Sei sulla pagina 1di 87

STRUCTURAL STEEL

01 01
29537

04- 2673738

DUBAI, UAE

04-2673663

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MASTER INDEX
SN

Description

SECTION 1

HOW TO USE THE MANUAL


1.1. Layout of O&M Manual
1.2. Scope of Manual
1.3. Guide to Contents

SECTION 2

GENERAL OVERVIEW
2.1. Introduction
2.2 Brief Description of Fabrication &
Installation.

SECTION 3

DESCRIPTION
3.1 Product
3.2 Location and Purpose
3.3 Design Data
3.4 Reason for Selection

SECTION 4

MATERIAL SCHEDULE
4.1 Material Schedule
4.2 Manufacturers and Suppliers

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 1 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SN

Description

SECTION 5

PARTS IDENTIFICATION AND


RECOMMENDED SPARES
5.1 Spare Parts List
5.2 Manufacturing and Shipping Time
Required for Imported Spare Parts

SECTION 6

OPERATION
6.1 Operation Procedure

SECTION 7

MAINTENANCE
7.1 Routine Maintenance
7.2 Maintenance for Painting if any damages
7.3 Maintenance for Fire proofing if any
Damages
7.4 Schedule for maintenance and inspection
For Fire proofing
7.5 Warranty for Fire proofing

SECTION 8

DISPOSAL INSTRUCTION

SECTION 9

NAME AND ADDRESS OF MANUFACTURER

SECTION 10

EMERGENCY INFORMATION

SECTION 11

MANUFACTURERS LITERATURE
11.1 Operation & Maintenance Details
11.2 As Built Drawings

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 2 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION - 1

HOW TO USE THE


MANUAL
INDEX
1.1
1.2
1.3

Layout of O&M Manual


Scope of Manual
Guide to Contents

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 3 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

1. HOW TO USE THE MANUAL


This operation and maintenance manual and its objective of providing to the
reader with an overall & general view of design intent information required for
operation and maintenance of Fire Proofing & Painting supplied & Applied by
Eversendai Engineering L.L.C

1.1 Layout of O&M Manual


This O&M manual has been organized and created to facilitate the reader to a
magnitude of general information, manufactures literature, drawings, system details
and other informations on the fire proofing & Painting. No attempt has been made to
furnish the basic technical details as it is presumed that only qualified and trained
manpower will be employed for the operation and maintenance of the equipment

1.2 Scope of Manual


This Maintenance manual was created to provide the reader and/or user on how
the fire proofing and painting shall be maintained. To ensure safe and appropriate usage
of the fire proofing and painting, please read the manual carefully prior to start using it.
Not following the proper instruction may damage the fire proofing and painting.

1.3 Guide to content


This manual is intended to provide an overview of the maintenance, operation &
description of the supplied material on the building. The master index gives of the
various sections & numbering in order to identify readily & locate specific information.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 4 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION - 2

GENERAL OVERVIEW
INDEX
2.1. Introduction
2.2 Brief Description of Fabrication & Installation.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 5 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

2.1.

Introduction

This Operation and Manual covers structural steel works to the Alshams Tower 1
(AST) at Al reem island project, Abu Dhabi, U.A.E.
In order to have good finish, high grade structural steel member are being used
to construct the structure. In generally, the structural steel members dont
require the maintenance expect protective coating and any special arrangement
if applicable
In this structure, the structural members have been applied with two different
paint systems & Fire proofing and it is explained briefly as follows
1. Main Columns

2 Coat system with 200 microns

2. Skypod Columns

3 Coat system with 250 microns

3. Floor Beams from Level GF to Level 73 2 Hours fire rating.


4. Outrigger Plates & Columns @ Level 20&21 and Level 40&41 2 Hours
fire rating
The details of the said paint system are explained briefly in the following
sections.
Other than that the designed steel members have been fabricated and assembled
at site by welding and bolting as per design requirement and as per approved
drawings.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 6 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

2.2

Brief Description of Fabrication &


Installation.

FIRE PROOFING

1. Prior to the application of Monokote Type MK-6/HY, an inspection shall

be made to determine that all steel surfaces are acceptable to receive


fireproofing. The steel to be fireproofed shall be free of oil, grease, excess
rolling mill scale, excess rust, non-compatible primer, lock down agent or
any other substance that will impair proper adhesion. When necessary,
the cleaning of steel surfaces to receive fireproofing shall be the
responsibility of the general contractor.
2. The project architect shall determine if the painted/primed structural
steel to receive fireproofing is compatible with Monokote MK-6/HY.

3. Many Fire Resistance Designs allow the use of painted metal floor or
roof deck in place of galvanized decking. Painted decking must be UL listed
in the specific fire resistance designs and must carry the UL classification
marking.
4. Prior to application of Monokote Type MK-6/HY, a bonding agent,
approved by the fireproofing manufacturer, shall be applied to all concrete
substrates to receive Type MK-6/HY.
5. Fireproofing to the underside of roof deck assemblies shall be done
only after roofing application is complete and roof traffic has ceased.
6. No fireproofing shall be applied prior to completion of concrete work
on steel decking.
Features
Proven in-place performance
Low in-place cost
Fast, efficient application
UL tested Building Code compliance (ICBO, SBCCI, BOCA, NBCC)

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 7 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 3

DESCRIPTION
INDEX
3.1
3.2
3.3
3.4

Product
Location and Purpose
Design Data
Reason for Selection

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 8 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

3.1

Product

Please refer the attached manufacturers catalogue

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 9 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 10 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 11 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 12 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 13 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 14 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 15 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 16 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 17 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 18 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 19 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 20 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 21 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 22 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 23 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

3.2
PAINT:

Location and Purpose


LOCATION

Level: Ground floor to Level 73


FIRE PROOFING:

Level: Ground floor to Level 73

PURPOSE
PAINT:

Corrosion protection & Finishing of Structural Steel


FIRE PROOFING:

Fire Protection (2 Hours Fire rating for Structural Steel)

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 24 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

3.3

Design Data

FIRE PROOFING :
Monokote Type MK-6/HY
Physical Properties

Value*

Test Method

Dry Density, minimum


average

240 kg/m3 (15 pcf)

