelanto Materiales
Multas y penalidades (ver resumen)
Total Deducciones

Monto por Facturar sin I.G.V.


Monto por Facturar con I.G.V.

2,153,560.68

IMPORTE S/.
#REF!
#REF!
100.00%
#REF!
#REF!

#REF!
0.000
#REF!
0.00%

#REF!
0.00
0.00
0.00
#REF!

#REF!
#REF!

Son : Cuatrocientos Treinta y Cinco mil, Seiscientos Noventa y Tres con 05/100 Nuevos Soles

FICHA DE IDENTIFICACION DE OBRA


02 DE ENERO AL 31 DE ENERO 2016

PROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS


INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA
COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTAAYACUCHO

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA


I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE
IGUAIN- HUANTA-AYACUCHO

UBICACIN

CHIHUA

DEPARTAMENTO

AYACUCHO

PROVINCIA

HUANTA

DISTRITO

IGUAIN

ENTIDAD

MUNICIPALIDAD DISTRITAL DE IGUAIN

SUPERVISION

CONSORCIO EDUCACION IGUAIN

SUPERVISOR/INSPECTOR

: ING. JORGE LUIS UGAZ RODRIGUEZ

RESIDENTE

: ING. NORMAN AFRANIO DAVILA GABRIEL

ADJUDICACION
MODALIDAD

SUMA ALZADA

PRESUPUESTO BASE (S/.)

1,097,937.44

PLAZO EJECUCION BASE

120 DIAS CALENDARIO

CONTRATO N

N 164-2015-MDI/GM

PRESUPUESTO CONTRATADO (S/.)

1,097,937.44

- INVERSION (S/.)

1,097,937.44

ADELANTO DIRECTO 20%

0.00

ADELANTO MATERIALES 40%

0.00

PLAZO EJECUCION OFERTADO (DIAS CALENDARIO)

120

INICIO OFICIAL DEL PLAZO

16-Nov-15

TERMINO OFICIAL DEL PLAZO

14-Mar-16

RESUMEN DE CRONOGRAMA DE OBRA


NOMBRE DEL PROYECTO MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE
CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO
MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAINHUANTA-AYACUCHO

SUBPROYECTO
ENTIDAD EJECUTORA

MUNICIPALIDAD DISTRITAL DE IGUAIN

EJCUTOR DE OBRA

: CONSORCIO PROGRESO

LOCALIDAD

: CHIHUA

PLAZO DE EJECUCION

: 120 DAS CALENDARIOS

FECHA DE INICIO

: 16 DE NOVIEMBRE 2015

FECHA DE TERM. PROGR. : 14 DE MARZO 2016

DESCRIPCION

TOTAL (S/.)

NOVIEMBRE (DEL
16/11/2015 AL
30/11/2015)

DICIEMBRE 2015

ENERO 2016

FEBRERO 2016

MARZO (DEL
01/03/16 AL
14/03/16)

COSTO DIRECTO

779,508.30

119,524.29

156,587.79

203,065.38

184,183.40

116,147.44

GASTOS GENERALES (14.85% C.D.)

115,756.98

17,749.36

23,253.29

30,155.21

27,351.23

17,247.90

UTILIDAD ( 4.514407% C.D.)

35,190.18

5,395.81

7,069.01

9,167.20

8,314.79

5,243.37

SUBTOTAL

930,455.46

142,669.46

186,910.09

242,387.79

219,849.42

138,638.71

I.G.V. (18%)

167,481.98

25,680.50

33,643.82

43,629.80

39,572.90

24,954.97

1,097,937.44

168,349.96

220,553.90

286,017.59

259,422.32

163,593.68

% DE AVANCE MENSUAL

15.33%

20.09%

26.05%

23.63%

14.90%

% DE AVANCE ACUMULADO

15.33%

35.42%

61.47%

85.10%

100.00%

PRESUPUESTO DE OBRA

RESUMEN DEL CALENDARIO VALORIZADO PROGRAMADO DE OBRA


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE
CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAINHUANTA-AYACUCHO

PROPIETARIO

MUNICIPALIDAD DISTRITAL DE IGUAIN

CONTRATISTA

: CONSORCIO PROGRESO

LUGAR

: CHIHUA

PLAZO DE EJECUCION

: 120 DAS CALENDARIOS

FECHA DE INICIO

: 16 DE NOVIEMBRE 2015

FECHA DE TERM. PROG..

: 14 DE MARZO 2016

RESUMEN DEL CALENDARIO DE AVANCE DE OBRA PROGRAMADO


MESES
DESCRIPCION

MONTO PROGRAMADO S/.


% DE AVANCE MENSUAL DE OBRA
MONTO ACUMULADO PROGRAMADO S/.
% DE AVANCE ACUMULADO DE OBRA

NOVIEMBRE (DEL
16/11/2015 AL
30/11/2015)

DICIEMBRE 2015

ENERO 2016

FEBRERO 2016

MARZO (DEL
01/03/16 AL
14/03/16)

TOTAL

168,349.96

220,553.90

286,017.59

259,422.32

163,593.68

1,097,937.59

15.33%

20.09%

26.05%

23.63%

14.90%

100.00%

168,349.96

388,903.86

674,921.45

934,343.77

1,097,937.44

1,097,937.59

15.33%

35.42%

61.47%

85.10%

100.00%

100.00%

CUADRO COMPARATIVO DE VALORIZACIONES VS PROGRAMADO


02 DE ENERO AL 31 DE ENERO 2016
OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA
UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

PROPIETARIO
CONTRATISTA
LUGAR
PLAZO DE EJECUCION

MUNICIPALIDAD DISTRITAL DE IGUAIN


: CONSORCIO PROGRESO
: CHIHUA
: 120 DAS CALENDARIOS

FECHA DE INICIO

: 16 DE NOVIEMBRE 2015

FECHA DE TERM.PROG.

: 14 DE MARZO 2016

CUADRO COMPARATIVO DE VALORIZACIONES VS PROGRAMADO


VAL/MES
DESCRIPCION

MONTO PROGRAMADO S/.


PROGRAMADO

1,097,937.59

% DE AVANCE MENSUAL DE OBRA


% DE AVANCE ACUMULADO DE OBRA
MONTO VALORIZADO S/.

VALORIZADO

TOTAL
PRESUPUESTO

ENERO 2016

FEBRERO 2016

168,349.96

220,553.90

286,017.59

259,422.32

MARZO (DEL
01/03/16 AL
14/03/16)

TOTAL
ACUMULADO

163,593.68

1,097,937.59
100.00%

15.33%

20.09%

26.05%

23.63%

14.90%

100.00%

15.33%

35.42%

61.47%

85.10%

100.00%

1,097,937.59

168,349.96

220,553.90

228,167.03

15.33%

20.09%

20.78%

0.00%

0.00%

56.20%

15.33%

35.42%

56.20%

56.20%

56.20%

56.20%

% DE AVANCE MENSUAL DE OBRA


% DE AVANCE ACUMULADO DE OBRA

NOVIEMBRE
(DEL 16/11/2015 DICIEMBRE 2015
AL 30/11/2015)

100.00%

SALDO

100.00%
617,070.89

480,866.70

43.80%

AVANCE DE OBRA MES DE DICIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC, DISTRITO DE IGUAINHUANTA-AYACUCHO

SUBPROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA,


DISTRITO DE IGUAIN- HUANTA-AYACUCHO

PROPIETARIO

MUNICIPALIDAD DISTRITAL DE IGUAIN

CONTRATISTA

: CONSORCIO PROGRESO

LUGAR
PLAZO DE EJECUCION

: CHIHUA
: 120 DAS CALENDARIOS
: 16 DE NOVIEMBRE 2015
: 14 DE MARZO 2016

FECHA DE INICIO
FECHA DE TERMINO PROGRAMADO

AVANCE DE OBRA PROGRAMADO


MESES

INICIO

% DE AVANCE MENSUAL DE OBRA

0.00%

15.33%

20.09%

26.05%

23.63%

14.90%

% DE AVANCE ACUMULADO DE OBRA

0.00%

15.33%

35.42%

61.47%

85.10%

100.00%

NOVIEMBRE 2015 DICIEMBRE 2015 ENERO 2016 FEBRERO 2016

MARZO 2016

P O R C EN TA JE D E AVA N C E

AVANCE DE OBRA EJECUTADO


MESES

INICIO

NOVIEMBRE 2015

% DE AVANCE MENSUAL DE OBRA

0.00%

15.33%

20.09%

20.78%

% DE AVANCE ACUMULADO DE OBRA

0.00%

15.33%

35.42%

56.20%

DICIEMBRE 2015 ENERO 2016 FEBRERO 2016

MARZO 2016

0.00%

0.00%

CURVA DE AVANCE DE OBRA VS PROGRAMADO


120.00%

AM
GR
O
PR

100.00%

80.00%

60.00%

40.00%

0.00% 0.00%
0.00%

100.00%
85.10%

61.47%

O
AD
UT
C
EJE

20.00%

O
AD

56.20%

35.42%
35.42%

15.33%
15.33%

MESES
PRO GRAMADO

EJECUTADO

HOJA DE RESUMEN DE PAGO AL CONTRATISTA


PERIODO: DEL 16 DE NOVIEMBRE AL 30 DE NOVIEMBRE 2015
NOMBRE DEL PROYECTO

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTAAYACUCHO
MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTAAYACUCHO

SUBPROYECTO
ENTIDAD EJECUTORA

MUNICIPALIDAD DISTRITAL DE IGUAIN

LOCALIDAD

: CHIHUA

EJCUTOR DE OBRA

: CONSORCIO PROGRESO

RESIDENTE DE OBRA

: ING. NORMAN AFRANIO DAVILA GABRIEL

SUPERVISION

: CONSORCIO EDUCACION IGUAIN

REPRESENTANTE LEGAL

: WELMER GUTIERREZ TORRES

DESCRIPCIN

MONTO CONTRATADO

VALORIZACION
ACUMULADA
ANTERIOR

VALORIZACIN
ACTUAL

VALORIZACION
ACUMULADA

% DE AVANCE

SALDO POR
VALORIZAR

VALORIZACIN CONTRACTUAL (V)


LOCALIDAD DE
DE NUEVO
NUEVO UNION
UNION PITEC
PITEC
LOCALIDAD

SIN IGV

930,455.46

329,579.53

193,361.89

522,941.43

56.20%

407,514.03

LOCALIDAD DE NUEVO UNION PITEC

CON IGV

1,097,937.44

388,903.84

228,167.03

617,070.88

56.20%

480,866.56

930,455.46

329,579.53

193,361.89

522,941.43

56.20%

407,514.03

56.20%

43.80%

TOTAL
PORCENTAJE DE AVANCE OBRA
REAJUSTES (R)
Valorizacion N 01 (Mes de Noviembre 2015)

Valorizacion N 02 (Mes de Setiembre)

Valorizacion N 03 (Mes de Octubre)

Valorizacion N 04 (Mes deNoviembre)

Valorizacion N 05 (Mes de Diciembre)

TOTAL DE REAJUSTES
VALORIZACION BRUTA VB = (V + R)

329,579.53

193,361.89

522,941.43

407,514.03

AMORTIZACIONES (A)
Am. Adelanto Efectivo

Am. Adelanto Materiales

TOTAL AMORTIZACIONES

VALORIZACIN NETA VN = VB - A

329,579.53

193,361.89

522,941.43

407,514.03

FONDO DE GARANTIA (FG)


Garantia de Fiel Cumplimiento 10%
Garantia de Fiel Cumplimiento 10% con IGV

32,957.95
5,932.43

MULTAS (M)
Multas por Retrazo de Obra

MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO (VN - FG - M)

296,621.57

193,361.89

522,941.43

53,391.88

34,805.14

94,129.46

73,352.53

MONTO TOTAL CON IGV

350,013.46

228,167.03

617,070.89

480,866.56

TOTAL DEL COMPROMISO

350,013.46

228,167.03

617,070.89

480,866.56

EN IGV 18%

407,514.03

MONTO POR FACTURAR DEL CONTRATISTA


MES DE DICIEMBRE DEL 2015
CONTRATO

N 164-2015-MDI/GM

CONTRATISTA

: CONSORCIO PROGRESO

OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS


INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE
CHIHUA Y N429-115 EN LA COMUNIDAD DE NUEVA UNION PITEC, DISTRITO DE
IGUAIN- HUANTA-AYACUCHO

PRESUPUESTO

S/. 1,097,937.44

LOCALIDAD

: CHIHUA

VALORIZACION DE OBRA N 01 - MES DE NOVIEMBRE 2015


CONCEPTO

A.-

B.-

Monto Valorizado en el presente periodo


Valorizacion N 01

Reajuste de las valorizaciones


Reajuste de la Valorizacion N 02
Reintegro por Factores de Liquidacion "F" y "V"

Reintegro por Factores de Liquidacion "F"


Reintegro por Factores de Liquidacion "V"
C.-

D.-

E.-

F.E.-

Deduccion del reajuste que no corresponde

S/.
228,167.03

228,167.03

Por Adelanto en Efectivo

Por Adelanto especifico para Materiales N 01 Valor. N 01

Amortizacion del Adelanto en Efectivo


En la Valorizacion N 01

Amortizacion del Adelanto de Materiales


Amort. Adelanto Especifico de Materiales

Retencion de fiel cumplimiento

Otros

Otros

I.-

MONTO FACTURABLE (sin IGV)

193,361.89

II.-

TOTAL RETENCIONES

III.-

MONTO NETO A PAGAR (I+II)

193,361.89

IV

I.G.V. (18% DE III)

34,805.14

V.-

MONTO A FACTURAR

(III + IV)

228,167.03

METRADO DEL MES DE DICIEMBRE 2


Item

Descripcin

I.E.I.P. N 429-114 DE CHIHUA

01

INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO

01.01
01.01.03

Und.

