Sei sulla pagina 1di 19

Location: Zone 6, Culianan, ZC.

25-May-15 to 26-May-15
Given:
Line Pressure ( P )
Size of damage ( D)
Duration of leak (t)

= 10 psi
= 100 mm or 10 cm
= 21 hrs

Formula used :
P = h ;
V=(2gh);
Q= AV
Vol= Qt
Computation:
P = h ;

10 lb/in2

h=

62.43 lbs/ft3

h=
h=

1ft
12in

276.79 in
23.06 ft

V=(2gh);

V= 2(32.2ft/s)(23.06ft)

V=38.54 ft/s

A=

_D_
4

= (10cm x in/2.54cm x 1ft/12in)


4
A= 0.0845 ft
Q= AV;
Q= 0.0845 ft (38.54 ft/sec)
Q= 3.26 ft/sec
Vol = Qt;
Vol = 3.26 ft/sec (21 hrs x 3600 sec/hr)
= 246,456 ft x (1m/3.28 ft)

Vol.= 6,984.22 m

1ft
12in

Location: Fernando Compound, Sta. Maria, ZC.


31-Mar-15 to 01-April-15
Given:
Line Pressure ( P )
Size of damage ( D)
Duration of leak (t)

= 18 psi
= 50 mm or 5 cm
= 24 hrs

Formula used :
P = h ;
V=(2gh);
Q= AV
Vol= Qt
Computation:
P = h ;

18 lb/in2

h=

62.43 lbs/ft3

h=
h=

1ft
12in

498.22 in
41.52 ft

V=(2gh);

V= 2(32.2ft/s)(41.52ft)

V= 51.71 ft/s

A=

_D_
4

= (5cm x in/2.54cm x 1ft/12in)


4
A= 0.0211 ft
Q= AV;
Q= 0.0211 ft (51.71 ft/sec)
Q= 1.09 ft/sec
Vol = Qt;
Vol = 1.09 ft/sec (24 hrs x 3600 sec/hr)
= 94,176 ft x (1m/3.28 ft)

Vol.= 2,668.82 m

Location: Presa, Canelar (Perimeter Fence of KCC Mall Construction Site), ZC.
31-Mar-15 to 01-April-15
Given:
Line Pressure ( P )
Size of damage ( D)
Duration of leak (t)

= 6 psi
= 19 mm or 1.9 cm
= 72 hrs

Formula used :
P = h ;
V=(2gh);
Q= AV
Vol= Qt
Computation:
P = h ;

6 lb/in2

h=

62.43 lbs/ft3

h=
h=

1ft
12in

166.07 in
13.84 ft

V=(2gh);

V= 2(32.2ft/s)(13.84ft)

V= 29.85 ft/s

A=

_D_
4

= (1.9cm x in/2.54cm x 1ft/12in)


4
A= 0.00305 ft
Q= AV;
Q= 0.00305 ft (29.85 ft/sec)
Q= 0.091 ft/sec
Vol = Qt;
Vol = 0.091 ft/sec (72 hrs x 3600 sec/hr)
= 23,587.20 ft x (1m/3.28 ft)

Vol.= 668.43 m

Republic of the Philippines


ZAMBOANGA CITY WATER DISTRICT
Pilar st., Zamboanga City

ACCOUNTED WATER LOSS DUE TO PIPE DAMAGES


ZONE 6, CULIANAN, ZAMBOANGA CITY
TIME

DATE
start

DURATION
end

(hours)

LINE
PRESSURE
(psi)

5/25/2015

1:00 PM

12:00 AM

11.00

10

5/26/2015

12:00 AM

10:00 AM

10.00

10

FERNANDO COMPOUND, STA. MARIA, ZAMBOANGA CITY


TIME

DATE
start

DURATION
end

(hours)

LINE
PRESSURE
(psi)

3/31/2015

4:00 PM

12:00 AM

8.00

18

4/1/2015

12:00 AM

4:00 PM

16.00

18

PRESA, CANELAR (PERIMETER OF KCC MALL CONSTRUCTION SITE) ZAMBOANGA CITY


TIME

DATE
start

DURATION
end

(hours)

