PRICE MATRIX
Steel Structure without primer
$ = US-DOLLAR
Especificacion CFE
DOUBLE V HOLDING
< 300 t
< 1000 t
AVERAGE
(650T)
> 1000 t
NORTE III
1,499.30t
> 2000 t
> 3000 t
3.75
3.81
3.75
3.77
3.81
3.77
$/kg
$/kg
$/kg
0.70
0.86
1.08
0.97
1.31
1.53
$/kg
0.37
0.52
0.75
0.63
0.97
1.19
$/kg
$/kg
$/kg
Observaciones y/o
Aclaraciones:
Configurations
Price adder: primer
PRIMARIO
Standar
CFE:
D8500Version:
2012;
Thinkness:
150; Layers: 1
Standar
CFE:
D8500Version:
2012;
Thinkness:
75; Layers: 1
$/kg
0.63
0.63
0.63
0.63
0.63
0.63
$/kg
0.09
0.07
0.09
0.01
0.09
0.07
0.09
0.01
0.09
0.07
0.09
0.01
0.09
0.07
0.09
0.01
0.09
0.07
0.09
0.01
0.09
0.07
0.09
0.01
$/kg
$/kg
$/kg
$/kg
0.09
0.04
0.08
0.09
0.04
0.08
0.09
0.04
0.08
0.09
0.04
0.08
0.09
0.04
0.08
0.09
0.04
0.08
$/kg
$/kg
$/kg
$/kg
< 300 t
< 1000 t
> 1000 t
918t
> 2000 t
> 3000 t
4.30
4.35
4.30
4.24
4.33
4.31
0.45
0.50
0.58
0.50
0.66
0.74
Manzanillo, Colima
Altamaira, Tamps.
Veracruz, Ver.
Origin of Raw Material (Country): MEXICO
required tons
Minimum
Time of
quantity
materail
of raw materials
procurement
(tons)
(weeks)
GB-Material
DIN/EN-Material
ASTM-Material
Configurations
Price adder: primer
PRIMARIO
CFE-P11 .- Primario Inorganico de
Zinc.(CFE-P11 .-Primary Inorganic of Zinc.)
$/kg
$/kg
$/kg
$/kg
$/kg
0.13
0.18
0.26
0.18
0.34
0.42
Standar
CFE:
D8500Version:
2012;
Thinkness:
80; Layers: 1
$/kg
$/kg
$/kg
Standar
CFE:
D8500Version:
2012;
Thinkness:
75; Layers: 1
$/kg
Option
Transport to NORTE (onSite)
Transport to VALLE DE MEXICO (onSite)
Transport to TOPOLOBAMPO (onSite)
Transport to NORESTE (onSite)
0.14
0.11
0.15
0.02
0.14
0.11
0.15
0.02
0.14
0.11
0.15
0.02
0.14
0.11
0.15
0.02
0.14
0.11
0.15
0.02
0.14
0.11
0.15
0.02
$/kg
$/kg
$/kg
$/kg
0.16
0.07
0.13
0.16
0.07
0.13
0.16
0.07
0.13
0.16
0.07
0.13
0.16
0.07
0.13
0.16
0.07
0.13
$/kg
$/kg
$/kg
$/kg
Manzanillo, Colima
Altamira, Tamps.
Veracruz, Ver.
Advance payment: 40 %.
Downloading materials in place by other.
Guarantees/Warranty.
Insurances.