ASTM E 605, UBC STD 7-6

Bond Strength

16.2 KPa (339 psf)

ASTM E-736

Compression, 10%
Deformation

68.9 KPa (1,440 psf)

ASTM E-761

Air Erosion

0.000 g/m2 (0.000 g/ft2)

ASTM E-859

High Velocity Air Erosion

No continued erosion after 4 hours

ASTM E-859, UMC STD 6-1

Corrosion

Does not contribute to corrosion

ASTM E-937

Bond Impact

No cracking, spalling or
delamination

ASTM E-760

Deflection

No cracking, spalling or
delamination

ASTM E-759

Resistance to Mold Growth

No growth after 60 days

ASTM G 21

Surface Burning
Characteristics

Flame Spread

Smoke Developed

ASTM E-84

Combustibility

Less than 5 MJ/m2 total, 20 kw/m2


peak heat release

ASTM E-1354

Impact Penetration

3.3 cm3

Developed by City of San


Francisco

Abrasion Resistance

8.3 cm3

Developed by City of San


Francisco

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 25 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 26 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 27 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 28 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 29 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 30 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 31 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 32 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

3.4

Reason for Selection

NOT APPLICABLE

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 33 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 4

MATERIAL SCHEDULE

INDEX
4.1
4.2

Material Schedule
Manufacturers and Suppliers

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 34 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

4.1 Material Schedule


PAINT
For Main Columns (Level: Ground floor to level 41)
Primer:

Carboguard - E19 & Thinner # 15 (75 Microns)

Intermediate / Final Coat:

Carboguard - 893 MIO (Grey) & Thinner # 2 (125 Microns)


Total: 200 Microns

For Skypod Columns (Level: 12 to 73)


Primer:

Carboguard - E19 & Thinner # 15 (75 Microns)

Intermediate Coat:

Carboguard - 893 MIO (Grey) & Thinner # 2 (125 Microns)

Final Coat:

Carbothane 834 (White) & Thinner # 25 (50 Microns)


Total: 250 Microns

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 35 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

FIRE PROOFING ( Level GF to 73 )


MUEHLHAN PROCON EMIRATES L.L.C.

PROJECT LOADING SCHEDULE - REV 2


CLIENT : M/s EVERSENDAI ENGINEERING
PROJECT: AL SHAMS TOWER
CEMENTITIOUS FIREPROOFING ON STRUCTURAL STEEL
FIRE RATING 2 HOURS / BS 476-21
MATERIAL USED - MONOKOTE MK- 6 / HY
S.No.

Member Type

Size

Coating Sides

DFT (mm)

Angle ( Deck Support ) ( L42 to L72)

EA 70x70x8

29

Angle ( Deck Support in Skypod


Column
& Skypod Beam ) ( L42 to L72 )

EA 100X100X10

25

Skypod Column ( L3 to L72 )

CHS 457x12

ALL

15

Skypod Beam ( L3 to L72 )

UB 356x171x51

29

Embedment ( L42 to L72 )

PL 20x300x340

Exposed
Locations

21

Canopy ( L1, L2, L6, & L8 )

EA 100x100x8

Exposed
Locations

29

Canopy ( L1, L2, L6, & L8 )

PFC 300x100x45.5

Exposed
Locations

25

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 36 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
S.No.

Member Type

Size

Coating Sides

DFT (mm)

Canopy ( L1, L2, L6, & L8 )

RHS 450x250x16

Exposed
Locations

15

Canopy ( L1, L2, L6, & L8 )

SHS 250x250x9

Exposed
Locations

18

10

Canopy ( L1, L2, L6, & L8 )

UC 305x305x158

Exposed
Locations

18

11

Retrofit ( Level - 05 )

UB 203x133x25

34

12

Retrofit ( Level - 05 )

UC 356x368x129

21

13

Retrofit ( Level - 05 )

UC 356x368x153

18

14

Retrofit ( Level - 05 )

F 400x30 B 390x12

18

Note
1

All thickness (DFT) is extracted from Warrington fire research test report - Table 1 as per
BS 476:Part 21

For each steel section sizes, thickness of fireproofing is selected in combination of the section factor HP/A
or m-1 and the period of fire rating hours.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 37 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

4.2 Manufacturers and Suppliers


EVERSENDAI ENGG L.L.C
#33, Al Qusais Industrial Area #1,
Road #204, 19th Street,
P.O.Box:29537, DUBAI, U.A.E.
Tel: 04-2673738, Fax: 04-2673663
www.eversendai.com

STONECOR MIDDLE EAST L.L.C


P.O.Box : 3034, Dubai, U.A.E
Tel: 04-3470460, Fax: 04-3470242
Email : Stoncor@emirates.net.ae

ARABIAN VERMICULITE INDUSTRIES


P.O.Box : 7137, Dammam 31462, Saudi Arabia
Tel: 00966-3-8471450, Fax: 00966-8471575

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 38 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 5

PARTS IDENTIFICATION AND


RECOMMENDED SPARES
INDEX
5.1 Spare Parts List
5.2

Manufacturing and Shipping Time Required for Imported Spare


Parts

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 39 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

5.1 Spare Parts List

NOT APPLICABLE

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 40 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

5.2 Manufacturing and Shipping Time Required for


Imported Spare Parts

NOT APPLICABLE

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 41 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 6

OPERATION

INDEX
6.1 Operation Procedure

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 42 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

6.1 Operation Procedure


Cementitious fireproof coating is inorganic fireproofing formulation
single Powder component that is mixed with potable water. Impact resistance for this
material is very low, mechanical impact on these surfaces should be avoided. Pressure
water should not be forced on cementitious fireproof surfaces.
Above impacts can result in damaging the cementitious coatings which
affects the Fire resistance of the steel structure. But in case if any of this damages take
place on the fireproofed surfaces, below mentioned repairing procedure shall be
followed.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 43 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 7

MAINTENANCE
INDEX
7.1 Routine Maintenance
7.2 Maintenance for Painting if any damages.
7.3 Maintenance for Fire proofing if any damages.
7.4 Schedule for maintenance and inspection for fire proofing
7.5 Warranty for Fire proofing

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 44 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

7.1 Routine Maintenance


NOT APPLICABLE

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 45 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

7.2 Maintenance for Painting if any damages


Epoxy polymide (Primer), Cycoaliphatic Amine Epoxy (Intermediate coat) & Acrylic
aliphatic polyurethane ( Final Coat ).