METRADO

Parcial S/.

CONSTRUCCION 01 AULA, SALA DE USOS MULTIPLE, DEPOS. DE MAT. EDUCATIVO Y SS.HH. NIOS, NIAS
CONCRETO SIMPLE

01.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

36.77

2,185.98

01.01.03.04

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

3.57

1,224.01

01.01.04

OBRAS DE CONCRETO ARMADO

01.01.04.06

COLUMNAS ENCOFRADO Y DESENCOFRADO

m2

73.50

4,813.52

01.01.04.08

COLUMNAS CONCRETO F'C= 210 KG/CM2

m3

5.69

3,748.23

01.01.04.09

COLUMNETAS CONCRETO F'C= 175 KG/CM2

m3

2.75

1,364.03

01.01.04.10

VIGAS ENCOFRADO Y DESENCOFRADO

m2

197.41

14,152.32

01.01.04.11

VIGAS ACERO FY=4200 KG/CM2

kg

2,317.11

10,427.00

01.01.04.12

VIGAS CONCRETO F'C=210KG/CM2

m3

17.66

11,032.56

01.01.04.13

VIGAS CONCRETO F'C=175KG/CM2

m3

0.59

292.65

01.01.04.14

LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO

m2

243.84

17,188.28

01.01.04.15

LOSAS ALIGERADAS LADRILLO HUECO DE ARCILLA 15X30X30 CM

und

2,031.22

7,881.13

01.01.04.16

LOSAS ALIGERADAS ACERO FY=4200 KG/CM2

kg

1,445.65

6,505.43

01.01.04.17

LOSAS ALIGERADAS CONCRETO F'C= 210 KG/CM2

m3

21.34

11,953.81

01.01.05

MUROS Y TABIQUES DE ALBAILERIA

01.01.05.02

MURO DE SOGA LADRILLO K.K. 9X13X24

m2

73.11

5,067.25

01.01.05.04

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

8.43

415.43

m2

39.38

48.83

m2

59.28

73.51

01.02
01.02.01
01.02.01.02
01.03
01.03.01
01.03.01.02
01.03.02

CONSTRUCCION DIRECCION Y TOPICO-PSICOLOGIA


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO
CONSTRUCCION COCINA - DEPOSITO DE ALIMENTOS, CUARTO DE LIMPIEZA Y SS.HH.
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS

01.03.02.01

REFINE Y PERFILADO DEL TERRENO

m2

59.28

1,247.84

01.03.02.02

EXCAVACION DE TERRENO PARA ZAPATAS HASTA 1.70 M.

m3

20.16

612.26

01.03.02.03

EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

11.69

355.03

01.03.02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

12.13

488.23

01.03.02.05

ELIMINACIN DE MATERIAL EXCEDENTE

m3

24.66

329.70

01.03.02.06

NIVELACION Y COMPACTADO DE SUB-BASE

m2

52.18

136.71

01.03.02.07

RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO

m2

52.18

600.07

01.03.03

CONCRETO SIMPLE

01.03.03.01

SOLADO PARA ZAPATA ( e= 0.10 m) MEZCLA C:H 1:10

m2

13.44

604.80

01.03.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.

m3

4.22

1,284.19

01.03.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

48.66

2,892.84

01.03.03.04

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

10.73

3,678.89

01.03.03.07

FALSO PISO DE 4" DE CONCRETO 1:8

m2

25.10

1,097.87
3,660.99

01.03.04

OBRAS DE CONCRETO ARMADO

01.03.04.01

ZAPATAS CONCRETO F'C=210 KG/CM2

m3

6.72

01.03.04.02

ZAPATAS ACERO FY=4200 KG/CM2

kg

198.40

892.80

01.03.04.03

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

m2

21.44

1,274.61

01.03.04.04

VIGAS DE CIMENTACION ACERO FY=4200 KG/CM2

kg

336.00

1,512.00

01.03.04.05

VIGAS DE CIMENTACION CONCRETO F'C=175KG/CM2

m3

2.68

1,329.31

01.03.04.07

COLUMNAS ACERO FY=4200 KG/CM2

kg

633.89

2,852.51

m2

50.20

62.25

01.07
01.07.01
01.07.01.01
01.07.02

CONSTRUCCION CERCO PERIMETRICO


TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS

01.07.02.01

EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

63.87

1,939.63

01.07.02.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

16.43

661.17

01.07.02.03

ELIMINACIN DE MATERIAL EXCEDENTE

m3

59.30

792.84

01.07.03

CONCRETO SIMPLE

01.07.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.

m3

40.16

12,221.09

01.07.03.02

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

129.60

7,704.72

01.07.03.03

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

8.21

2,816.02

kg

710.19

3,195.84

01.07.04
01.07.04.02
01.10
01.10.01

OBRAS DE CONCRETO ARMADO


COLUMNAS ACERO FY=4200 KG/CM2
OBRAS GENERALES
OBRAS PROVISIONALES

01.10.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 4.80M

und

1.00

1,008.40

01.10.01.03

POZA DE ALBAILERIA 3x3x1.20m CAP. 9.0m3 INC/TARRAJEO IMPERMEABILIZANTE

und

1.00

2,961.21

Pagina 12 de 27

S DE DICIEMBRE 2015
PORCENTAJE

50.00%
50.00%
50.00%
50.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
66.67%
33.33%

100.00%
100.00%

Pagina 13 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

OBRA

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

I.E.I.P. N 429-114 DE CHIHUA

01

INFRAESTRUCTURA EDUCATIVA Y EQUIPAMIENTO

01.01
01.01.01

Metrado

Precio S/.

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

745390.63
322217.93

CONSTRUCCION 01 AULA, SALA DE USOS MULTIPLE, DEPOS. DE MAT. EDUCATIVO Y SS.HH. NIOS, NIAS

672.94

TRABAJOS PRELIMINARES

01.01.01.01

LIMPIEZA DE TERRENO MANUAL

m2

255.87

1.39

355.66

0.00

0.00

0.00%

255.87

355.66

100.00%

255.87

355.66

100.00%

0.00

0.00

0.00%

01.01.01.02

TRAZO Y REPLANTEO DURANTE EL PROCESO

m2

255.87

1.24

317.28

0.00

0.00

0.00%

255.87

317.28

100.00%

255.87

317.28

100.00%

0.00

0.00

0.00%

01.01.02

16421.44

MOVIMIENTO DE TIERRAS

01.01.02.01

REFINE Y PERFILADO DEL TERRENO

m2

355.87

21.05

7491.06

0.00

0.00

0.00%

355.87

7,491.06

100.00%

355.87

7,491.06

100.00%

0.00

0.00

0.00%

01.01.02.02

EXCAVACION DE TERRENO PARA ZAPATAS HASTA 1.70 M.

m3

57.78

30.37

1754.78

0.00

0.00

0.00%

57.78

1,754.78

100.00%

57.78

1,754.78

100.00%

0.00

0.00

0.00%

01.01.02.03

EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

39.15

30.37

1188.99

0.00

0.00

0.00%

39.15

1,188.99

100.00%

39.15

1,188.99

100.00%

0.00

0.00

0.00%

01.01.02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

39.54

40.25

1591.49

0.00

0.00

0.00%

39.54

1,591.49

100.00%

39.54

1,591.49

100.00%

0.00

0.00

0.00%

01.01.02.05

ELIMINACIN DE MATERIAL EXCEDENTE

m3

85.3

13.37

1140.46

0.00

0.00

0.00%

85.30

1,140.46

100.00%

85.30

1,140.46

100.00%

0.00

0.00

0.00%

01.01.02.06

NIVELACION Y COMPACTADO DE SUB-BASE

m2

230.5

2.62

603.91

0.00

0.00

0.00%

230.50

603.91

100.00%

230.50

603.91

100.00%

0.00

0.00

0.00%

01.01.02.07

RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO

m2

230.5

11.5

2650.75

0.00

0.00

0.00%

230.50

2,650.75

100.00%

230.50

2,650.75

100.00%

0.00

0.00

0.00%
0.00%

01.01.03

22522.61

CONCRETO SIMPLE

01.01.03.01

SOLADO PARA ZAPATA ( e= 0.10 m) MEZCLA C:H 1:10

m2

51.67

45

2325.15

0.00

0.00

0.00%

51.67

2,325.15

100.00%

51.67

2,325.15

100.00%

0.00

0.00

01.01.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.

m3

16.97

304.31

5164.14

0.00

0.00

0.00%

16.97

5,164.14

100.00%

16.97

5,164.14

100.00%

0.00

0.00

0.00%

01.01.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

73.54

59.45

4371.95

0.00

0.00

0.00%

36.77

2,185.98

50.00%

36.77

2,185.98

50.00%

36.77

2,185.98

50.00%

01.01.03.04

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

7.14

342.86

2448.02

0.00

0.00

0.00%

3.57

1,224.01

50.00%

3.57

1,224.01

50.00%

3.57

1,224.01

50.00%

01.01.03.05

CANALETA DE EVACUACION PLUVIAL ENCOFRADO Y DESENCOFRADO

m2

11.01

48.13

529.91

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.01

529.91

100.00%

01.01.03.06

CANALETA DE EVACUACION PLUVIAL F'C=175KG/CM2

01.01.03.07

FALSO PISO DE 4" DE CONCRETO 1:8

01.01.04

18.35

47.2

866.12

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

18.35

866.12

100.00%

m2

155.86

43.74

6817.32

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

155.86

6,817.32

100.00%

138134.08

OBRAS DE CONCRETO ARMADO

01.01.04.01

ZAPATAS CONCRETO F'C=210 KG/CM2

m3

22.08

544.79

12028.96

0.00

0.00

0.00%

22.08

12,028.96

100.00%

22.08

12,028.96

100.00%

0.00

0.00

0.00%

01.01.04.02

ZAPATAS ACERO FY=4200 KG/CM2

kg

605.44

4.5

2724.48

0.00

0.00

0.00%

605.44

2,724.48

100.00%

605.44

2,724.48

100.00%

0.00

0.00

0.00%

01.01.04.03

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

m2

70.61

59.45

4197.76

0.00

0.00

0.00%

70.61

4,197.76

100.00%

70.61

4,197.76

100.00%

0.00

0.00

0.00%

01.01.04.04

VIGAS DE CIMENTACION ACERO FY=4200 KG/CM2

kg

1258.11

4.5

5661.5

0.00

0.00

0.00%

1,258.11

5,661.50

100.00%

1,258.11

5,661.50

100.00%

0.00

0.00

0.00%

01.01.04.05

VIGAS DE CIMENTACION CONCRETO F'C=210KG/CM2

m3

8.03

624.72

5016.5

0.00

0.00

0.00%

8.03

5,016.50

100.00%

8.03

5,016.50

100.00%

0.00

0.00

0.00%

01.01.04.06

COLUMNAS ENCOFRADO Y DESENCOFRADO

m2

147

65.49

9627.03

0.00

0.00

0.00%

73.50

4,813.52

50.00%

73.50

4,813.52

50.00%

73.50

4,813.52

50.00%

01.01.04.07

COLUMNAS ACERO FY=4200 KG/CM2

kg

2352.04

4.5

10584.18

0.00

0.00

0.00%

2,352.04

10,584.18

100.00%

2,352.04

10,584.18

100.00%

0.00

0.00

0.00%

01.01.04.08

COLUMNAS CONCRETO F'C= 210 KG/CM2

m3

11.38

658.74

7496.46

0.00

0.00

0.00%

5.69

3,748.23

50.00%

5.69

3,748.23

50.00%

5.69

3,748.23

50.00%

01.01.04.09

COLUMNETAS CONCRETO F'C= 175 KG/CM2

m3

2.75

496.01

1364.03

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.75

1,364.03

100.00%

01.01.04.10

VIGAS ENCOFRADO Y DESENCOFRADO

m2

197.41

71.69

14152.32

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

197.41

14,152.32

100.00%

01.01.04.11

VIGAS ACERO FY=4200 KG/CM2

kg

2317.11

4.5

10427

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2,317.11

10,427.00

100.00%

01.01.04.12

VIGAS CONCRETO F'C=210KG/CM2

m3

17.66

624.72

11032.56

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

17.66

11,032.56

100.00%

01.01.04.13

VIGAS CONCRETO F'C=175KG/CM2

m3

0.59

496.01

292.65

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.59

292.65

100.00%

01.01.04.14

LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO

m2

243.84

70.49

17188.28

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

243.84

17,188.28

100.00%

01.01.04.15

LOSAS ALIGERADAS LADRILLO HUECO DE ARCILLA 15X30X30 CM

und

2031.22

3.88

7881.13

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2,031.22

7,881.13

100.00%

01.01.04.16

LOSAS ALIGERADAS ACERO FY=4200 KG/CM2

kg

1445.65

4.5

6505.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1,445.65

6,505.43

100.00%

01.01.04.17

LOSAS ALIGERADAS CONCRETO F'C= 210 KG/CM2

m3

21.34

560.16

11953.81

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

21.34

11,953.81

100.00%

10,177.12

100.00%

89.54

10,177.12

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

73.11

5,067.25

100.00%

01.01.05

15726.14

MUROS Y TABIQUES DE ALBAILERIA

01.01.05.01

MURO DE CABEZA LADRILLO K.K. 9X13X24

m2

89.54

113.66

10177.12

0.00

0.00

0.00%

01.01.05.02

MURO DE SOGA LADRILLO K.K. 9X13X24

m2

73.11

69.31

5067.25

0.00

0.00

0.00%

01.01.05.03

ALAMBRE N 8 REFUERZO HORIZONTAL EN MUROS

kg

13.82

4.8

66.34

0.00

0.00

0.00%

66.34

100.00%

13.82

66.34

100.00%

0.00

0.00

0.00%

01.01.05.04

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

8.43

49.28

415.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.43

415.43

100.00%

m2

278.96

52.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

278.96

14,709.56

100.00%

01.01.06
01.01.06.01

13.82

15287.48

COBERTURA
COBERTURA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

89.54

14709.56

Pagina 14 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

01.01.06.02
01.01.07

CUMBRERA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

Metrado

Precio S/.

