ee ea eee aaa rete instar
CONFIDENTIAL OP 1306
‘ (PRELIMINARY)
BOMB DIRECTOR =
MARKT MODO 8
(AN/ASG-10(XN))
DESCRIPTION AND INSTRUCTIONS FOR USE
6 APRIL 1945
yp’
This pabllcapek is CONFIDENTIAL and will be handled in Accordance with
Article 76 United States Navy Regulations, 1920
+ aA 1945, < ABCORDS SECTION. warpEA SEE ee) Le GEL ee MO ee
(a
ae
ir
NAVY DEPARTMENT
BUREAU OF ORDNANCE,
WASHINGTON 25, D.C.
CONFIDENTIAL 6 April 1945
ORDNANCE PAMPHLET 1306 (PRELIMINARY)
BOMB DIRECTOR MARK 1 MOD 0 (AN/ASG-10 (XN))—
DESCRIPTION AND INSTRUCTIONS FOR USE
J. Ordnance Pamphlet 1306 (Preliminary) describes Bomb Diree-
tor Mark 1 Mod 0 (AN/ASG-10 (XN)), and contains instructions foo
the use of this equipment,
2. This publication is intended for all personnel coneerned with the
Thon servicing of Bomb Director Mark 1 Mod 0 (AN/ASG-10 (XN) ).
The overhaul of this equipment is outside the scope of this pamphlet,
‘and will be covered in publications from other sources.
&. Because of the urgent need for this information, it has been
‘issued in preliminary form. This pamphlet will be revised and ieuet ir
complete, final form as soon as practicable.
4. This pamphlet does not supersede any existing publication,
5. This publication is CONFIDENTIAL and shall be safeguarded
mpenteordance with the security provisions of U. S. Navy Regulations, j
1920, Article 76,
G.F. Husspy, Jr.
Rear Admiral, U.S. Navy
Ohief of the Bureau of Ordnance4 ‘ TABLE OF CONTENTS
INTRODUCTION -...-- 5
‘What it is—Purpose—Where it is used 5
How it is used --.... 6
OPERATION .-..---+ 7
‘Altimeter Setting . 7
Power 7
Gyro Caging - 7
Operational Limits . 7
‘The Sight - 8
Sighting and Windagt oe]
Pullout ...+++++ 2g.
AND ADJUSTMENTS: .- ®
COMPARISON OF BOMBING TECHNIQUES .- 10
FUNCTIONAL DESCRIPTION OF OPERATION 10
Altimeter ---..++ ohaqpneee as 1B
Gyro. 20
INSTALLATION...----0---- 20
Control Box Mk 8 Mod 0 . a
Computer Mk 20 Mod 0 21
| Junction Box Mk 11 Mod 0 aL
‘Transfer Switch Box Mk 2 Mod 0 aL
‘Altimeter Unit Mk 1 Mod 0 . 21
Gyro Mk 20 Mod 0 22
Indicator Light cd 22,
22
Bomb Release Switch (Button) ...
! ADJUSTMENTS ---
Gyro --.-++
‘To Check Running o! :
‘To Check Altimeter Connections
USE OF TEST UNIT MK 16 MOD 0.
“piming Check in Plane .....++++++
‘Timing Check on the Bench .....++
‘Adjustinent of Gyro End Resistor (Vo)
Gyro Resistor Continuity ..-.+...++++
Possible Malfunctions of Test Unit
MAINTENANCE...
‘Maintenance Check-off List ......+++- + aT |
Trouble Shooting «-..- big : 28 |
CONFIDENTIAL 3