Use/Location

Internally
steelwork

exposed

&

Concealed

Paint Manufacturer
Shop Preparation

:
:

Stonecor Middle east L.L.C


Blast clean to Preparation Grade Sa2
(BS 7079 Part A1 SA 2.5).

Shop Primer
Dry Film Thickness
Colour
Environmental

:
:
:
:

Carboguard E 19
75 m minimum
Grey
VOC: 413 g/l

Shop Intermediate
Dry Film Thickness
Colour
Environmental

:
:
:
:

Carboguard 893 MIO


125 m minimum
Grey
VOC: 216 g/l

Shop Top Coat

Dry Film Thickness


Colour
Environmental

:
:
:

Carbothane 834 (Skypod Columns only


)
50 m minimum
Grey
VOC: 352 g/l

Refer to Carboline Protective Coatings Carbothane 834 Recommended Working


Procedures to be read in conjunction with the Carbothane 834 technical data
sheet and material safety data sheet (MSDS). Provided information is to be
strictly adhered to. If the steel fabricator does not have the capability of applying
the complete specified two coat system at works then they are to subcontract the
painting programme to a contractor recommended by International Protective
Coatings.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 46 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

Surface Preparation and Touch Up at Site


Surface Preparation
Mark damaged area.
Presence of oil/grease should be removed using a suitable degreaser.
Presence of soluble contaminants should be removed using sweet water.
Damage to Primer
Area less than 0.1 sq.meter power tool clean to St 3, to bare metal, using 80 disc
sander, feather edge to sound coating min. 50 mm.
Apply
Primer : Carboguard E 19 - Grey Min. DFT of 75 microns
Followed by
Int. Coat : Carboguard 893 MIO -Grey Min. DFT of 125 microns
Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only )
Damage to Int Coat
Area less than 0.1 sq.meter Hand tool clean to St 2, to primer, using 80 disc
emery paper, feather edge to sound coating min. 50 mm.
Apply
Int. Coat : Carboguard 893 MIO -Grey Min. DFT of 125 microns
Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only )
Damage to Top Coat
Area less than 0.1 sq.meter Hand tool clean to St 2, to intermediate coat, using 80
disc emery paper, feather edge to sound coating min. 50 mm.
Apply
Top Coat : Carbothane 834 - Min. DFT of 50 microns (Skypod Columns only )

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 47 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

7.3 Maintenance for Fire proofing if any damages


Cementitious fireproofing that has been damaged or removed may be repaired
by hand rush box or hand trowelling freshly mixed product to the affected areas.
Where damage occurs to fireproof coating, but where the damage does not
Penetrate through the primer to the steel surface, then the loose coating should be
knocked down around the affected area. Scratch and rough the existing surface to
achieve the best
possible adhesion.
The removed surface should then be cleaned with potable water or sweep air
blast.
If existing coating has become very dry, dampen the surfaces adjacent to the
repair area with potable water. Thoroughly soak existing coating with clean potable
water to ensure Adhesion with new material to be placed.
Mix the cementitious fireproofing material in accordance with the Mixing
Procedure of manufactures application instruction.
Apply cementitious fireproofing material using hand rush box or mason spoon
and trowel to finish level with existing surface.
If more than one coat is required ensure that preceding coats are left with a
rough finish well scratched to ensure good bonding of subsequent coats.
MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 48 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
When patch is dry cover with hesin cloth, polythene sheet and cure as specified.
Where the damage is more severe, resulting in damage to the primer system
exposing bare steel (particularly in external and humid internal conditions), then the
primer should be touched up with a zinc rich epoxy primer and allowed to dry, prior to
the application of cementitious fireproof coating material. It may be necessary to
remove a further area of fireproof coating surrounding the exposed steel to facilitate
primer touch-up depending on the scale of damage.
If the thickness of the patch is greater than 13 mm (1/2), multiple coats will be
necessary. Application of more thickness may result in cracking and extended drying
times.
Materials to be used
Monokote MK-6/HY
Potable water for mixing

Safety
Monokote MK-6/HY Material are Non-hazardous material as per the
manufacturers material Safety data sheet. Dust masks shall be used while mixing and
application.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 49 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

7.4 Schedule for maintenance and inspection for Fire


proofing

Inspection Schedule
1 First Inspection August 2011
2 Second Inspection August 2013
3 Third Inspection August 2015
4 Fourth Inspection August 2017
5 Fifth Inspection August 2019
Notes
All necessary access, equipments access to the fireproofing locations, removal
of obstructions to access to be provided by the client for free charge.

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 50 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

7.5 Warranty for Fire proofing

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 51 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 52 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 8

DISPOSAL INSTRUCTION
NOT APPLICABLE

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 53 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 9

NAME AND ADDRESS OF


MANUFACTURER

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 54 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

NAME AND ADDRESS OF MANUFACTURER

STRUCTURAL STEEL WORKS


EVERSENDAI ENGG L.L.C
#33, Al Qusais Industrial Area #1,
Road #204, 19th Street,
P.O.Box:29537, DUBAI, U.A.E.
Tel: 04-2673738, Fax: 04-2673663
www.eversendai.com

PAINTING WORKS
STONECOR MIDDLE EAST L.L.C
P.O.Box: 3034, Dubai, U.A.E
Tel: 04-3470460, Fax: 04-3470242
Email: Stoncor@emirates.net.ae

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 55 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