24.09

23.99

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Parcial S/.

577.92

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

24.09

577.92

100.00%

30453.97

REVOQUES, ENLUCIDOS Y MOLDURAS

01.01.07.01

TARRAJEO EN MURO INTERIOR Y EXTERIOR C:A 1:5, E=1.50CM

m2

356.77

25.24

9004.87

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

356.77

9,004.87

100.00%

01.01.07.02

TARRAJEO PRIMARIO MORTERO 1:5

m2

35.54

25.24

897.03

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

35.54

897.03

100.00%

01.01.07.03

TARRAJEO EN SUPERFICIE DE COLUMNAS C:A 1:5, E=1.50CM

m2

84.76

32.2

2729.27

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

84.76

2,729.27

100.00%

01.01.07.04

TARRAJEO EN SUPERFICIE DE VIGAS C:A 1:5, E=1.50CM

m2

168.05

32.2

5411.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

168.05

5,411.21

100.00%

01.01.07.05

VESTIDURA DE DERRAMES C:A 1:5, E=1.50CM

104.13

9.94

1035.05

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

104.13

1,035.05

100.00%

01.01.07.06

TARRAJEO DE CIELO RASO CON MEZCLA DE CEMENTO ARENA 1:5

m2

229.02

42.4

9710.45

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

229.02

9,710.45

100.00%

01.01.07.07

BRUAS

383.01

4.35

1666.09

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

383.01

1,666.09

100.00%

01.01.08

14869.56

PISOS Y PAVIMENTOS

01.01.08.01

PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR

m2

141.86

42.48

6026.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

141.86

6,026.21

100.00%

01.01.08.02

ENCOFRADO Y DESENCOFRADO PARA VEREDAS, PISTAS

m2

8.32

44.75

372.32

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.32

372.32

100.00%

01.01.08.03

VEREDAS DE CONCRETO F'C=175 KG/CM2

m3

12.28

487.62

5987.97

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.28

5,987.97

100.00%

01.01.08.04

CONTRAPISO DE 48 MM

m2

14

35.61

498.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

14.00

498.54

100.00%

01.01.08.05

PISO DE CERAMICO DE 30X30CM ANTIDESLIZANTE

m2

14

64.87

908.18

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

14.00

908.18

100.00%

01.01.08.06

JUNTAS ASFALTICAS

134.04

8.03

1076.34

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

134.04

1,076.34

100.00%

01.01.09

3775.13

ZOCALOS Y CONTRAZOCALOS

01.01.09.01

CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

71.5

10.67

762.91

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

71.50

762.91

100.00%

01.01.09.02

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

67.97

12.96

880.89

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

67.97

880.89

100.00%

01.01.09.03

ZOCALO DE MAYOLICA BLANCA DE 20x30 CM

m2

35.54

59.97

2131.33

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

35.54

2,131.33

100.00%

01.01.10

CARPINTERIA DE MADERA

01.01.10.01

PUERTA C/TABLEROS DE MADERA TORNILLO

m2

11.28

554.59

6255.78

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.28

6,255.78

100.00%

01.01.10.02

VENTANA DE MADERA TORNILLO

m2

42.8

330.04

14125.71

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

42.80

14,125.71

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.20

404.33

100.00%

01.01.11
01.01.11.01
01.01.12

404.33

CARPINTERIA METALICA
REJILLA DE FIERRO EN CUNETA PLUVIAL

4.2

96.27

404.33
5249.16

CERRAJERIA

01.01.12.01

BISAGRA ALUMINIZADA PESADA DE 4"

pza

28

17.82

498.96

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

28.00

498.96

100.00%

01.01.12.02

BISAGRA ALUMINIZADA PESADA DE 2.5"

pza

176

15.92

2801.92

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

176.00

2,801.92

100.00%

01.01.12.03

CERRADURA PARA PUERTA DOS GOLPES

pza

92.71

556.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

556.26

100.00%

01.01.12.04

CERROJO DE SEGURIDAD PARA VENTANAS

und

88

13.82

1216.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

88.00

1,216.16

100.00%

01.01.12.05

MANIJA DE 4" PARA PUERTAS

und

29.31

175.86

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

175.86

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

460.54

2,542.18

100.00%

01.01.13
01.01.13.01
01.01.14

2542.18

VIDRIOS
VIDRIOS SEMIDOBLES

p2

460.54

5.52

2542.18
16316.73

PINTURA

01.01.14.01

PINTURA AL OLEO 2 MANOS EN INTERIORES Y EXTERIORES

m2

373.43

12.05

4499.83

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

373.43

4,499.83

100.00%

01.01.14.02

PINTURA EN VIGAS Y COLUMNAS

m2

252.81

20.93

5291.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

252.81

5,291.31

100.00%

01.01.14.03

PINTURA LATEX 2 MANOS EN CIELO RASO

m2

229.02

12.94

2963.52

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

229.02

2,963.52

100.00%

01.01.14.04

PINTURA BARNIZ EN CARPINTERIA DE MADERA

m2

108.16

22.37

2419.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

108.16

2,419.54

100.00%

01.01.14.05

PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO

139.47

3.34

465.83

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

139.47

465.83

100.00%

01.01.14.06

PINTURA ESMALTE EN JUNTAS DE CIELO RASO

215.51

3.14

676.7

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

215.51

676.70

100.00%

01.01.15

1494.64

VARIOS

01.01.15.01

PIZARRA ACRILICA 4m X 1.4m

und

569.49

1138.98

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

1,138.98

100.00%

01.01.15.02

LIMPIEZA PERMANENTE DE OBRA

m2

255.87

1.39

355.66

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

255.87

355.66

100.00%

01.01.16

4479.54

SISTEMA DE EVACUACION PLUVIAL

01.01.16.01

CANALETA DE EVACUACION PLUVIAL

48.18

69.09

3328.76

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

48.18

3,328.76

100.00%

01.01.16.02

TUBERIA DE PVC-SAL 4"

21.96

21.22

465.99

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

21.96

465.99

100.00%

01.01.16.03

ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL

pto

93.91

375.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

375.64

100.00%

Pagina 15 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

Metrado

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Precio S/.

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

01.01.16.04

ENCOFRADO Y DESENCOFRADO EN DADO DE CONCRETO

m2

3.9

44.75

174.53

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.90

174.53

100.00%

01.01.16.05

CONCRETO F'C= 140 KG/CM2 EN DADO DE CONCRETO

m3

0.3

448.73

134.62

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.30

134.62

100.00%

01.01.17

1601.86

SISTEMA DE AGUA FRIA


pto

54.3

488.7

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

9.00

488.70

100.00%

16.2

11.65

188.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

16.20

188.73

100.00%

REDUCCION PVC DE 1" A 3/4"

pza

18.73

18.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

18.73

100.00%

01.01.17.04

REDUCCION PVC DE 3/4" A 1/2"

pza

18.38

18.38

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

18.38

100.00%

01.01.17.05

CODO PVC 1/2" x 90

pza

10

22.67

226.7

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.00

226.70

100.00%

01.01.17.06

TEE DE 1/2'' PVC

pza

22.83

91.32

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

91.32

100.00%

01.01.17.07

VALVULAS DE COMPUERTA DE BRONCE DE 1/2"

pza

97.74

293.22

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

293.22

100.00%

01.01.17.08

GRIFO CROMADO DE 1/2"

und

69.02

276.08

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

276.08

100.00%

01.01.17.01

SALIDA DE AGUA DURA CON TUBERIA PVC CLASE 10 DE 1/2"

01.01.17.02

TUBERIA PVC CLASE 10 DE 1/2"

01.01.17.03

01.01.18

4521.73

INSTALACIONES SANITARIAS

01.01.18.01

INODORO BLANCO TANQUE BAJO PARA NIOS

pza

231.09

924.36

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

924.36

100.00%

01.01.18.02

LAVADERO CORRIDO CON MAYOLICA DE 20x20 CM

und

869.86

869.86

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

869.86

100.00%

01.01.18.03

URINARIO CORRIDO CON MAYOLICA DE 20x20 CM

und

185.85

185.85

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

185.85

100.00%

01.01.18.04

SALIDA DE DESAGUE EN PVC-SAL 4''

pto

95.18

380.72

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

380.72

100.00%

01.01.18.05

SALIDA DE DESAGUE EN PVC-SAL 2"

pto

45.16

90.32

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

90.32

100.00%

01.01.18.06

SALIDA DE VENTILACION PVC-SAL 2"

pto

93.12

186.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

186.24

100.00%

01.01.18.07

EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE PVC DE 2" Y 4"

m3

4.22

36.12

152.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.22

152.43

100.00%

01.01.18.08

RED DE DISTRIBUCION TUBERIA PVC SAL 2"

15.1

13.54

204.45

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

15.10

204.45

100.00%

01.01.18.09

RED DE DISTRIBUCION TUBERIA PVC SAL 4"

12.5

14.08

176

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.50

176.00

100.00%

01.01.18.10

CODO PVC SAL 2"X45

pza

22.77

182.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.00

182.16

100.00%

01.01.18.11

CODO PVC SAL 4"X45

pza

33.03

165.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.00

165.15

100.00%

01.01.18.12

YEE PVC-SAL 4"

pza

29.01

87.03

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

87.03

100.00%

01.01.18.13

YEE PVC SAL 4"X2"

pza

26.36

26.36

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

26.36

100.00%

01.01.18.14

SUMIDERO DE BRONCE 2"

und

76.12

304.48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

304.48

100.00%

01.01.18.15

REGISTRO DE BRONCE DE 4"

pza

88.31

441.55

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.00

441.55

100.00%

01.01.18.16

CAJAS DE REGISTRO 12'' x 24''

und

144.77

144.77

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

144.77

100.00%

01.01.19

7362.92

INSTALACIONES ELECTRICAS

01.01.19.01

SALIDA DE TECHO (CENTRO DE LUZ)-1

pto

15

114.36

1715.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

15.00

1,715.40

100.00%

01.01.19.02

SALIDA DE CENTRO DE ALUMBRADO EMPOTRADO-1

pto

114.36

686.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

686.16

100.00%

01.01.19.03

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

12

76.54

918.48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.00

918.48

100.00%

01.01.19.04

SALIDA DE PARED P/INTERRUPTOR DOBLE-1

pto

85.42

170.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

170.84

100.00%

01.01.19.05

SALIDA DE PARED P/INTERRUPTOR SIMPLE-1

pto

69.77

209.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

209.31

100.00%

01.01.19.06

TABLERO TD-1

pza

993

993

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

993.00

100.00%

01.01.19.07

LAMPARAS CON REJILLAS Y FLUORESCENTE 3x40W

und

12

129.41

1552.92

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.00

1,552.92

100.00%

01.01.19.08

LAMPARAS CON REJILLAS Y FLUORESCENTE 2x20W

und

121.85

365.55

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

365.55

100.00%

01.01.19.09

LAMPARAS CON MARCO DE ALUMINIO Y FLUORESCENTE 2x20W

und

125.21

751.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

751.26

100.00%

01.02
01.02.01

90082.69

CONSTRUCCION DIRECCION Y TOPICO-PSICOLOGIA

103.57

TRABAJOS PRELIMINARES

01.02.01.01

LIMPIEZA DE TERRENO MANUAL

m2

39.38

1.39

54.74

0.00

0.00

0.00%

54.74

100.00%

39.38

54.74

100.00%

0.00

0.00

0.00%

01.02.01.02

TRAZO Y REPLANTEO DURANTE EL PROCESO

m2

39.38

1.24

48.83

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

39.38

48.83

100.00%

01.02.02

39.38

3459.3

MOVIMIENTO DE TIERRAS

01.02.02.01

REFINE Y PERFILADO DEL TERRENO

m2

39.38

21.05

828.95

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

39.38

828.95

100.00%

01.02.02.02

EXCAVACION DE TERRENO PARA ZAPATAS HASTA 1.70 M.

m3

20.16

30.37

612.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.16

612.26

100.00%

01.02.02.03

EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

12.2

30.37

370.51

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.20

370.51

100.00%

01.02.02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

14.42

40.25

580.41

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

14.42

580.41

100.00%

Pagina 16 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

16/11/15 AL 30/11/15

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS


AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

ANTERIOR

Descripcin
Und.

