Gustine Avenue was indicated as a primary area of concern for the neighborhood. Because this corridor is an area
of concern, it is recommended the following improvements be made on Gustine in the initial phase of
implementing neighborhood improvements. The goal of these recommendations is to slow traffic and enhance
pedestrian safety.
High visibility crosswalks and stop bars at each intersection
Repave Gustine North of Fairview
Edgeline striping
Painted medians
Item
Conceptual Costs
Gustine crosswalks
25,000
Gustine edgelines
10,000
25,000
Gustine TOTAL
$ 60,000
*excludes repaving
Morganford Road is identified as the second highest priority corridor within the neighborhood, thus it is
recommended improvements be made on this corridor within the second phase of plan implementation. It should
be noted the end of Ward 15 is the centerline of Morganford, so any improvements may be split and coordinated
with Alderman Vollmer.
Streetscaping plan
o Road diet
o LED Lighting
Edgeline striping
High visibility crosswalks at each intersection
Bumpouts with flexible bollards at most intersections (exception at Humphrey St., and Utah)
o Painted
o Vertical
Two additional stop signs
o Morganford and Hartford
o Morganford and Humphrey
Shared lane markings
Item
Conceptual Costs
15,000
Streetscape striping
15,000
50,000
Signage
500
Morganford TOTAL
$ 80,500
Painted Median
Grand was identified as a priority for residents within the neighborhood based on input from the initial public
meeting as well as the project survey.
Continental crosswalks and stop bars
Install/upgrade pedestrian curb ramps (where necessary South of McDonald)
South Grand streetscape extension Utah to Potomac
Conceptual Costs
Striping (crosswalks/stop-bars)
25,000
30,000
Streetscape striping
8,000
$ 750,000
$ 200,000
$ 100,000
$ 8,000
$ 200,000
$ 100,000
$ 8,000
$ 50,000
$ 200,000
$ 100,000
$ 8,000
$ 200,000
$1,663,000 - $1,087,000