FIRE PROOFING WORKS


CONTACT LIST - APPLICATOR
Applicator Name :
Procon Emirates L.L.C.
Contact Name
:
Nagarajan Kothandan
Designation
:
Project Manager
Mobile
:
050 4454951
Telephone
:
02-6218662
Fax
:
02-6218829
E-mail
:
kothandan@muehlhan.com
Address
:
P.O. Box 27388
Location
:
Abu Dhabi
Country
:
UAE
CONTACT LIST SUPLLIER
Supplier Name :
Arabian Vermiculite Industries (AVI)
Contact Name
:
Yogesh Harnal
Designation
:
Sales Manager
Mobile
:
050 6440691
Telephone
:
04-2211966
Fax
:
04-2238600
E-mail
:
Yogesh:Harnal@eim.ae
Address
:
P.O. Box 7137
Location
:
Dammam
Country
:
Kingdom of Saudi Arabia

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 56 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 10

EMERGENCY INFORMATION

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 57 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

STRUCTURAL STEEL WORKS


NORMAL WORKING HOURS

SATURDAY TO THURSDAY :
06.30 am to 06.30 pm

CONTACT PERSON

Mr.N.S.Rao
Regional Director

COMPANY ADDRESS

EVERSENDAI ENGINEERING L.L.C


# 33, Al Qusais Industrial Area # 1, Road # 204
19 th. Street, Post Box : 29537,Dubai, U.A.E
Tele : 04-2673738, Fax : 04-2673663

Email id

sendai@emirates.net.ae

Website

www.eversendai.com

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 58 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

FIRE PROOFING WORKS


APPLICATOR
CONTACT PERSON &
COMPANY ADDRESS

Mr. Gautam Arya


General Manager
PROCON EMIRATES L.L.C
Post Box : 27388,Abudhabi, U.A.E
Tele : 02-6218662, Fax : 02-6218829
Email id : procon@eim.ae
Website : www.muehlhan.com
ARABIAN VERMICULITE INDUSTRIES

PRODUCT
SUPPLIER DETAILS

P.O.Box : 7137, Dammam 31462, Saudi Arabia


Tel: 00966-3-8471450, Fax: 00966-8471575

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 59 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

PAINTING WORKS
STONECOR MIDDLE EAST L.L.C

PRODUCT
SUPPLIER DETAILS

P.O.Box : 3034, Dubai, U.A.E


Tel: 04-3470460, Fax: 04-3470242
Email : Stoncor@emirates.net.ae

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 60 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

SECTION 11

MANUFACTURERS LITERATURE
INDEX
11.1 Operation & Maintenance Details
11.2 As Built Drawings

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 61 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

11.1 Operation & Maintenance Details

NOT APPLICABLE

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 62 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL

11.2 As Built
Drawings

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 63 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

T1C-C-AR-S-C10-0001 ST-1

GF GA PLAN

T1C-C-AR-S-C10-0002 ST-1

LEVEL 1 GA PLAN

T1C-C-AR-S-C10-0003 ST-1

LEVEL 1 SECTIONAL DETAILS-1

T1C-C-AR-S-C10-0004 ST-1

LEVEL 1 SECTIONAL DETAILS-2

T1C-C-AR-S-C10-0005 ST-1

LEVEL 1 EMBEDMENT DETAILS-1

T1C-C-AR-S-C10-0006 ST-1

LEVEL 1 CONNECTION DETAILS-1

T1C-C-AR-S-C10-0007 ST-1

LEVEL 1 CONNECTION DETAILS-2

T1C-C-AR-S-C10-0008 ST-1

LEVEL 1 EMBEDMENT DETAILS-2

T1C-C-AR-S-C10-0009 ST-1

LEVEL 1 EMBEDMENT DETAILS-4

10

T1C-C-AR-S-C10-0010 ST-1

LEVEL 1 EMBEDMENT DETAILS-5

11

T1C-C-AR-S-C10-0011 ST-1

LEVEL 1 CONNECTION DETAILS-6

12

T1C-C-AR-S-C10-0013 ST-1

TOWER-1 COLUMN SPLICE DETAILS

13

T1C-C-AR-S-C10-0014 ST-1

LEVEL-1 CANOPY GA PLAN

14

T1C-C-AR-S-C10-0015 ST-1

LVL-1 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

15

T1C-C-AR-S-C10-0357 ST-01

LVL-1 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

16

T1C-C-AR-S-C10-P01-0001

LEVEL 1 EMBEDMENT LAYOUT & DETAILS-1

17

T1C-C-AR-S-C10-P01-0002

LEVEL 1 EMBEDMENT LAYOUT & DETAILS-2

18

TIC-C-AR-S-C10-01-D8001-01

LEVEL-1 DECKING SECTIONS & DETAILS

19

TIC-C-AR-S-C10-01-GA006-01

LEVEL -1 DECKING LAYOUT

20

T1C-C-AR-S-C10-0016 ST-1

LEVEL 2 CANOPY GA PLAN

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 64 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

21

T1C-C-AR-S-C10-0017 ST-1

LEVEL 2 CANOPY ROOF SUPPORT SECTIOS & CONNECTION DETAILS

22

T1C-C-AR-S-C10-0018 ST-1

LEVEL 2 GA PLAN

23

T1C-C-AR-S-C10-0023 ST-1

LEVEL-2 CONNECTION DETAILS-1

24

T1C-C-AR-S-C10-0024 ST-1

LEVEL-2 CONNECTION DETAILS-2

25

T1C-C-AR-S-C10-0025 ST-1

LEVEL-2 CONNECTION DETAILS-3

26

T1C-C-AR-S-C10-0026 ST-1

LEVEL-2 CONNECTION DETAILS-4

27

T1C-C-AR-S-C10-0027 ST-1

LEVEL-2 CONNECTION DETAILS-5

28

T1C-C-AR-S-C10-0028 ST-1

LEVEL-2 CONNECTION DETAILS-6

29

T1C-C-AR-S-C10-0029 ST-1

LEVEL-2 CONNECTION DETAILS-7

30

T1C-C-AR-S-C10-0030 ST-1

LEVEL-2 CONNECTION DETAILS-8

31

T1C-C-AR-S-C10-02-E9001

LEVEL 2 EMBEDMENT DETAILS-1

32

T1C-C-AR-S-C10-02-E9002

LEVEL 2 EMBEDMENT DETAILS-2

33

T1C-C-AR-S-C10-02-GA002

LEVEL 2 EMBEDMENT LAYOUT.