Metrado

Precio S/.

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

01.02.02.05

ELIMINACIN DE MATERIAL EXCEDENTE

m3

22.43

13.37

299.89

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

22.43

299.89

100.00%

01.02.02.06

NIVELACION Y COMPACTADO DE SUB-BASE

m2

54.34

2.62

142.37

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

54.34

142.37

100.00%

01.02.02.07

RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO

m2

54.34

11.5

624.91

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

54.34

624.91

100.00%

01.02.03

9658.76

CONCRETO SIMPLE

01.02.03.01

SOLADO PARA ZAPATA ( e= 0.10 m) MEZCLA C:H 1:10

m2

13.44

45

604.8

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

13.44

604.80

100.00%

01.02.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.

m3

3.76

304.31

1144.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.76

1,144.21

100.00%

01.02.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

43.38

59.45

2578.94

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

43.38

2,578.94

100.00%

01.02.03.04

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

4.33

342.86

1484.58

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.33

1,484.58

100.00%

01.02.03.05

CANALETA DE EVACUACION PLUVIAL ENCOFRADO Y DESENCOFRADO

m2

11.85

48.13

570.34

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.85

570.34

100.00%

01.02.03.06

CANALETA DE EVACUACION PLUVIAL F'C=175KG/CM2

39.5

47.2

1864.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

39.50

1,864.40

100.00%

01.02.03.07

FALSO PISO DE 4" DE CONCRETO 1:8

m2

32.27

43.74

1411.49

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

32.27

1,411.49

100.00%

01.02.04

36613.44

OBRAS DE CONCRETO ARMADO

01.02.04.01

ZAPATAS CONCRETO F'C=210 KG/CM2

m3

6.72

544.79

3660.99

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.72

3,660.99

100.00%

01.02.04.02

ZAPATAS ACERO FY=4200 KG/CM2

kg

198.4

4.5

892.8

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

198.40

892.80

100.00%

01.02.04.03

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

m2

23.92

59.45

1422.04

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

23.92

1,422.04

100.00%

01.02.04.04

VIGAS DE CIMENTACION ACERO FY=4200 KG/CM2

kg

265.15

4.5

1193.18

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

265.15

1,193.18

100.00%

01.02.04.05

VIGAS DE CIMENTACION CONCRETO F'C=175KG/CM2

m3

4.59

496.01

2276.69

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.59

2,276.69

100.00%

01.02.04.06

COLUMNAS ENCOFRADO Y DESENCOFRADO

m2

47.06

65.49

3081.96

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

47.06

3,081.96

100.00%

01.02.04.07

COLUMNAS ACERO FY=4200 KG/CM2

kg

653.75

4.5

2941.88

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

653.75

2,941.88

100.00%

01.02.04.08

COLUMNAS CONCRETO F'C= 210 KG/CM2

m3

3.29

658.74

2167.25

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.29

2,167.25

100.00%

01.02.04.09

COLUMNETAS CONCRETO F'C= 175 KG/CM2

m3

0.46

496.01

228.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.46

228.16

100.00%

01.02.04.10

VIGAS ENCOFRADO Y DESENCOFRADO

m2

46.34

71.69

3322.11

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

46.34

3,322.11

100.00%

01.02.04.11

VIGAS ACERO FY=4200 KG/CM2

kg

719.59

4.5

3238.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

719.59

3,238.16

100.00%

01.02.04.12

VIGAS CONCRETO F'C=210KG/CM2

m3

5.12

624.72

3198.57

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.12

3,198.57

100.00%

01.02.04.13

LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO

m2

52.47

70.49

3698.61

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

52.47

3,698.61

100.00%

01.02.04.14

LOSAS ALIGERADAS LADRILLO HUECO DE ARCILLA 15X30X30 CM

und

437.27

3.88

1696.61

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

437.27

1,696.61

100.00%

01.02.04.15

LOSAS ALIGERADAS ACERO FY=4200 KG/CM2

kg

227.4

4.5

1023.3

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

227.40

1,023.30

100.00%

01.02.04.16

LOSAS ALIGERADAS CONCRETO F'C= 210 KG/CM2

m3

4.59

560.16

2571.13

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.59

2,571.13

100.00%

01.02.05

4284.23

MUROS Y TABIQUES DE ALBAILERIA

01.02.05.01

MURO DE CABEZA LADRILLO K.K. 9X12X23

m2

33.57

99.33

3334.51

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

33.57

3,334.51

100.00%

01.02.05.02

MURO DE SOGA LADRILLO K.K. 9X12X23

m2

11.88

62.23

739.29

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.88

739.29

100.00%

01.02.05.03

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

4.27

49.28

210.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.27

210.43

100.00%

01.02.06

3635.94

COBERTURA

01.02.06.01

COBERTURA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

m2

64.7

52.73

3411.63

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

64.70

3,411.63

100.00%

01.02.06.02

CUMBRERA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

9.35

23.99

224.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

9.35

224.31

100.00%

01.02.07

6985.02

REVOQUES, ENLUCIDOS Y MOLDURAS

01.02.07.01

TARRAJEO EN MURO INTERIOR Y EXTERIOR C:A 1:5, E=1.50CM

m2

97.26

25.24

2454.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

97.26

2,454.84

100.00%

01.02.07.02

TARRAJEO PRIMARIO MORTERO 1:5

m2

4.48

25.24

113.08

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.48

113.08

100.00%

01.02.07.03

TARRAJEO EN SUPERFICIE DE COLUMNAS C:A 1:5, E=1.50CM

m2

32.48

32.2

1045.86

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

32.48

1,045.86

100.00%

01.02.07.04

TARRAJEO EN SUPERFICIE DE VIGAS C:A 1:5, E=1.50CM

m2

21.07

32.2

678.45

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

21.07

678.45

100.00%

01.02.07.05

VESTIDURA DE DERRAMES C:A 1:5, E=1.50CM

17.71

9.94

176.04

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

17.71

176.04

100.00%

01.02.07.06

TARRAJEO DE CIELO RASO CON MEZCLA DE CEMENTO ARENA 1:5

m2

52.47

42.4

2224.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

52.47

2,224.73

100.00%

01.02.07.07

BRUAS

67.13

4.35

292.02

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

67.13

292.02

100.00%

01.02.08

3314.51

PISOS Y PAVIMENTOS

01.02.08.01

PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR

m2

32.27

42.48

1370.83

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

32.27

1,370.83

100.00%

01.02.08.02

ENCOFRADO Y DESENCOFRADO PARA VEREDAS, PISTAS

m2

3.13

44.75

140.07

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.13

140.07

100.00%

01.02.08.03

VEREDAS DE CONCRETO F'C=175 KG/CM2

m3

3.6

487.62

1755.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.60

1,755.43

100.00%

Pagina 17 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

01.02.08.04
01.02.09

JUNTAS ASFALTICAS

Precio S/.

8.03

CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

01.02.09.02

ZOCALO DE MAYOLICA BLANCA DE 20x30 CM

NOVIEMBRE 2,015

Parcial S/.

48.18

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

48.18

100.00%

521.55

ZOCALOS Y CONTRAZOCALOS

01.02.09.01
01.02.10

Metrado

MES:
120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

23.7

10.67

252.88

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

23.70

252.88

100.00%

m2

4.48

59.97

268.67

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.48

268.67

100.00%

7086.55

CARPINTERIA DE MADERA

01.02.10.01

PUERTA C/TABLEROS DE MADERA TORNILLO

m2

3.78

554.59

2096.35

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.78

2,096.35

100.00%

01.02.10.02

VENTANA DE MADERA TORNILLO

m2

15.12

330.04

4990.2

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

15.12

4,990.20

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.20

404.33

100.00%

01.02.11
01.02.11.01
01.02.12

404.33

CARPINTERIA METALICA
REJILLA DE FIERRO EN CUNETA PLUVIAL

4.2

96.27

404.33
1847.72

CERRAJERIA

01.02.12.01

BISAGRA ALUMINIZADA PESADA DE 4"

pza

17.82

142.56

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.00

142.56

100.00%

01.02.12.02

BISAGRA ALUMINIZADA PESADA DE 2.5"

pza

64

15.92

1018.88

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

64.00

1,018.88

100.00%

01.02.12.03

CERRADURA PARA PUERTA DOS GOLPES

pza

92.71

185.42

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

185.42

100.00%

01.02.12.04

CERROJO DE SEGURIDAD PARA VENTANAS

und

32

13.82

442.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

32.00

442.24

100.00%

01.02.12.05

MANIJA DE 4" PARA PUERTAS

und

29.31

58.62

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

58.62

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

162.67

897.94

100.00%

01.02.13
01.02.13.01
01.02.14

897.94

VIDRIOS
VIDRIOS SEMIDOBLES

p2

162.67

5.52

897.94
3455.19

PINTURA

01.02.14.01

PINTURA AL OLEO 2 MANOS EN INTERIORES Y EXTERIORES

m2

153.65

12.05

1851.48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

153.65

1,851.48

100.00%

01.02.14.02

PINTURA LATEX 2 MANOS EN CIELO RASO

m2

52.47

12.94

678.96

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

52.47

678.96

100.00%

01.02.14.03

PINTURA BARNIZ EN CARPINTERIA DE MADERA

m2

37.8

22.37

845.59

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

37.80

845.59

100.00%

01.02.14.04

PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO

23.7

3.34

79.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

23.70

79.16

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

39.38

54.74

100.00%

01.02.15
01.02.15.01
01.02.16

54.74

VARIOS
LIMPIEZA PERMANENTE DE OBRA

m2

39.38

1.39

54.74
2388.44

SISTEMA DE EVACUACION PLUVIAL

01.02.16.01

CANALETA DE EVACUACION PLUVIAL

18.7

69.09

1291.98

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

18.70

1,291.98

100.00%

01.02.16.02

TUBERIA DE PVC-SAL 4"

19.4

21.22

411.67

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

19.40

411.67

100.00%

01.02.16.03

ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL

pto

93.91

375.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

375.64

100.00%

01.02.16.04

ENCOFRADO Y DESENCOFRADO EN DADO DE CONCRETO

m2

3.9

44.75

174.53

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.90

174.53

100.00%

01.02.16.05

CONCRETO F'C= 140 KG/CM2 EN DADO DE CONCRETO

m3

0.3

448.73

134.62

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.30

134.62

100.00%

01.02.17

453.16

SISTEMA DE AGUA FRIA


pto

54.3

54.3

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

54.30

100.00%

3.84

11.65

44.74

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.84

44.74

100.00%

REDUCCION PVC DE 1" A 3/4"

pza

18.73

18.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

18.73

100.00%

01.02.17.04

REDUCCION PVC DE 3/4" A 1/2"

pza

18.38

18.38

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

18.38

100.00%

01.02.17.05

CODO PVC 1/2" x 90

pza

22.67

68.01

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

68.01

100.00%

01.02.17.06

VALVULAS DE COMPUERTA DE BRONCE DE 1/2"

pza

97.74

97.74

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

97.74

100.00%

01.02.17.07

GRIFO CUELLO DE CISNE

pza

151.26

151.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

151.26

100.00%

01.02.17.01

SALIDA DE AGUA DURA CON TUBERIA PVC CLASE 10 DE 1/2"

01.02.17.02

TUBERIA PVC CLASE 10 DE 1/2"

01.02.17.03

01.02.18

1815.17

INSTALACIONES SANITARIAS

01.02.18.01

MESA DE CONCRETO EN COCINA

und

1215.1

1215.1

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

1,215.10

100.00%

01.02.18.02

LAVATORIO DE ACERO INOXIDABLE DE UNA POZA CON ESCURRIDOR

und

200

200

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

200.00

100.00%

01.02.18.03

SALIDA DE DESAGUE EN PVC-SAL 2"

pto

45.16

45.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

45.16

100.00%

01.02.18.04

EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE PVC DE 2" Y 4"

m3

0.44

36.12

15.89

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.44

15.89

100.00%

01.02.18.05

RED DE DISTRIBUCION TUBERIA PVC SAL 2"

2.83

13.54

38.32

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.83

38.32

100.00%

01.02.18.06

SUMIDERO DE BRONCE 2"

und

76.12

76.12

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

76.12

100.00%

01.02.18.07

REGISTRO DE BRONCE DE 2"

und

79.81

79.81

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

79.81

100.00%

01.02.18.08

CAJAS DE REGISTRO 12'' x 24''

und

144.77

144.77

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

144.77

100.00%

Pagina 18 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

01.02.19

Metrado

Precio S/.

