Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Project:
Date:
Piping Material:
Section
Example
xxxxxx
PVC Schedule 40
Pipe Size
Flow
(inches) (gal/min)
Pressure
Loss
(ft/100ft)
SUM 1
10.0
3/4
8.0
10.0
1/2
2.0
No.
Components
Equivalent
Length (ft)
90 deg Elbows
45 deg Elbows
2.5
1.4
2.0
4.0
Straight Pipe
1.0
20.0
5.0
5.6
0.0
0.0
20.0
30.6
Tee
90 deg Elbows
1.4
2.5
2.0
4.0
Straight Pipe
1.0
12.0
90 deg Elbows
45 deg Elbows
2.5
1.4
2.0
4.0
Straight Pipe
1.0
10.0
9.6
SUM 4
Equivalent
Length of
Component (ft)
15.0
SUM 3
System
Components
9.6
SUM 2
Note!
Adapt to the flow and pressure loss units to the data available for your system
Tee
90 deg Elbows
1.4
2.5
2.0
4.0
Balanc. Valve
Straight Pipe
21.0
1.0
1.0
12.0
8.0
Total SUM
The EngineeringToolBox.com
Total
Total
Section
Pressure
Pressure
Pressure
Loss - Path Loss - Path
Loss (ftH20)
1 (ftH2O)
2 (ftH2O)
2.9
2.9
2.8
10.0
0.0
0.0
12.0
24.8
3.7
3.7
5.0
5.6
0.0
0.0
10.0
20.6
2.0
2.0
2.8
10.0
0.0
21.0
12.0
45.8
3.7
2.0
3.7
8.6
303388500.xls
2.9
8.6
02/05/2016