LINE
PRESSURE
(psi)

7/17/2015

1:00 PM

12:00 AM

11.00

7/18/2015

12:00 AM

12:00 AM

24.00

7/19/2015

12:00 AM

12:00 AM

24.00

7/20/2015

12:00 AM

1:00 PM

13.00

the Philippines
TY WATER DISTRICT
amboanga City

SS DUE TO PIPE DAMAGES

N, ZAMBOANGA CITY

VOLUME
cum

DAMAGE ITEM
100mm PVC Pipe at Zone 6,
Culianan, ZC.
TOTAL

3,658.40
3,325.82
6,984.22

STA. MARIA, ZAMBOANGA CITY

VOLUME
cum

DAMAGE ITEM
50mm GI Pipe at Fernando
Compound, Sta. Maria, ZC.
TOTAL

889.61
1,779.21
2,668.82

ALL CONSTRUCTION SITE) ZAMBOANGA CITY

VOLUME
cum

DAMAGE ITEM

102.12
19mm PE Tubing at Presa,
Canelar, ZC. (Only 1 water service
connection)

222.81
222.81
120.69

TOTAL

668.43

Location: Infront KCC Mall Construction Site


7-Nov-15
Given:

Line Pressure ( P )
Size of damage ( D)
Duration of leak (t)

= 20 psi
= 25mm x 450mm
= 12 hrs

Formula used :
P = h ;
V=(2gh);
Q= AV
Vol= Qt
Computation:
P = h ;

20 lb/in2

h=

62.43 lbs/ft3

h=
h=

1ft
12in

553.58 in
46.13 ft

V=(2gh);

V= 2(32.2ft/s)(46.13ft)

V= 54.51 ft/s

A=_base x height
= (2.5cmx45cm)x(in/2.54cm x 1ft/12in)
A= 0.1211 ft
Q= AV;
Q= 0.1211 ft (54.51 ft/sec)
Q= 6.601 ft/sec
Vol = Qt;
Vol = 6.601 ft/sec (12 hrs x 3600 sec/hr)
= 285,163.20 ft x (1m/3.28 ft)
Vol.= 8,081.13 m

Republic of the Philippines


ZAMBOANGA CITY WATER DISTRICT
Pilar st., Zamboanga City

ACCOUNTED WATER LOSS DUE TO PIPE DAMAGES


INFRONT KCC MALL CONSTRUCTION SITE
TIME

DATE
start
11/7/2015

1:00 AM

(hours)

LINE
PRESSURE
(psi)

12

20

DURATION
end
1:00 PM

he Philippines
Y WATER DISTRICT
mboanga City

SS DUE TO PIPE DAMAGES


CONSTRUCTION SITE

VOLUME
cum

DAMAGE ITEM
2.5CM X 45CM LONGITUDINAL
DAMAGE OF 150MM PVC
PIPELINE
TOTAL

8,081.13
8,081.13

Republic of the Philip


ZAMBOANGA CITY WATE
Pilar st., Zamboanga

ACCOUNTED WATER LOSS DU

ZAMBOWOOD, ZAMBOAN
TIME

DATE
start

DURATION
end

(hours)

LINE
PRESSURE
(psi)

11/27/2015

1:00 PM

12:00 AM

11.00

10

11/28/2015

12:00 AM

12:00 AM

24.00

10

11/29/2015

12:00 AM

12:00 AM

24.00

10

11/30/2015

12:00 AM

12:00 AM

24.00

10

12/1/2015

12:00 AM

12:00 AM

24.00

10

12/2/2015

12:00 AM

12:00 AM

24.00

10

12/3/2015

12:00 AM

12:00 AM

24.00

10

12/4/2015

12:00 AM

10:00 AM

10.00

10

COVARRUBIAS DRIVE, DIVISORIA, Z


TIME

DATE
start

DURATION
end

(hours)

LINE
PRESSURE
(psi)

12/11/2015

8:00 PM

12:00 AM

4.00

10

12/12/2015

12:00 AM

6:00 AM

6.00

10

2:00 PM

3:00 PM

1.00

10

Republic of the Philippines


ZAMBOANGA CITY WATER DISTRICT
Pilar st., Zamboanga City

COUNTED WATER LOSS DUE TO PIPE DAMAGES


ZAMBOWOOD, ZAMBOANGA CITY
h = P/

DAMAGE ITEM

Velocity

area

discharge
ft3/sec

(ft2)

100mm PVC Pipe at


Zamboowood, ZC.