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

3103.13

INSTALACIONES ELECTRICAS

01.02.19.01

SALIDA DE TECHO (CENTRO DE LUZ)-1

pto

114.36

800.52

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

7.00

800.52

100.00%

01.02.19.02

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

76.54

535.78

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

7.00

535.78

100.00%

01.02.19.03

SALIDA DE PARED P/INTERRUPTOR SIMPLE-1

pto

69.77

209.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

209.31

100.00%

01.02.19.04

TABLERO TD-4

pza

722.24

722.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

722.24

100.00%

01.02.19.05

LAMPARAS CON REJILLAS Y FLUORESCENTE 3x40W

und

129.41

517.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

517.64

100.00%

01.02.19.06

LAMPARAS T/PLASTICO CUADRADO CON FLUORESCENTE CIRCULAR DE 32W

und

105.88

317.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

317.64

100.00%

01.03
01.03.01

94734.74

CONSTRUCCION COCINA - DEPOSITO DE ALIMENTOS, CUARTO DE LIMPIEZA Y SS.HH.

155.91

TRABAJOS PRELIMINARES

01.03.01.01

LIMPIEZA DE TERRENO MANUAL

m2

59.28

1.39

82.4

0.00

0.00

0.00%

82.40

100.00%

59.28

82.40

100.00%

0.00

0.00

0.00%

01.03.01.02

TRAZO Y REPLANTEO DURANTE EL PROCESO

m2

59.28

1.24

73.51

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

59.28

73.51

100.00%

01.03.02

59.28

3769.84

MOVIMIENTO DE TIERRAS

01.03.02.01

REFINE Y PERFILADO DEL TERRENO

m2

59.28

21.05

1247.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

59.28

1,247.84

100.00%

01.03.02.02

EXCAVACION DE TERRENO PARA ZAPATAS HASTA 1.70 M.

m3

20.16

30.37

612.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.16

612.26

100.00%

01.03.02.03

EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

11.69

30.37

355.03

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.69

355.03

100.00%

01.03.02.04

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

12.13

40.25

488.23

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.13

488.23

100.00%

01.03.02.05

ELIMINACIN DE MATERIAL EXCEDENTE

m3

24.66

13.37

329.7

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

24.66

329.70

100.00%

01.03.02.06

NIVELACION Y COMPACTADO DE SUB-BASE

m2

52.18

2.62

136.71

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

52.18

136.71

100.00%

01.03.02.07

RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO

m2

52.18

11.5

600.07

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

52.18

600.07

100.00%

01.03.03

11543.37

CONCRETO SIMPLE

01.03.03.01

SOLADO PARA ZAPATA ( e= 0.10 m) MEZCLA C:H 1:10

m2

13.44

45

604.8

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

13.44

604.80

100.00%

01.03.03.02

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.

m3

4.22

304.31

1284.19

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.22

1,284.19

100.00%

01.03.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

48.66

59.45

2892.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

48.66

2,892.84

100.00%

01.03.03.04

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

10.73

342.86

3678.89

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.73

3,678.89

100.00%

01.03.03.05

CANALETA DE EVACUACION PLUVIAL ENCOFRADO Y DESENCOFRADO

m2

9.66

48.13

464.94

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

9.66

464.94

100.00%

01.03.03.06

CANALETA DE EVACUACION PLUVIAL F'C=175KG/CM2

32.2

47.2

1519.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

32.20

1,519.84

100.00%

01.03.03.07

FALSO PISO DE 4" DE CONCRETO 1:8

m2

25.1

43.74

1097.87

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

25.10

1,097.87

100.00%

01.03.04

33569.21

OBRAS DE CONCRETO ARMADO

01.03.04.01

ZAPATAS CONCRETO F'C=210 KG/CM2

m3

6.72

544.79

3660.99

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.72

3,660.99

100.00%

01.03.04.02

ZAPATAS ACERO FY=4200 KG/CM2

kg

198.4

4.5

892.8

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

198.40

892.80

100.00%

01.03.04.03

VIGAS DE CIMENTACION ENCOFRADO Y DESENCOFRADO

m2

21.44

59.45

1274.61

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

21.44

1,274.61

100.00%

01.03.04.04

VIGAS DE CIMENTACION ACERO FY=4200 KG/CM2

kg

336

4.5

1512

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

336.00

1,512.00

100.00%

01.03.04.05

VIGAS DE CIMENTACION CONCRETO F'C=175KG/CM2

m3

2.68

496.01

1329.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.68

1,329.31

100.00%

01.03.04.06

COLUMNAS ENCOFRADO Y DESENCOFRADO

m2

46.38

65.49

3037.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

46.38

3,037.43

100.00%

01.03.04.07

COLUMNAS ACERO FY=4200 KG/CM2

kg

633.89

4.5

2852.51

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

633.89

2,852.51

100.00%

01.03.04.08

COLUMNAS CONCRETO F'C= 210 KG/CM2

m3

3.18

658.74

2094.79

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.18

2,094.79

100.00%

01.03.04.09

COLUMNETAS CONCRETO F'C= 175 KG/CM2

m3

0.51

496.01

252.97

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.51

252.97

100.00%

01.03.04.10

VIGAS ENCOFRADO Y DESENCOFRADO

m2

46.12

71.69

3306.34

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

46.12

3,306.34

100.00%

01.03.04.11

VIGAS ACERO FY=4200 KG/CM2

kg

645.19

4.5

2903.36

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

645.19

2,903.36

100.00%

01.03.04.12

VIGAS CONCRETO F'C=210KG/CM2

m3

4.5

624.72

2811.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.50

2,811.24

100.00%

01.03.04.13

LOSAS ALIGERADAS ENCOFRADO Y DESENCOFRADO

m2

42.7

70.49

3009.92

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

42.70

3,009.92

100.00%

01.03.04.14

LOSAS ALIGERADAS LADRILLO HUECO DE ARCILLA 15X30X30 CM

und

355.86

3.88

1380.74

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

355.86

1,380.74

100.00%

01.03.04.15

LOSAS ALIGERADAS ACERO FY=4200 KG/CM2

kg

256.71

4.5

1155.2

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

256.71

1,155.20

100.00%

01.03.04.16

LOSAS ALIGERADAS CONCRETO F'C= 210 KG/CM2

m3

3.74

560.16

2095

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.74

2,095.00

100.00%

01.03.05

4104.34

MUROS Y TABIQUES DE ALBAILERIA

01.03.05.01

MURO DE CABEZA LADRILLO K.K. 9X12X23

m2

29.21

99.33

2901.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

29.21

2,901.43

100.00%

01.03.05.02

MURO DE SOGA LADRILLO K.K. 9X12X23

m2

19.33

62.23

1202.91

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

19.33

1,202.91

100.00%

Pagina 19 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

01.03.06

Metrado

Precio S/.

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

3397.48

COBERTURA

01.03.06.01

COBERTURA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

m2

59.7

52.73

3147.98

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

59.70

3,147.98

100.00%

01.03.06.02

CUMBRERA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

10.4

23.99

249.5

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.40

249.50

100.00%

01.03.07

7088.79

REVOQUES, ENLUCIDOS Y MOLDURAS

01.03.07.01

TARRAJEO EN MURO INTERIOR Y EXTERIOR C:A 1:5, E=1.50CM

m2

90.06

25.24

2273.11

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

90.06

2,273.11

100.00%

01.03.07.02

TARRAJEO PRIMARIO MORTERO 1:5

m2

26.41

25.24

666.59

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

26.41

666.59

100.00%

01.03.07.03

TARRAJEO EN SUPERFICIE DE COLUMNAS C:A 1:5, E=1.50CM

m2

39.54

32.2

1273.19

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

39.54

1,273.19

100.00%

01.03.07.04

TARRAJEO EN SUPERFICIE DE VIGAS C:A 1:5, E=1.50CM

m2

22.19

32.2

714.52

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

22.19

714.52

100.00%

01.03.07.05

VESTIDURA DE DERRAMES C:A 1:5, E=1.50CM

19.07

9.94

189.56

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

19.07

189.56

100.00%

01.03.07.06

TARRAJEO DE CIELO RASO CON MEZCLA DE CEMENTO ARENA 1:5

m2

42.7

42.4

1810.48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

42.70

1,810.48

100.00%

01.03.07.07

BRUAS

37.09

4.35

161.34

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

37.09

161.34

100.00%

01.03.08

4440.82

PISOS Y PAVIMENTOS

01.03.08.01

PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR

m2

18.93

42.48

804.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

18.93

804.15

100.00%

01.03.08.02

ENCOFRADO Y DESENCOFRADO PARA VEREDAS, PISTAS

m2

3.8

44.75

170.05

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.80

170.05

100.00%

01.03.08.03

VEREDAS DE CONCRETO F'C=175 KG/CM2

m3

3.43

487.62

1672.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.43

1,672.54

100.00%

01.03.08.04

CONTRAPISO DE 48 MM

m2

17.04

35.61

606.79

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

17.04

606.79

100.00%

01.03.08.05

PISO DE CERAMICO DE 30X30CM ANTIDESLIZANTE

m2

17.04

64.87

1105.38

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

17.04

1,105.38

100.00%

01.03.08.06

JUNTAS ASFALTICAS

10.2

8.03

81.91

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.20

81.91

100.00%

01.03.09
01.03.09.01

CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

01.03.09.02

ZOCALO DE MAYOLICA BLANCA DE 20x30 CM

01.03.10

1816.1

ZOCALOS Y CONTRAZOCALOS
m

21.77

10.67

232.29

0.00

0.00

0.00%

0.00

0.00

0.00

0.00%

21.77

232.29

100.00%

m2

26.41

59.97

1583.81

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

26.41

1,583.81

100.00%

8536.43

CARPINTERIA DE MADERA

01.03.10.01

PUERTA C/TABLEROS DE MADERA TORNILLO

m2

5.46

554.59

3028.06

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.46

3,028.06

100.00%

01.03.10.02

VENTANA DE MADERA TORNILLO

m2

16.69

330.04

5508.37

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

16.69

5,508.37

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.20

404.33

100.00%

01.03.11
01.03.11.01
01.03.12

404.33

CARPINTERIA METALICA
REJILLA DE FIERRO EN CUNETA PLUVIAL

4.2

96.27

404.33
2086.68

CERRAJERIA

01.03.12.01

BISAGRA ALUMINIZADA PESADA DE 4"

pza

12

17.82

213.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.00

213.84

100.00%

01.03.12.02

BISAGRA ALUMINIZADA PESADA DE 2.5"

pza

66

15.92

1050.72

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

66.00

1,050.72

100.00%

01.03.12.03

CERRADURA PARA PUERTA DOS GOLPES

pza

92.71

278.13

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

278.13

100.00%

01.03.12.04

CERROJO DE SEGURIDAD PARA VENTANAS

und

33

13.82

456.06

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

33.00

456.06

100.00%

01.03.12.05

MANIJA DE 4" PARA PUERTAS

und

29.31

87.93

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

87.93

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

179.56

991.17

100.00%

01.03.13
01.03.13.01
01.03.14

991.17

VIDRIOS
VIDRIOS SEMIDOBLES

p2

179.56

5.52

991.17
3482.06

PINTURA

01.03.14.01

PINTURA AL OLEO 2 MANOS EN INTERIORES Y EXTERIORES

m2

154.84

12.05

1865.82

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

154.84

1,865.82

100.00%

01.03.14.02

PINTURA LATEX 2 MANOS EN CIELO RASO

m2

42.7

12.94

552.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

42.70

552.54

100.00%

01.03.14.03

PINTURA BARNIZ EN CARPINTERIA DE MADERA

m2

44.3

22.37

990.99

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

44.30

990.99

100.00%

01.03.14.04

PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO

21.77

3.34

72.71

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

21.77

72.71

100.00%

01.03.15

573.61

VARIOS

01.03.15.01

TABIQUERIA DE MALAMINE

m2

4.83

101.7

491.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.83

491.21

100.00%

01.03.15.02

LIMPIEZA PERMANENTE DE OBRA

m2

59.28

1.39

82.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

59.28

82.40

100.00%

01.03.16

2454.7

SISTEMA DE EVACUACION PLUVIAL

01.03.16.01

CANALETA DE EVACUACION PLUVIAL

20.8

69.09

1437.07

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.80

1,437.07

100.00%

01.03.16.02

TUBERIA DE PVC-SAL 4"

15.2

21.22

322.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

15.20

322.54

100.00%

01.03.16.03

ACCESORIOS EN TUB. BAJADA DE EVAC. PLUVIAL

pto

93.91

375.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

375.64

100.00%

01.03.16.04

ENCOFRADO Y DESENCOFRADO EN DADO DE CONCRETO

m2

4.03

44.75

180.34

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.03

180.34

100.00%

Pagina 20 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

01.03.16.05
01.03.17

CONCRETO F'C= 140 KG/CM2 EN DADO DE CONCRETO

Metrado

Precio S/.

m3

0.31

448.73

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Parcial S/.

139.11

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

Parcial S/.