34

T1C-C-AR-S-C10-0383 ST-01

LEVEL-02 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

35

TIC-C-AR-S-C10-02-D8001-01

LEVEL-2 DECKING SECTIONS & DETAILS

36

TIC-C-AR-S-C10-02-GA006-01

LEVEL -2 DECKING LAY OUT

37

T1C-C-AR-S-C10-0019 ST-1

LEVEL 3 GA PLAN

38

T1C-C-AR-S-C10-0031 ST-1

LEVEL-3 CONNECTION DETAILS-1

39

T1C-C-AR-S-C10-0032 ST-1

LEVEL-3 CONNECTION DETAILS-2

40

T1C-C-AR-S-C10-0033 ST-1

LEVEL-3 CONNECTION DETAILS-3

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 65 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

41

T1C-C-AR-S-C10-0034 ST-1

LEVEL-3 CONNECTION DETAILS-4

42

T1C-C-AR-S-C10-0035 ST-1

LEVEL-3 CONNECTION DETAILS-5

43

T1C-C-AR-S-C10-0036 ST-1

LEVEL-3 CONNECTION DETAILS-6

44

T1C-C-AR-S-C10-0037 ST-1

LEVEL-3 CONNECTION DETAILS-7

45

T1C-C-AR-S-C10-0038 ST-1

LEVEL-3 CONNECTION DETAILS-8

46

T1C-C-AR-S-C10-0039 ST-1

LEVEL-3 CONNECTION DETAILS-9

47

T1C-C-AR-S-C10-03-E9001

LEVEL 3 EMBEDMENT DETAILS-1

48

T1C-C-AR-S-C10-03-E9002

LEVEL 3 EMBEDMENT DETAILS-2

49

T1C-C-AR-S-C10-03-GA002

LEVEL 3 EMBEDMENT LAYOUT.

50

TIC-C-AR-S-C10-03-D8001-01

LEVEL-3 DECKING SECTIONS & DETAILS

51

TIC-C-AR-S-C10-03-GA006-01

LEVEL -3 DECKING LAY OUT

52

T1C-C-AR-S-C10-0020 ST-1

LEVEL

53

T1C-C-AR-S-C10-0040 ST-1

LEVEL-4 CONNECTION DETAILS-1

54

T1C-C-AR-S-C10-0041 ST-1

LEVEL-4 CONNECTION DETAILS-2

55

T1C-C-AR-S-C10-0042 ST-1

LEVEL-4 CONNECTION DETAILS-3

56

T1C-C-AR-S-C10-0043 ST-1

LEVEL-4 CONNECTION DETAILS-4

57

T1C-C-AR-S-C10-0044 ST-1

LEVEL-4 CONNECTION DETAILS-5

58

T1C-C-AR-S-C10-0045 ST-1

LEVEL-4 CONNECTION DETAILS-6

59

T1C-C-AR-S-C10-0046 ST-1

LEVEL-4 CONNECTION DETAILS-7

60

T1C-C-AR-S-C10-0047 ST-1

LEVEL-4 CONNECTION DETAILS-8

4 GA PLAN

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 66 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

61

T1C-C-AR-S-C10-0048 ST-1

LEVEL-4 CONNECTION DETAILS-9

62

T1C-C-AR-S-C10-04-E9001

LEVEL 4 EMBEDMENT DETAILS-1

63

T1C-C-AR-S-C10-04-E9002

LEVEL 4 EMBEDMENT DETAILS-2

64

T1C-C-AR-S-C10-04-GA002

LEVEL-4 EMBEDMENT LAYOUT

65

TIC-C-AR-S-C10-04-D8001-01

LEVEL-4 DECKING SECTIONS & DETAILS

66

TIC-C-AR-S-C10-04-GA006-01

LEVEL -4 DECKING LAY OUT

67

T1C-C-AR-S-C10-0021 ST-1

LEVEL 5 GA PLAN

68

T1C-C-AR-S-C10-0049 ST-1

LEVEL-5 CONNECTION DETAILS-1

69

T1C-C-AR-S-C10-0050 ST-1

LEVEL-5 CONNECTION DETAILS-2

70

T1C-C-AR-S-C10-0051 ST-1

LEVEL-5 CONNECTION DETAILS-3

71

T1C-C-AR-S-C10-0052 ST-1

LEVEL-5 CONNECTION DETAILS-4

72

T1C-C-AR-S-C10-0053 ST-1

LEVEL-5 CONNECTION DETAILS-5

73

T1C-C-AR-S-C10-0054 ST-1

LEVEL-5 CONNECTION DETAILS-6

74

T1C-C-AR-S-C10-05-E9001

LEVEL 5 EMBEDMENT DETAILS-1

75

T1C-C-AR-S-C10-05-GA002

LEVEL-5 EMBEDMENT LAYOUT

76

TIC-C-AR-S-C10-05-D8001-01

LEVEL-5 DECKING SECTIONS & DETAILS

77

TIC-C-AR-S-C10-05-GA006-01

LEVEL -5 DECKING LAY OUT

78

T1C-C-AR-S-C10-05-RF-GA001

Marking Plan of Retrofit Beam @ Under HCS

79

T1C-C-AR-S-C10-0055 ST-1

LEVEL 6 GA PLAN

80

T1C-C-AR-S-C10-0056 ST-1

LEVEL-6 CONNECTION DETAILS-1

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 67 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