23.07

1,485.44

38.54

0.0845

3.26

23.07

1,485.44

38.54

0.0845

3.26

23.07

1,485.44

38.54

0.0845

3.26

23.07

1,485.44

38.54

0.0845

3.26

23.07

1,485.44

38.54

0.0845

3.26

23.07

1,485.44

38.54

0.0845

3.26

23.07

1,485.44

38.54

0.0845

3.26

23.07

1,485.44

38.54

0.0845

3.26

TOTAL

COVARRUBIAS DRIVE, DIVISORIA, ZAMBOANGA CITY


h = P/

DAMAGE ITEM

Velocity

area

discharge
ft3/sec

(ft2)
50mm PE Tubing at Covarrubias
Drive, Divisoria
TOTAL

23.07

1,485.44

38.54

0.00305

0.118

23.07

1,485.44

38.54

0.00305

0.118

23.07

1,485.44

38.54

0.00305

0.118

VOLUME
ft3

VOLUME
cum

129,096.00

3,658.40

281,664.00

7,981.96

281,664.00

7,981.96

281,664.00

7,981.96

281,664.00

7,981.96

281,664.00

7,981.96

281,664.00

7,981.96

117,360.00

3,325.82
54,875.98

VOLUME
ft3

VOLUME
cum

1,699.20

48.15

2,548.80

72.23

424.80

12.04
132.42

Location: Presa, Canelar (Perimeter Fence of KCC Mall Construction Site), ZC.
31-Mar-15 to 01-April-15
Given:
Line Pressure ( P )
Size of damage ( D)
Duration of leak (t)

= 6 psi
= 19 mm or 1.9 cm
= 72 hrs

Formula used :
P = h ;
V=(2gh);
Q= AV
Vol= Qt
Computation:
P = h ;

6 lb/in2

h=

62.43 lbs/ft3

h=
h=

1ft
12in

166.07 in
13.84 ft

V=(2gh);

V= 2(32.2ft/s)(13.84ft)

V= 29.85 ft/s

A=

_D_
4

= (1.9cm x in/2.54cm x 1ft/12in)


4
A= 0.00305 ft
Q= AV;
Q= 0.00305 ft (29.85 ft/sec)
Q= 0.091 ft/sec
Vol = Qt;
Vol = 0.091 ft/sec (72 hrs x 3600 sec/hr)
= 23,587.20 ft x (1m/3.28 ft)

Vol.= 668.43 m

Location: Zone 6, Culianan, ZC.


27-Nov-15 to 04-Dec-15
Given:
Line Pressure ( P )
Size of damage ( D)
Duration of leak (t)

= 10 psi
= 100 mm or 10 cm
= 165 hrs

Formula used :
P = h ;
V=(2gh);
Q= AV
Vol= Qt
Computation:
P = h ;

10 lb/in2

h=

62.43 lbs/ft3

h=
h=

1ft
12in

276.79 in
23.06 ft

V=(2gh);

V= 2(32.2ft/s)(23.06ft)

V=38.54 ft/s

A=

_D_
4

= (10cm x in/2.54cm x 1ft/12in)


4
A= 0.0845 ft
Q= AV;
Q= 0.0845 ft (38.54 ft/sec)
Q= 3.26 ft/sec
Vol = Qt;
Vol = 3.26 ft/sec (165 hrs x 3600 sec/hr)
= 246,456 ft x (1m/3.28 ft)

Vol.= 6,984.22 m