PORCENTAJE

0.31

139.11

100.00%

1127.81

SISTEMA DE AGUA FRIA


pto

54.3

217.2

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

217.20

100.00%

14.7

11.65

171.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

14.70

171.26

100.00%

REDUCCION PVC DE 1" A 3/4"

pza

18.73

37.46

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

37.46

100.00%

01.03.17.04

REDUCCION PVC DE 3/4" A 1/2"

pza

18.38

36.76

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

36.76

100.00%

01.03.17.05

CODO PVC 1/2" x 90

pza

11

22.67

249.37

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.00

249.37

100.00%

01.03.17.06

VALVULAS DE COMPUERTA DE BRONCE DE 1/2"

pza

97.74

195.48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

195.48

100.00%

01.03.17.07

GRIFO CROMADO DE 1/2"

und

69.02

69.02

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

69.02

100.00%

01.03.17.08

GRIFO CUELLO DE CISNE

pza

151.26

151.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

151.26

100.00%

01.03.17.01

SALIDA DE AGUA DURA CON TUBERIA PVC CLASE 10 DE 1/2"

01.03.17.02

TUBERIA PVC CLASE 10 DE 1/2"

01.03.17.03

01.03.18

1744.35

INSTALACIONES SANITARIAS

01.03.18.01

INODORO TANQUE BAJO BLANCO NACIONAL

pza

205.88

205.88

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

205.88

100.00%

01.03.18.02

LAVATORIO DE PARED BLANCO

pza

79.83

79.83

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

79.83

100.00%

01.03.18.03

SALIDA DE DESAGUE EN PVC-SAL 4''

pto

95.18

95.18

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

95.18

100.00%

01.03.18.04

SALIDA DE DESAGUE EN PVC-SAL 2"

pto

45.16

225.8

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.00

225.80

100.00%

01.03.18.05

SALIDA DE VENTILACION PVC-SAL 2"

pto

93.12

186.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

186.24

100.00%

01.03.18.06

EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE PVC DE 2" Y 4"

m3

1.82

36.12

65.74

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.82

65.74

100.00%

01.03.18.07

RED DE DISTRIBUCION TUBERIA PVC SAL 2"

7.5

13.54

101.55

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

7.50

101.55

100.00%

01.03.18.08

RED DE DISTRIBUCION TUBERIA PVC SAL 4"

14.08

28.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

28.16

100.00%

01.03.18.09

CODO PVC SAL 2"X45

pza

22.77

68.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

68.31

100.00%

01.03.18.10

YEE PVC SAL 2"

pza

25.04

25.04

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

25.04

100.00%

01.03.18.11

YEE PVC SAL 4"X2"

pza

26.36

52.72

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

52.72

100.00%

01.03.18.12

SUMIDERO DE BRONCE 2"

und

76.12

152.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

152.24

100.00%

01.03.18.13

REGISTRO DE BRONCE DE 4"

pza

88.31

88.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

88.31

100.00%

01.03.18.14

REGISTRO DE BRONCE DE 2"

und

79.81

79.81

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

79.81

100.00%

01.03.18.15

CAJAS DE REGISTRO 12'' x 24''

und

144.77

289.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

289.54

100.00%

01.03.19

3447.74

INSTALACIONES ELECTRICAS

01.03.19.01

SALIDA DE TECHO (CENTRO DE LUZ)-1

pto

114.36

914.88

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.00

914.88

100.00%

01.03.19.02

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

76.54

459.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

459.24

100.00%

01.03.19.03

SALIDA DE PARED P/INTERRUPTOR SIMPLE-1

pto

69.77

418.62

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

418.62

100.00%

01.03.19.04

TABLERO TD-3

pza

737.37

737.37

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

737.37

100.00%

01.03.19.05

LAMPARAS CON REJILLAS Y FLUORESCENTE 3x40W

und

129.41

388.23

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

388.23

100.00%

01.03.19.06

LAMPARAS T/PLASTICO CUADRADO CON FLUORESCENTE CIRCULAR DE 32W

und

105.88

529.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.00

529.40

100.00%

01.04

15612.53

INSTALACIONES DE JUEGOS INFANTILES

01.04.01

PREPARACION DE SUPERFICIE DE JUEGOS RECREACIONALES

m2

30

26.02

780.6

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

30.00

780.60

100.00%

01.04.02

INSTALACION DE JUEGOS RECREACIONALES

GLB

14831.93

14831.93

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

14,831.93

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

60.00

74.40

100.00%

01.05
01.05.01
01.05.01.01
01.05.02

9428.04

CONSTRUCCION PATIO MULTIUSO

74.4

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO

m2

60

1.24

74.4
1412.19

MOVIMIENTO DE TIERRAS

01.05.02.01

EXCAVACION MANUAL

m3

12

30.37

364.44

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.00

364.44

100.00%

01.05.02.02

ELIMINACIN DE MATERIAL EXCEDENTE

m3

15

13.37

200.55

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

15.00

200.55

100.00%

01.05.02.03

NIVELACION Y COMPACTADO DE SUB-BASE

m2

60

2.62

157.2

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

60.00

157.20

100.00%

01.05.02.04

RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO

m2

60

11.5

690

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

60.00

690.00

100.00%

01.05.03

7941.45

CONCRETO SIMPLE

01.05.03.01

LOSA ENCOFRADOS Y DESENCOFRADO

m2

11.4

58.46

666.44

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.40

666.44

100.00%

01.05.03.02

LOSA CONCRETO F'C= 175 KG/CM2

m3

14.21

487.1

6921.69

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

14.21

6,921.69

100.00%

Pagina 21 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

01.05.03.03
01.06
01.06.01
01.06.01.01
01.06.02

JUNTAS ASFALTICAS

Metrado

Precio S/.

44

8.03

NOVIEMBRE 2,015

Parcial S/.

353.32

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

44.00

353.32

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

9.36

11.61

100.00%

53973.04

CONSTRUCCION DE CISTERNA (6 M3) Y TANQUE ELEVADO (3 M3)

11.61

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO

MES:
120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

m2

9.36

1.24

11.61
1252.01

MOVIMIENTO DE TIERRAS

01.06.02.01

EXCAVACION DE ZANJAS PARA CISTERNA

m3

21.06

35.43

746.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

21.06

746.16

100.00%

01.06.02.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

4.9

40.25

197.23

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.90

197.23

100.00%

01.06.02.03

ELIMINACIN DE MATERIAL EXCEDENTE

m3

20.2

13.37

270.07

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.20

270.07

100.00%

01.06.02.04

NIVELACION Y COMPACTADO DE SUB-BASE

m2

2.73

2.62

7.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.73

7.15

100.00%

01.06.02.05

RELLENO COMPACTADO CON MATERIAL AFIRMADO C/EQUIPO

m2

2.73

11.5

31.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.73

31.40

100.00%

01.06.03

633.35

CONCRETO SIMPLE

01.06.03.01

CIMIENTOS CORRIDOS MEZCLA 1:8 CEMENTO-HORMIGON 30% P.G.

m3

0.91

345.77

314.65

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.91

314.65

100.00%

01.06.03.02

CIMIENTOS CORRIDOS ENCOFRADO Y DESENCOFRADO

m2

2.28

69.97

159.53

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.28

159.53

100.00%

01.06.03.03

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

1.87

59.45

111.17

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.87

111.17

100.00%

01.06.03.04

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

0.14

342.86

48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.14

48.00

100.00%

01.06.04

32691.51

OBRAS DE CONCRETO ARMADO

01.06.04.01

CISTERNA, ENCOFRADO Y DESENCOFRADO

m2

50.48

59.45

3001.04

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

50.48

3,001.04

100.00%

01.06.04.02

CISTERNA, CONCRETO F'C=210 KG/CM2

m3

8.62

544.27

4691.61

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.62

4,691.61

100.00%

01.06.04.03

CISTERNA, ACERO FY=4200KG/CM2

kg

751.54

4.5

3381.93

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

751.54

3,381.93

100.00%

01.06.04.04

COLUMNAS ENCOFRADO Y DESENCOFRADO

m2

39.92

65.49

2614.36

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

39.92

2,614.36

100.00%

01.06.04.05

COLUMNAS ACERO FY=4200 KG/CM2

kg

965.44

4.5

4344.48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

965.44

4,344.48

100.00%

01.06.04.06

COLUMNAS CONCRETO F'C= 210 KG/CM2

m3

4.1

658.74

2700.83

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.10

2,700.83

100.00%

01.06.04.07

VIGAS ENCOFRADO Y DESENCOFRADO

m2

27.85

71.69

1996.57

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

27.85

1,996.57

100.00%

01.06.04.08

VIGAS ACERO FY=4200 KG/CM2

kg

361.41

4.5

1626.35

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

361.41

1,626.35

100.00%

01.06.04.09

VIGAS CONCRETO F'C=210KG/CM2

m3

2.04

624.72

1274.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.04

1,274.43

100.00%

01.06.04.10

LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO

m2

3.14

59.45

186.67

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.14

186.67

100.00%

01.06.04.11

LOSAS MACIZAS, ACERO FY=4200KG/CM2

kg

41.82

4.5

188.19

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

41.82

188.19

100.00%

01.06.04.12

LOSAS MACIZAS, CONCRETO F'C=210 KG/CM2

m3

0.63

544.27

342.89

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.63

342.89

100.00%

01.06.04.13

MANGUITO PVC-SAL 1 1/2" x 10cm, FIERRO 1/2" x 80cm

und

11.2

67.2

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

67.20

100.00%

01.06.04.14

TANQUE ELEVADO, ENCOFRADO Y DESENCOFRADO

m2

31.01

79.96

2479.56

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

31.01

2,479.56

100.00%

01.06.04.15

TANQUE ELEVADO, ACERO FY = 4200 KG/CM2

kg

246.48

4.5

1109.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

246.48

1,109.16

100.00%

01.06.04.16

TANQUE ELEVADO, CONCRETO F'C=210 KG/CM2

m3

4.22

636.55

2686.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.22

2,686.24

100.00%

01.06.05

797.64

MUROS Y TABIQUES DE ALBAILERIA

01.06.05.01

MURO DE SOGA LADRILLO K.K. 9X13X24

m2

8.19

69.31

567.65

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.19

567.65

100.00%

01.06.05.02

MURO DE CANTO LADRILLO K.K. 9X13X24

m2

1.12

76.51

85.69

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.12

85.69

100.00%

01.06.05.03

ALAMBRE N 8 REFUERZO HORIZONTAL EN MUROS

kg

7.58

4.8

36.38

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

7.58

36.38

100.00%

01.06.05.04

JUNTA DE CONSTRUCCION CON TEKNOPORT

m2

2.19

49.28

107.92

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.19

107.92

100.00%

01.06.06

5841.84

REVOQUES, ENLUCIDOS Y MOLDURAS

01.06.06.01

TARRAJEO EN MURO INTERIOR Y EXTERIOR C:A 1:5, E=1.50CM

m2

18.05

25.24

455.58

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

18.05

455.58

100.00%

01.06.06.02

TARRAJEO EN SUPERFICIE DE COLUMNAS C:A 1:5, E=1.50CM

m2

37.2

32.2

1197.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

37.20

1,197.84

100.00%

01.06.06.03

TARRAJEO EN SUPERFICIE DE VIGAS C:A 1:5, E=1.50CM

m2

38.25

32.2

1231.65

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

38.25

1,231.65

100.00%

01.06.06.04

TARRAJEO DE MUROS DE CONCRETO

m2

21.79

25.78

561.75

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

21.79

561.75

100.00%

01.06.06.05

TARRAJEO CON IMPERMEABILIZANTE

m2

54.21

30.11

1632.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

54.21

1,632.26

100.00%

01.06.06.06

VESTIDURA DE DERRAMES C:A 1:5, E=1.50CM

1.25

9.94

12.43

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.25

12.43

100.00%

01.06.06.07

BRUAS

89.64

4.35

389.93

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

89.64

389.93

100.00%

01.06.06.08

TARRAJEO DE CIELO RASO CON MEZCLA DE CEMENTO ARENA 1:5

m2

8.5

42.4

360.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.50

360.40

100.00%

01.06.07

PISOS Y PAVIMENTOS

922.68

Pagina 22 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

Metrado

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Precio S/.