81

T1C-C-AR-S-C10-0057 ST-1

LEVEL-6 CONNECTION DETAILS-2

82

T1C-C-AR-S-C10-0058 ST-1

LEVEL-6 CONNECTION DETAILS-3

83

T1C-C-AR-S-C10-0059 ST-1

LEVEL-6 CONNECTION DETAILS-4

84

T1C-C-AR-S-C10-0060 ST-1

LEVEL-6 CONNECTION DETAILS-5

85

T1C-C-AR-S-C10-0061 ST-1

LEVEL-6 CONNECTION DETAILS-6

86

T1C-C-AR-S-C10-0062 ST-1

LEVEL-6 CONNECTION DETAILS-7

87

T1C-C-AR-S-C10-0388 ST-01

LEVEL-6 CANOPY GA PLAN

88

T1C-C-AR-S-C10-0389 ST-01

LEVEL-6 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

89

T1C-C-AR-S-C10-0390 ST-01

LEVEL-6 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

90

T1C-C-AR-S-C10-06-E9001

LEVEL-6 EMBEDMENT DETAILS-1

91

T1C-C-AR-S-C10-06-GA002

LEVEL-6 EMBEDMENT LAYOUT

92

TIC-C-AR-S-C10-06-D8001-01

LEVEL- 6 DECKING SECTIONS & DETAILS

93

TIC-C-AR-S-C10-06-GA006-01

LEVEL- 6 DECKING LAYOUT

94

T1C-C-AR-S-C10-0064 ST-01

LEVEL 7 GA PLAN

95

T1C-C-AR-S-C10-0065 ST-01

LEVEL-7 CONNECTION DETAILS-1

96

T1C-C-AR-S-C10-0066 ST-01

LEVEL-7 CONNECTION DETAILS-2

97

T1C-C-AR-S-C10-0067 ST-01

LEVEL-7 CONNECTION DETAILS-3

98

T1C-C-AR-S-C10-0068 ST-01

LEVEL-7 CONNECTION DETAILS-4

99

T1C-C-AR-S-C10-0069 ST-01

LEVEL-7 CONNECTION DETAILS-5

100

T1C-C-AR-S-C10-0070 ST-01

LEVEL-7 CONNECTION DETAILS-6

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 68 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

101

TIC-C-AR-S-C10-07-D8001-01

LEVEL- 7 DECKING SECTIONS & DETAILS

102

TIC-C-AR-S-C10-07-GA006-01

LEVEL- 7 DECKING LAYOUT

103

T1C-C-AR-S-C10-07-E9001

LEVEL-7 TO 19 EMBEDMENT DETAILS-1

104

T1C-C-AR-S-C10-07-GA002

LEVEL-7 TO 19 EMBEDMENT LAYOUT

105

T1C-C-AR-S-C10-0071 ST-01

LEVEL 8 GA PLAN

106

T1C-C-AR-S-C10-0072 ST-01

LEVEL-8 CONNECTION DETAILS-1

107

T1C-C-AR-S-C10-0073 ST-01

LEVEL-8 CONNECTION DETAILS-2

108

T1C-C-AR-S-C10-0074 ST-01

LEVEL-8 CONNECTION DETAILS-3

109

T1C-C-AR-S-C10-0075 ST-01

LEVEL-8 CONNECTION DETAILS-4

110

T1C-C-AR-S-C10-0076 ST-01

LEVEL-8 CONNECTION DETAILS-5

111

T1C-C-AR-S-C10-0077 ST-01

LEVEL-8 CONNECTION DETAILS-6

112

T1C-C-AR-S-C10-0078 ST-01

LEVEL-8 CONNECTION DETAILS-7

113

T1C-C-AR-S-C10-0391 ST-01

LEVEL-8 CANOPY GENERAL ARRANGEMENT PLAN

114

T1C-C-AR-S-C10-0392 ST-01

LEVEL-8 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

115

T1C-C-AR-S-C10-0393 ST-01

LEVEL-8 CANOPY ROOF SUPPORT SECTIONS & CONNECTION DETAILS

116

TIC-C-AR-S-C10-08-D8001-01

LEVEL- 8 DECKING SECTIONS & DETAILS

117

TIC-C-AR-S-C10-08-GA006-01

LEVEL- 8 DECKING LAYOUT

118

T1C-C-AR-S-C10-0079 ST-01

LEVEL 9 GA PLAN

119

T1C-C-AR-S-C10-0080 ST-01

LEVEL-9 CONNECTION DETAILS-1

120

T1C-C-AR-S-C10-0081 ST-01

LEVEL-9 CONNECTION DETAILS-2

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 69 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

121

T1C-C-AR-S-C10-0082 ST-01

LEVEL-9 CONNECTION DETAILS-3

122

T1C-C-AR-S-C10-0083 ST-01

LEVEL-9 CONNECTION DETAILS-4

123

T1C-C-AR-S-C10-0084 ST-01

LEVEL-9 CONNECTION DETAILS-5

124

T1C-C-AR-S-C10-0085 ST-01

LEVEL-9 CONNECTION DETAILS-6

125

TIC-C-AR-S-C10-08-D8001-01

LEVEL- 9 to 19 DECKING SECTIONS & DETAILS

126

TIC-C-AR-S-C10-08-GA006-01

LEVEL- 9 to 19 DECKING LAYOUT

127

T1C-C-AR-S-C10-0086 ST-01

LEVEL 10 GA PLAN

128

T1C-C-AR-S-C10-0087 ST-01

LEVEL-10 CONNECTION DETAILS-1

129

T1C-C-AR-S-C10-0088 ST-01

LEVEL-10 CONNECTION DETAILS-2

130

T1C-C-AR-S-C10-0089 ST-01

LEVEL-10 CONNECTION DETAILS-3

131

T1C-C-AR-S-C10-0090 ST-01

LEVEL-10 CONNECTION DETAILS-4

132

T1C-C-AR-S-C10-0091 ST-01

LEVEL-10 CONNECTION DETAILS-5

133

T1C-C-AR-S-C10-0092 ST-01

LEVEL-10 CONNECTION DETAILS-6

134

T1C-C-AR-S-C10-0093 ST-01

LEVEL 11 GA PLAN

135

T1C-C-AR-S-C10-0094 ST-01

LEVEL-11 CONNECTION DETAILS-1

136

T1C-C-AR-S-C10-0095 ST-01

LEVEL-11 CONNECTION DETAILS-2

137

T1C-C-AR-S-C10-0096 ST-01

LEVEL-11 CONNECTION DETAILS-3

138

T1C-C-AR-S-C10-0097 ST-01

LEVEL-11 CONNECTION DETAILS-4

139

T1C-C-AR-S-C10-0098 ST-01

LEVEL-11 CONNECTION DETAILS-5

140

T1C-C-AR-S-C10-0099 ST-01

LEVEL-11 CONNECTION DETAILS-6

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 70 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

