Sei sulla pagina 1di 3

Click to BUY:

http://onlinehomework.guru/a-process-issaid-to-be-capable-and-acceptable-when/
A process is said to be capable and acceptable when
1. A process is said to be capable and acceptable when?
It meets customer requirements
There are no defects produced
It is capable of fitting within the spec limit
2. In a measurement system evaluation (MSE), measurement error?
Is displayed as dots on a chart
Shows up in the width of the control limits for both the x-bar portion and the range portion
Is acceptable when there are no points of control on the x bar portion of the chart
Reveals within peace variation
3.A way to avoid bias in a Measurement System Evaluation (MSE) study is to?
Use only calibrated measurement devices
Use a different measurement device for each of the three operators
Reset each of the measurement system between each of the trial
Mix up the order of the samples so that the operators are not bias
4.When using pre-control while running, what should you do when the first piece you check falls in
the yellow?
Stop running and return to set up rules
Keep running since you are still in spec
Check the second piece
Reset your limits
5.Choose the correct statements?
Defectives can me numerous on one product
Defects can me numerous on one product

A defect means an absolute bad product


A product with one defect is generally scrapped

6.The Central Limit Theorem states that the distribution of the sample means approaches normal?
Only when the parent population is normal
Only when the parent population is lognormal
Regardless of the shape of the parent population
Only when the number of samples gets greater then 100
7.Which of the following is NOT an assignable cause on a control chart?
Shift
Trend
A point not within the specification limits
A point outside of the control limits
8.Which of the following statements regarding the normal curve is not true?
It indicates that the process is normally distributed
It indicates that no factors or combination of factors is unduly influencing the process
It says nothing about the center of the process variation
It is a Gaussian distribution
9.Cp or Pp is a measure of?
Dispersion compared with the specification spread
Centering compared with the specification spread
Dispersion and centering as compared with the specification spread
The control of a process
10.In this phase of initiating an improved process, we may simulate the improvement using
mathematical or computer based modeling?
Design
Pilot

Implementation
Sustain

Potrebbero piacerti anche