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

01.06.07.01

PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR

m2

9.7

42.48

412.06

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

9.70

412.06

100.00%

01.06.07.02

VEREDAS DE CONCRETO F'C=175 KG/CM2

m3

0.73

487.62

355.96

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.73

355.96

100.00%

01.06.07.03

JUNTAS ASFALTICAS

19.26

8.03

154.66

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

19.26

154.66

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.36

217.24

100.00%

01.06.08
01.06.08.01
01.06.09

217.24

CONTRAZOCALO
CONTRAZOCALO CEMENTO S/COLOREAR H = 20 CM

20.36

10.67

217.24
1206.72

CARPINTERIA METALICA

01.06.09.01

PUERTA METALICA DE CUARTO MAQUINAS (2.05 x 0.70m)

und

134.45

134.45

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

134.45

100.00%

01.06.09.02

ESCALERA DE GATO DE TUBO FG DE 1 1/2" y 1"

6.8

120.31

818.11

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.80

818.11

100.00%

01.06.09.03

ESCALERA DE GATO DE ALUMINIO EN CISTERNA

und

254.16

254.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

254.16

100.00%

01.06.10

122.02

CERRAJERIA

01.06.10.01

CERRADURA PARA PUERTA DOS GOLPES

pza

92.71

92.71

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

92.71

100.00%

01.06.10.02

MANIJA DE 4" PARA PUERTAS

und

29.31

29.31

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

29.31

100.00%

01.06.11

1344.53

PINTURA

01.06.11.01

PINTURA AL OLEO 2 MANOS EN INTERIORES Y EXTERIORES

m2

93.7

12.05

1129.09

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

93.70

1,129.09

100.00%

01.06.11.02

PINTURA LATEX 2 MANOS EN CIELO RASO

m2

8.5

12.94

109.99

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.50

109.99

100.00%

01.06.11.03

PINTURA ESMALTE ANTICORROSIVO EN CARPINTERIA METALICA

m2

2.87

13.05

37.45

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.87

37.45

100.00%

01.06.11.04

PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO

20.36

3.34

68

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.36

68.00

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.24

81.75

100.00%

01.06.12
01.06.12.01
01.06.13

81.75

VARIOS
CUBIERTA DE LADRILLO PASTELERO

m2

3.24

25.23

81.75
7394.63

SISTEMA DE AGUA FRIA

01.06.13.01

TUBERIA 4" F G

0.5

164.49

82.25

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.50

82.25

100.00%

01.06.13.02

TUBERIA 2" F G

14.4

44.85

645.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

14.40

645.84

100.00%

01.06.13.03

TUBERIA 1 1/2" F G

26.8

24.46

655.53

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

26.80

655.53

100.00%

01.06.13.04

TUBERIA PVC CLASE 10 DE 2"

20.53

82.12

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

82.12

100.00%

01.06.13.05

TUBERIA 3/4" F G

0.5

16.41

8.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.50

8.21

100.00%

01.06.13.06

VALVULA DE COMPUERTA DE BRONCE DE 2"

und

159.65

159.65

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

159.65

100.00%

01.06.13.07

VALVULA DE COMPUERTA DE BRONCE DE 1 1/2"

und

120.16

480.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

480.64

100.00%

01.06.13.08

VALVULA DE COMPUERTA DE BRONCE DE 3/4"

und

73.08

73.08

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

73.08

100.00%

01.06.13.09

VALVULA CHECK DE BRONCE DE 1 1/2"

und

144.51

433.53

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

433.53

100.00%

01.06.13.10

VALVULA FLOTADORA DE BRONCE DE 1 1/4"

und

204.19

204.19

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

204.19

100.00%

01.06.13.11

EQUIPO DE BOMBEO, 02 ELECTROBOMBAS 1.4HP

GLB

3558.23

3558.23

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

3,558.23

100.00%

01.06.13.12

TAPA SANITARIA DE FIERRO EN CISTERNA Y TANQUE ALTO

und

80.76

161.52

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

161.52

100.00%

01.06.13.13

REBOSE DE CISTERNA DE F G 4"

und

74.36

74.36

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

74.36

100.00%

01.06.13.14

REBOSE DE TANQUE ELEVADO DE F G 2"

und

55.48

55.48

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

55.48

100.00%

01.06.13.15

ABRAZADERA DE FIJACION DE TUBO HASTA 2" DE F G

pza

15

25.36

380.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

15.00

380.40

100.00%

01.06.13.16

ROMPE AGUA

pza

42.45

339.6

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.00

339.60

100.00%

01.06.14

1455.51

INSTALACIONES ELECTRICAS

01.06.14.01

SALIDA DE TECHO (CENTRO DE LUZ)

pto

103.32

206.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

206.64

100.00%

01.06.14.02

SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC

pto

76.54

76.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

76.54

100.00%

01.06.14.03

SALIDA DE PARED P/INTERRUPTOR DOBLE

pto

62.26

62.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

62.26

100.00%

01.06.14.04

TABLEROS DISTRIBUCION CAJA METALICA

pza

936.38

936.38

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

936.38

100.00%

01.06.14.05

CAJA DE PASE

und

53.05

53.05

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

53.05

100.00%

01.06.14.06

LAMPARA FLUORESCENTE DE 50W (INCL. SOQUET)

und

60.32

120.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

120.64

100.00%

0.00

0.00

0.00%

31.12

33.33%

25.10

31.12

33.33%

50.20

62.25

66.67%

01.07
01.07.01
01.07.01.01
01.07.02

101491.35

CONSTRUCCION CERCO PERIMETRICO

93.37

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO
MOVIMIENTO DE TIERRAS

m2

75.3

1.24

93.37
5090.47

Pagina 23 de 27

25.10

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


OBRA

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Metrado

Precio S/.

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

01.07.02.01

EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

95.8

30.37

2909.45

0.00

0.00

0.00%

31.93

969.82

33.33%

31.93

969.82

33.33%

63.87

1,939.63

66.67%

01.07.02.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

24.64

40.25

991.76

0.00

0.00

0.00%

8.21

330.59

33.33%

8.21

330.59

33.33%

16.43

661.17

66.67%

01.07.02.03

ELIMINACIN DE MATERIAL EXCEDENTE

m3

88.95

13.37

1189.26

0.00

0.00

0.00%

29.65

396.42

33.33%

29.65

396.42

33.33%

59.30

792.84

66.67%

20.08

01.07.03

34112.75

CONCRETO SIMPLE

01.07.03.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.

m3

60.24

304.31

18331.63

0.00

0.00

0.00%

6,110.54

33.33%

20.08

6,110.54

33.33%

40.16

12,221.09

66.67%

01.07.03.02

SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO

m2

194.4

59.45

11557.08

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

194.40

11,557.08

100.00%

SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.

m3

12.32

342.86

4224.04

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

12.32

4,224.04

100.00%
100.00%

01.07.03.03
01.07.04

31330.38

OBRAS DE CONCRETO ARMADO

01.07.04.01

COLUMNAS ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

168.39

66.75

11240.03

0.00

0.00

0.00%

01.07.04.02

COLUMNAS ACERO FY=4200 KG/CM2

kg

2130.56

4.5

9587.52

0.00

0.00

0.00%

01.07.04.03

COLUMNETAS CONCRETO F'C= 175 KG/CM2

m3

13.69

496.01

6790.38

0.00

0.00

01.07.04.04

VIGAS ENCOFRADO Y DESENCOFRADO

m2

24.17

71.69

1732.75

0.00

01.07.04.05

VIGAS ACERO FY=4200 KG/CM2

kg

242.63

4.5

1091.84

0.00

01.07.04.06

VIGAS CONCRETO F'C=175KG/CM2

m3

1.79

496.01

887.86

01.07.05

0.00

0.00%

0.00

0.00

0.00%

168.39

11,240.03

2,396.88

25.00%

532.64

2,396.88

25.00%

1,597.92

7,190.64

75.00%

0.00%

0.00

0.00%

0.00

0.00

0.00%

13.69

6,790.38

100.00%

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

24.17

1,732.75

100.00%

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

242.63

1,091.84

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.79

887.86

100.00%

532.64

18266.36

MUROS Y TABIQUES DE ALBAILERIA

01.07.05.01

MURO DE SOGA LADRILLO K.K. 9X13X24 CARAVISTA

m2

206.81

87.14

18021.42

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

206.81

18,021.42

100.00%

01.07.05.02

ALAMBRE N 8 REFUERZO HORIZONTAL EN MUROS

kg

51.03

4.8

244.94

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

51.03

244.94

100.00%

01.07.06

2468.59

COBERTURA

01.07.06.01

COBERTURA C/LADRILLO DE ARCILLA ASENTADO CON MEZCLA

89.53

26.3

2354.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

89.53

2,354.64

100.00%

01.07.06.02

CUMBRERA C/TEJA DE ARCILLA 32x15 ASENTADO CON MEZCLA

4.75

23.99

113.95

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.75

113.95

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

136.90

4,560.14

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

47.37

5,569.29

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.39

7.92

100.00%

01.07.07
01.07.07.01
01.07.08
01.07.08.01
01.08
01.08.01
01.08.01.01
01.08.02

4560.14

ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO S/COLOREAR H = 40 CM 1:5 e=1.5cm

136.9

33.31

SUMINISTRO E INSTAL. DE MALLA OLIMPICA #12x2"x20m H=2.60m

47.37

117.57

5569.29
9916.51

PORTADA DE INGRESO

7.92

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO

4560.14
5569.29

VARIOS

m2

6.39

1.24

7.92
521.02

MOVIMIENTO DE TIERRAS

01.08.02.01

EXCAVACION DE TERRENO PARA ZAPATAS HASTA 1.70 M.

m3

8.5

30.37

258.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

8.50

258.15

100.00%

01.08.02.02

RELLENO CON MATERIAL PROPIO SELECCIONADO

m3

40.25

120.75

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

120.75

100.00%

01.08.02.03

ELIMINACIN DE MATERIAL EXCEDENTE

m3

10.63

13.37

142.12

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.63

142.12

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.42

198.90

100.00%

01.08.03
01.08.03.01
01.08.04

198.9

CONCRETO SIMPLE
SOLADO PARA ZAPATA ( e= 0.10 m) MEZCLA C:H 1:10

m2

4.42

45

198.9
4756.62

OBRAS DE CONCRETO ARMADO

01.08.04.01

ZAPATAS CONCRETO F'C=210 KG/CM2

m3

2.65

544.79

1443.69

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.65

1,443.69

100.00%

01.08.04.02

ZAPATAS ACERO FY=4200 KG/CM2

kg

47.92

4.5

215.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

47.92

215.64

100.00%

01.08.04.03

COLUMNAS ENCOFRADO Y DESENCOFRADO CARAVISTA

m2

10.56

66.75

704.88

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.56

704.88

100.00%

01.08.04.04

COLUMNAS ACERO FY=4200 KG/CM2

kg

134.67

4.5

606.02

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

134.67

606.02

100.00%

01.08.04.05

COLUMNETAS CONCRETO F'C= 175 KG/CM2

m3

0.7

496.01

347.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.70

347.21

100.00%

01.08.04.06

VIGAS ENCOFRADO Y DESENCOFRADO

m2

10.7

71.69

767.08

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.70

767.08

100.00%

01.08.04.07

VIGAS ACERO FY=4200 KG/CM2

kg

49.05

4.5

220.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

49.05

220.73

100.00%

01.08.04.08

VIGAS CONCRETO F'C=175KG/CM2

m3

0.91

496.01

451.37

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.91

451.37

100.00%

01.08.05
01.08.05.01

TARRAJEO EN SUPERFICIE DE VIGAS C:A 1:5, E=1.50CM

01.08.05.02

BRUAS

01.08.06
01.08.06.01

478.24

REVOQUES, ENLUCIDOS Y MOLDURAS


m2

11.88

32.2

382.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.88

382.54

100.00%

22

4.35

95.7

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

22.00

95.70

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.70

22.03

100.00%

22.03

ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

1.7

12.96

22.03

Pagina 24 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

OBRA

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

01.08.07
01.08.07.01
01.08.08

Metrado

Precio S/.

m2

9.56

285.87

NOVIEMBRE 2,015

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

2732.92

CARPINTERIA METALICA
PUERTA INGRESO PRINCIPAL C/PERFILES 3/16"

MES:
120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

2732.92

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

9.56

2,732.92

100.00%

252.64

CERRAJERIA

01.08.08.01

CERRADURA PARA PUERTA DOS GOLPES

pza

92.71

185.42

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

185.42

100.00%

01.08.08.02

CANDADO DE 60MM

und

33.61

67.22

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

67.22

100.00%

01.08.09

507.16

PINTURA

01.08.09.01

PINTURA AL OLEO 2 MANOS EN INTERIORES Y EXTERIORES

m2

20.92

12.05

252.09

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.92

252.09

100.00%

01.08.09.02

PINTURA ESMALTE ANTICORROSIVO EN CARPINTERIA METALICA

m2

19.11

13.05

249.39

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

19.11

249.39

100.00%

01.08.09.03

PINTURA DE CONTRAZOCALO C/ESMALTE ECONOMICO

1.7

3.34

5.68

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.70

5.68

100.00%

01.08.10

439.06

INSTALACIONES ELECTRICAS

01.08.10.01

SALIDA DE TECHO (CENTRO DE LUZ)

pto

103.32

206.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

206.64

100.00%

01.08.10.02

SALIDA DE PARED P/INTERRUPTOR SIMPLE

pto

58.73

58.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

58.73

100.00%

01.08.10.03

CAJA DE PASE

und

53.05

53.05

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

53.05

100.00%

01.08.10.04

LAMPARA FLUORESCENTE DE 50W (INCL. SOQUET)

und

60.32

120.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

120.64

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.80

54.67

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.16

968.13

100.00%

01.09
01.09.01
01.09.01.01
01.09.02
01.09.02.01
01.09.03

3091.39

ASTA DE BANDERA

54.67

MOVIMIENTO DE TIERRAS
EXCAVACION DE TIERRA PARA CIMENTACION HASTA 1.40 MT

m3

1.8

30.37

CONCRETO F'C=140 KG/CM2 BASE Y SARDINEL

54.67
968.13

CONCRETO SIMPLE
m3

2.16

448.21

968.13
950.31

OBRAS DE CONCRETO ARMADO

01.09.03.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

6.32

69.97

442.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.32

442.21

100.00%

01.09.03.02

ACERO FY=4200 KG/CM2

kg

23.6

19.85

468.46

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

23.60

468.46

100.00%

01.09.03.03

CONCRETO F'C=175 KG/CM2

m3

0.08

495.49

39.64

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

0.08

39.64

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

9.20

194.30

100.00%

01.09.04
01.09.04.01
01.09.05

194.3

REVOQUES, ENLUCIDOS Y MOLDURAS


TARRAJEO EN PEDESTAL (MORTERO 1:5)