141

T1C-C-AR-S-C10-0114 ST-01

LEVEL 12 GA PLAN

142

T1C-C-AR-S-C10-0115 ST-01

LEVEL-12 CONNECTION DETAILS-1

143

T1C-C-AR-S-C10-0116 ST-01

LEVEL-12 CONNECTION DETAILS-2

144

T1C-C-AR-S-C10-0117 ST-01

LEVEL-12 CONNECTION DETAILS-3

145

T1C-C-AR-S-C10-0118 ST-01

LEVEL-12 CONNECTION DETAILS-4

146

T1C-C-AR-S-C10-0119 ST-01

LEVEL-12 CONNECTION DETAILS-5

147

T1C-C-AR-S-C10-0120 ST-01

LEVEL-12 CONNECTION DETAILS-6

148

T1C-C-AR-S-C10-0121 ST-01

LEVEL-12 CONNECTION DETAILS-7

149

T1C-C-AR-S-C10-0122 ST-01

LEVEL 13 GA PLAN

150

T1C-C-AR-S-C10-0123 ST-01

LEVEL-13 CONNECTION DETAILS-1

151

T1C-C-AR-S-C10-0124 ST-01

LEVEL-13 CONNECTION DETAILS-2

152

T1C-C-AR-S-C10-0125 ST-01

LEVEL-13 CONNECTION DETAILS-3

153

T1C-C-AR-S-C10-0126 ST-01

LEVEL-13 CONNECTION DETAILS-4

154

T1C-C-AR-S-C10-0127 ST-01

LEVEL-13 CONNECTION DETAILS-5

155

T1C-C-AR-S-C10-0128 ST-01

LEVEL-13 CONNECTION DETAILS-6

156

T1C-C-AR-S-C10-0129 ST-01

LEVEL-13 CONNECTION DETAILS-7

157

T1C-C-AR-S-C10-0130 ST-01

LEVEL 14 GA PLAN

158

T1C-C-AR-S-C10-0131 ST-01

LEVEL-14 CONNECTION DETAILS-1

159

T1C-C-AR-S-C10-0132 ST-01

LEVEL-14 CONNECTION DETAILS-2

160

T1C-C-AR-S-C10-0133 ST-01

LEVEL-14 CONNECTION DETAILS-3

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 71 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

161

T1C-C-AR-S-C10-0134 ST-01

LEVEL-14 CONNECTION DETAILS-4

162

T1C-C-AR-S-C10-0135 ST-01

LEVEL-14 CONNECTION DETAILS-5

163

T1C-C-AR-S-C10-0136 ST-01

LEVEL-14 CONNECTION DETAILS-6

164

T1C-C-AR-S-C10-0137 ST-01

LEVEL-14 CONNECTION DETAILS-7

165

T1C-C-AR-S-C10-0138 ST-01

LEVEL 15 GA PLAN

166

T1C-C-AR-S-C10-0139 ST-01

LEVEL-15 CONNECTION DETAILS-1

167

T1C-C-AR-S-C10-0140 ST-01

LEVEL-15 CONNECTION DETAILS-2

168

T1C-C-AR-S-C10-0141 ST-01

LEVEL-15 CONNECTION DETAILS-3

169

T1C-C-AR-S-C10-0142 ST-01

LEVEL-15 CONNECTION DETAILS-4

170

T1C-C-AR-S-C10-0143 ST-01

LEVEL-15 CONNECTION DETAILS-5

171

T1C-C-AR-S-C10-0144 ST-01

LEVEL-15 CONNECTION DETAILS-6

172

T1C-C-AR-S-C10-0145 ST-01

LEVEL-15 CONNECTION DETAILS-7

173

T1C-C-AR-S-C10-0146 ST-01

LEVEL 16 GA PLAN

174

T1C-C-AR-S-C10-0147 ST-01

LEVEL-16 CONNECTION DETAILS-1

175

T1C-C-AR-S-C10-0148 ST-01

LEVEL-16 CONNECTION DETAILS-2

176

T1C-C-AR-S-C10-0149 ST-01

LEVEL-16 CONNECTION DETAILS-3

177

T1C-C-AR-S-C10-0150 ST-01

LEVEL-16 CONNECTION DETAILS-4

178

T1C-C-AR-S-C10-0151 ST-01

LEVEL-16 CONNECTION DETAILS-5

179

T1C-C-AR-S-C10-0152 ST-01

LEVEL-16 CONNECTION DETAILS-6

180

T1C-C-AR-S-C10-0153 ST-01

LEVEL-16 CONNECTION DETAILS-7

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 72 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

181

T1C-C-AR-S-C10-0154 ST-01

LEVEL 17 GA PLAN

182

T1C-C-AR-S-C10-0155 ST-01

LEVEL-17 CONNECTION DETAILS-1

183

T1C-C-AR-S-C10-0156 ST-01

LEVEL-17 CONNECTION DETAILS-2

184

T1C-C-AR-S-C10-0157 ST-01

LEVEL-17 CONNECTION DETAILS-3

185

T1C-C-AR-S-C10-0158 ST-01

LEVEL-17 CONNECTION DETAILS-4

186

T1C-C-AR-S-C10-0159 ST-01

LEVEL-17 CONNECTION DETAILS-5

187

T1C-C-AR-S-C10-0160 ST-01

LEVEL-17 CONNECTION DETAILS-6

188

T1C-C-AR-S-C10-0161 ST-01

LEVEL-17 CONNECTION DETAILS-7

189

T1C-C-AR-S-C10-0162 ST-01

LEVEL 18 GA PLAN

190

T1C-C-AR-S-C10-0163 ST-01

LEVEL-18 CONNECTION DETAILS-1

191

T1C-C-AR-S-C10-0164 ST-01

LEVEL-18 CONNECTION DETAILS-2

192

T1C-C-AR-S-C10-0165 ST-01

LEVEL-18 CONNECTION DETAILS-3

193

T1C-C-AR-S-C10-0166 ST-01

LEVEL-18 CONNECTION DETAILS-4

194

T1C-C-AR-S-C10-0167 ST-01

LEVEL-18 CONNECTION DETAILS-5

195

T1C-C-AR-S-C10-0168 ST-01

LEVEL-18 CONNECTION DETAILS-6

196

T1C-C-AR-S-C10-0169 ST-01

LEVEL-18 CONNECTION DETAILS-7

197

T1C-C-AR-S-C10-0170 ST-01

LEVEL 19 GA PLAN

198

T1C-C-AR-S-C10-0171 ST-01

LEVEL-19 CONNECTION DETAILS-1

199

T1C-C-AR-S-C10-0172 ST-01

LEVEL-19 CONNECTION DETAILS-2

200

T1C-C-AR-S-C10-0173 ST-01

LEVEL-19 CONNECTION DETAILS-3

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 73 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

