UNIMECH SYSTEMS RNAIPL PROJECT SCHEDULE ( TRIM SHOP )

S.No

Feb 16 22

Description
M

Mechnical Side
1

Air Washer System

Ducts

Double Deflection Grill

MS Angle

Threaded Rod with Bolt,Nut, Washers

Purlin clamps

GI Pipes

Ball Valves

MS Structure

10

MS ISMB200 Srtucture

11

MS Channels ,Angles

Eelectrical Side
12

MCCB Breaker

13

LT Panel

14

LT Cables

15

LT Cables Termination

16

Cable Trays

17

Cable Tray - Steel Supports

18

12mm Threaded Rod with Nuts and


washers

19

Purlin Clamps

20

"C" Strut

21

GI Flat

Feb 23 Mar 1
S

Th F

Mar 2 Mar 8
S

Mar 9 Mar 15
S

Mar 16 Mar 22
S

Mar 23 Mar
S

22

Earthing Cable - 1C X 10Sqmm with


Termination

23

Push Buttons

24

Safety Items

PL PROJECT SCHEDULE ( TRIM SHOP )


Mar 23 Mar 29
W

Mar 30 Apr 5
S

REMARKS
S

80% DELIVERED

DELIVERED
DELIVERED

DELIVERED
DELIVERED

Waiting For
Approval

To Be Confirmed

DELIVERED
To Be Confirmed
DELIVERED

DELIVERED