Work Order Daily Report

Date

16-Nov-10
Total WON

Craft

UPELEC

PM03

Description

Status

PM INDUCTION MOTOR 444-PM-01A (H)

PM02
Description

Clos

Rel

Clos

Rel

Status
Y

PM01
T

Description

Chech & rectify VRU-B

Termination cable for LPG Tie In

Clos

Rel

Clos Rel

Status

Y
Clos

T
Rel

Clos

Rel
1

PM INDUCTION MOTOR 444-PM-02A (H)

UPINST

UPMECH

PRESSURE TRANSMITTER CHECK (2Y)

TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-103

Chech & rectify VRU-B (check & reinstall intrumentation)

TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-113

482-FT-430A Deethanizer Reflux Flow

TEMPERATURE TRANSMITTER CHECK (2Y)/381-TT-123

445-FI-261 Fuel Gas to Hot Oil Heater

OVERHEAD CRANE MAINTENANCE (H)

SD Block Valve 137-PV-101A Gas/gas Excha

Install vacuum breaker at HiPo pckg MoC

CRUDE OIL METERING SKID (H)

Chech & rectify VRU-B (rotor repair : days,and compressor assembly :2days)
Fire Water LPGF Plant leaks, 451-SVP-019
151-P-02B leak in three point.#

SUM

16

18

10

Ket :
Red font Job yesterday and continued by today
Black fontJob by today

10

10