m2

9.2

21.12

194.3
81.33

PINTURA

01.09.05.01

PINTURA (ESMALTE Y ANTIC.) EN POSTE

m2

1.76

10.66

18.76

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.76

18.76

100.00%

01.09.05.02

PINTURA (ESMALTE) EN BASE Y PLACA DE CONCRETO

m2

6.32

9.9

62.57

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.32

62.57

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

842.65

100.00%

100.00%

01.09.06
01.09.06.01
01.10
01.10.01

842.65

VARIOS
ASTA DE BANDERA (INCLUYE BANDERA)

und

842.65

842.65
37406.75

OBRAS GENERALES

18698.15

OBRAS PROVISIONALES

01.10.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60M X 4.80M

und

1008.4

1008.4

0.00

0.00

0.00%

01.10.01.02

CASETA GUARDIANIA Y ALAMACEN

m2

62.5

163.5

10218.75

0.00

0.00

0.00%

01.10.01.03

POZA DE ALBAILERIA 3x3x1.20m CAP. 9.0m3 INC/TARRAJEO IMPERMEABILIZANTE

und

2961.21

2961.21

0.00

0.00

0.00%

01.10.01.04

OBRAS DE DEMOLICION

62.50

0.00

0.00%

0.00

0.00

0.00%

1.00

1,008.40

10,218.75

100.00%

62.50

10,218.75

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

2,961.21

100.00%

4509.79

01.10.01.04.01

DESMONTAJE DE TECHO DE CALAMINA

m2

313.14

1.33

416.48

0.00

0.00

0.00%

313.14

416.48

100.00%

313.14

416.48

100.00%

0.00

0.00

0.00%

01.10.01.04.02

DESMONTAJE DE VENTANAS

m2

13.86

2.42

33.54

0.00

0.00

0.00%

13.86

33.54

100.00%

13.86

33.54

100.00%

0.00

0.00

0.00%

01.10.01.04.03

DESMONTAJE DE PUERTAS

m2

5.13

4.03

20.67

0.00

0.00

0.00%

5.13

20.67

100.00%

5.13

20.67

100.00%

0.00

0.00

0.00%

01.10.01.04.04

DEMOLICION DE MUROS DE ADOBE C/MAQUINA

m3

121.53

4.74

576.05

0.00

0.00

0.00%

121.53

576.05

100.00%

121.53

576.05

100.00%

0.00

0.00

0.00%

01.10.01.04.05

DEMOLICION DE PISO DE CONCRETO

m2

199.51

4.67

931.71

0.00

0.00

0.00%

199.51

931.71

100.00%

199.51

931.71

100.00%

0.00

0.00

0.00%

01.10.01.04.06

ELIMINACIN DE MATERIAL EXCEDENTE

m3

189.33

13.37

2531.34

0.00

0.00

0.00%

189.33

2,531.34

100.00%

189.33

2,531.34

100.00%

0.00

0.00

0.00%

01.10.02

7823.42

OBRAS DE EXPLANACION

01.10.02.01

TRAZO Y REPLANTEO DURANTE EL PROCESO

m2

665.2

1.24

824.85

0.00

0.00

0.00%

332.60

412.42

50.00%

332.60

412.42

50.00%

332.60

412.42

50.00%

01.10.02.02

CORTE MASIVO DE TERRENO A MAQUINA

m3

297.4

6.82

2028.27

0.00

0.00

0.00%

297.40

2,028.27

100.00%

297.40

2,028.27

100.00%

0.00

0.00

0.00%

01.10.02.03

ELIMINACIN DE MATERIAL EXCEDENTE

m3

371.75

13.37

4970.3

0.00

0.00

0.00%

371.75

4,970.30

100.00%

371.75

4,970.30

100.00%

0.00

0.00

0.00%

01.10.03

OBRAS DE SANEAMIENTO

5555.44

Pagina 25 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

OBRA

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

Metrado

Precio S/.

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

01.10.03.01

EXCAVACION DE ZANJAS PARA TUBERIAS Y CAJAS DE REGISTRO

105.8

7.09

750.12

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

105.80

750.12

100.00%

01.10.03.02

RELLENO DE ZANJAS C/MAT PROPIO

99.8

13.29

1326.34

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

99.80

1,326.34

100.00%

01.10.03.03

RED DE DISTRIBUCION TUB. PVC SAL 4"

40.8

13.88

566.3

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

40.80

566.30

100.00%

01.10.03.04

CAJAS DE REGISTRO 12'' x 24''

und

144.77

868.62

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

6.00

868.62

100.00%

01.10.03.05

PRUEBA HIDRAULICA TUB. 4" A ZANJA TAPADA

40.8

2.23

90.98

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

40.80

90.98

100.00%

01.10.03.06

RED DE DISTRIBUCION TUB. CLASE 10 DE 1"

57.8

15.78

912.08

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

57.80

912.08

100.00%

01.10.03.07

RED DE DISTRIBUCION TUB CLASE 10 DE 3/4"

11.3

12.7

143.51

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.30

143.51

100.00%

01.10.03.08

ACCESORIOS EN CONEXIONES PVC

GLB

423.73

423.73

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

423.73

100.00%

01.10.03.09

UNION ROSCADA DE 1" PVC

pza

11

23.89

262.79

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

11.00

262.79

100.00%

01.10.03.10

CODO PVC 1" X 90

pza

23.29

93.16

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

4.00

93.16

100.00%

01.10.03.11

TEE PVC SAP 1"

pza

24.05

72.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

72.15

100.00%

01.10.03.12

CODO PVC 3/4" x 90

pza

22.83

45.66

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

45.66

100.00%

01.10.04

4039.72

OBRAS ELECTRICAS

01.10.04.01

TRAZO Y REPLANTEO DURANTE EL PROCESO

m2

16.35

1.24

20.27

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

16.35

20.27

100.00%

01.10.04.02

EXCAVACION DE ZANJAS HASTA 0.65m

m3

10.63

35.43

376.62

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

10.63

376.62

100.00%

01.10.04.03

CAMA DE APOYO CON MAT/PROPIO ZARANDEADO

32.7

6.17

201.76

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

32.70

201.76

100.00%

01.10.04.04

RELLENO COMPACTADO C/EQUIPO MAT/PROPIO

m2

16.35

2.58

42.18

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

16.35

42.18

100.00%

01.10.04.05

POZO-CONEXION A TIERRA

und

1412.27

1412.27

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

1,412.27

100.00%

01.10.04.06

TABLERO GENERAL 1-3X165A

und

1087.97

1087.97

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

1,087.97

100.00%

01.10.04.07

ALIMENTADOR CABLE NYY (2 - 1 x 16mm2 + 1 x 10 mm2)

16.05

26.15

419.71

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

16.05

419.71

100.00%

01.10.04.08

ALIMENTADOR CABLE NYY (2 - 1 x 10mm2 + 1 x 10 mm2)

13.7

23.78

325.79

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

13.70

325.79

100.00%

01.10.04.09

ALIMENTADOR CABLE NYY (2 - 1 x 6mm2 + 1 x 6mm2)

7.3

20.98

153.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

7.30

153.15

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

72.27

1,290.02

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

7,435.66

100.00%

01.10.05
01.10.05.01
01.11
01.11.01
02
02.01

1290.02

AREAS VERDES
SUMINISTRO E INSTAL. DE AREAS VERDES

m2

72.27

17.85

MITIGACION DE IMPACTO AMBIENTAL

1290.02
7435.66

MITIGACION DE IMPACTO AMBIENTAL


GLB

7435.66

7435.66
24567.67

EQUIPAMIENTO

6235.57

MOBILIARIOS

02.01.01

MESAS CIRCULARES

und

75.63

378.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.00

378.15

100.00%

02.01.02

COCINA INDUSTRIAL

und

805.09

805.09

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

805.09

100.00%

02.01.03

SILLAS PARA NIVEL INICIAL

und

20

42.02

840.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.00

840.40

100.00%

02.01.04

ESTANTE AULAS NIVEL INICIAL

und

168.07

504.21

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

3.00

504.21

100.00%

02.01.05

ESTANTE PARA DOCENTES

und

151.26

151.26

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

151.26

100.00%

02.01.06

ESCRITORIO PARA DOCENTE

und

378.15

378.15

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

378.15

100.00%

02.01.07

SILLAS PARA DOCENTES

und

159.66

159.66

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

159.66

100.00%

02.01.08

ESCRITORIO PARA DIRECCION

und

381.36

381.36

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

381.36

100.00%

02.01.09

SILLAS PARA AMBIENTE ADMINISTRATIVO

und

159.66

319.32

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

319.32

100.00%

02.01.10

MESAS PARA AMBIENTE ADMINISTRATIVO

und

109.24

109.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

109.24

100.00%

02.01.11

ESTANTE PARA AMBIENTE ADMINISTRATIVO

und

180.67

361.34

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

2.00

361.34

100.00%

02.01.12

ARCHIVADOR PARA DIRECCION

und

152.54

152.54

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

152.54

100.00%

02.01.13

SILLAS PARA SALA DE USOS MULTIPLES

und

20

42.37

847.4

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

20.00

847.40

100.00%

02.01.14

MESAS PARA SALA DE USOS MULTIPLES

und

169.49

847.45

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

5.00

847.45

100.00%

02.02

2332.1

EQUIPOS

02.02.01

REPRODUCTOR DE D.V.D.

und

285

285

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

285.00

100.00%

02.02.02

TELEVISOR A COLOR 32"

und

1650

1650

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

1,650.00

100.00%

02.02.03

RACK PARA TV Y DVD

und

142.86

142.86

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

142.86

100.00%

02.02.04

CAMPANA EXTRACTORA DE HUMO

und

254.24

254.24

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

254.24

100.00%

Pagina 26 de 27

VALORIZACION N 01 DEL 16 DE NOVIEMBRE 2015 AL 30 DE NOVIEMBRE 2015


MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LAS INSTITUCIONES EDUCATIVAS PUBLICAS N 429-114 EN LA COMUNIDAD DE CHIHUA Y N429-115 EN LA COMUNIDAD DE
NUEVA UNION PITEC, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

OBRA

SUBPROYECTO:

MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA I.E.I.P N 429-114 EN LA COMUNIDAD DE CHIHUA, DISTRITO DE IGUAIN- HUANTA-AYACUCHO

SUPERVISA :

CONSORCIO IGUAIN EDUCACION

EJECUTA :

CONSORCIO PROGRESO

INICIO DE OBRA 16/11/2015


TERMINO DE OBRA 14/03/2016

PLAZO DE EJECUCION:

N 164-2015-MDI/GM

CONTRATO

02.03

Metrado

Precio S/.

MES:

NOVIEMBRE 2,015

120 DIAS CALENDARIOS

ANTERIOR

Descripcin
Und.

16/11/15 AL 30/11/15

AVANCES FISICOS

PRESUPUESTO BASE
Item

PERIODO

Parcial S/.

METRA
DO

Parcial S/.

EN EL MES
PORCENT METRAD
AJE
O

SALDO

ACUMULADO

Parcial S/.

PORCENTAJE

METRAD
O

Parcial S/.

PORCENTAJ
METRADO
E

Parcial S/.

PORCENTAJE

16000

MATERIALES

02.03.01

MODULO DE MATERIALES DE ESCRITORIO NIVEL INICIAL

und

7500

7500

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

7,500.00

100.00%

02.03.02

MODULO DE MATERIAL DIDACTICO NIVEL INICIAL

und

8500

8500

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

8,500.00

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

5,000.00

100.00%

0.00

0.00%

0.00

0.00%

0.00

0.00

0.00%

1.00

4,550.00

100.00%

03
03.01
03.01.01
03.02
03.02.01

9550

CAPACITACION Y GESTION EDUCATIVA

5000

CAPACITACION DOCENTE
CAPACITACION DOCENTE NIVEL INICIAL

GLB

5000

5000
4550

GESTION EDUCATIVA
GLB

GESTION EDUCATIVA
COSTO DIRECTO

4550

4550

0.00

779,508.30

0.00

119,524.29

119,524.29

659,984.02

115,756.98

0.00

17,749.36

17,749.36

98,007.63

35,190.18

0.00

5,395.81

5,395.81

29,794.36

SUB TOTAL

930,455.46

0.00

142,669.46

142,669.46

787,786.01

IGV

167,481.98

0.00

1,097,937.44

0.00

168,349.96

168,349.96

929,587.49

100.00%

0.00

168,349.96

168,349.96

929,587.49

GASTOS GENERALES
UTILIDADES

14.85%

4.514407%

18 %

TOTAL PRESUPUESTO

Pagina 27 de 27

0.00%

25,680.50

15.33%

25,680.50

15.33%

141,801.48

84.67%