201

T1C-C-AR-S-C10-0174 ST-01

LEVEL-19 CONNECTION DETAILS-4

202

T1C-C-AR-S-C10-0175 ST-01

LEVEL-19 CONNECTION DETAILS-5

203

T1C-C-AR-S-C10-0176 ST-01

LEVEL-19 CONNECTION DETAILS-6

204

T1C-C-AR-S-C10-0177 ST-01

LEVEL-19 CONNECTION DETAILS-7

205

T1C-C-AR-S-C10-0100 ST-01

LEVEL-20 GA PLAN

206

T1C-C-AR-S-C10-0101 ST-01

LEVEL-21 GA PLAN

207

T1C-C-AR-S-C10-0102 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-1

208

T1C-C-AR-S-C10-0103 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-2

209

T1C-C-AR-S-C10-0104 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-3

210

T1C-C-AR-S-C10-0105 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-4

211

T1C-C-AR-S-C10-0106 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-5

212

T1C-C-AR-S-C10-0107 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-6

213

T1C-C-AR-S-C10-0108 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-7

214

T1C-C-AR-S-C10-0109 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-8

215

T1C-C-AR-S-C10-0110 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-9

216

T1C-C-AR-S-C10-0111 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-10

217

T1C-C-AR-S-C10-0112 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-11

218

T1C-C-AR-S-C10-0113 ST-01

LEVEL-20 & 21 TYPICAL SKYPOD DETAILS

219

T1C-C-AR-S-C10-0178 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-12

220

T1C-C-AR-S-C10-0179 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-13

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 74 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

221

T1C-C-AR-S-C10-0180 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-14

222

T1C-C-AR-S-C10-0181 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-15

223

T1C-C-AR-S-C10-0182 ST-01

LEVEL-20 & 21 SECTIONAL DETAILS-16

224

T1C-C-AR-S-C10-0186 ST-01

LEVEL 22 GA PLAN

225

T1C-C-AR-S-C10-0187 ST-01

LEVEL-22 CONNECTION DETAILS-1

226

T1C-C-AR-S-C10-0188 ST-01

LEVEL-22 CONNECTION DETAILS-2

227

T1C-C-AR-S-C10-0189 ST-01

LEVEL-22 CONNECTION DETAILS-3

228

T1C-C-AR-S-C10-0190 ST-01

LEVEL-22 CONNECTION DETAILS-4

229

T1C-C-AR-S-C10-0191 ST-01

LEVEL-22 CONNECTION DETAILS-5

230

T1C-C-AR-S-C10-0192 ST-01

LEVEL-22 CONNECTION DETAILS-6

231

T1C-C-AR-S-C10-0193 ST-01

LEVEL-22 CONNECTION DETAILS-7

232

T1C-C-AR-S-C10-11-E9001

LEVEL-22 TO 30 EMBEDMENT detail -01

233

TIC-C-AR-S-C10-09-GA006-01

LEVEL- 22 & 23 DECKING LAYOUT

234

TIC-C-AR-S-C10-09-D8001-01

LEVEL- 22 & 23 DECKING SECTION AND DETAILS

235

T1C-C-AR-S-C10-11-GA002

LEVEL-22 TO 30 EMBEDMENT LAYOUT

236

T1C-C-AR-S-C10-0194 ST-01

LEVEL 23 GA PLAN

237

T1C-C-AR-S-C10-0195 ST-01

LEVEL-23 CONNECTION DETAILS-1

238

T1C-C-AR-S-C10-0196 ST-01

LEVEL-23 CONNECTION DETAILS-2

239

T1C-C-AR-S-C10-0197 ST-01

LEVEL-23 CONNECTION DETAILS-3

240

T1C-C-AR-S-C10-0198 ST-01

LEVEL-23 CONNECTION DETAILS-4

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 75 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

241

T1C-C-AR-S-C10-0199 ST-01

LEVEL-23 CONNECTION DETAILS-5

242

T1C-C-AR-S-C10-0200 ST-01

LEVEL-23 CONNECTION DETAILS-6

243

T1C-C-AR-S-C10-0201 ST-01

LEVEL-23 CONNECTION DETAILS-7

244

T1C-C-AR-S-C10-0202 ST-01

LEVEL 24 GA PLAN

245

T1C-C-AR-S-C10-0203 ST-01

LEVEL-24 CONNECTION DETAILS-1

246

T1C-C-AR-S-C10-0204 ST-01

LEVEL-24 CONNECTION DETAILS-2

247

T1C-C-AR-S-C10-0205 ST-01

LEVEL-24 CONNECTION DETAILS-3

248

T1C-C-AR-S-C10-0206 ST-01

LEVEL-24 CONNECTION DETAILS-4

249

T1C-C-AR-S-C10-0207 ST-01

LEVEL-24 CONNECTION DETAILS-5

250

T1C-C-AR-S-C10-0208 ST-01

LEVEL-24 CONNECTION DETAILS-6

251

T1C-C-AR-S-C10-0209 ST-01

LEVEL-24 CONNECTION DETAILS-7

252

TIC-C-AR-S-C10-10-GA006-01

LEVEL- 24 to 30 DECKING LAYOUT

253

TIC-C-AR-S-C10-10-D8001-01

LEVEL- 24 to 30 DECKING SECTION AND DETAILS

254

T1C-C-AR-S-C10-0210 ST-01

LEVEL 25 GA PLAN

255

T1C-C-AR-S-C10-0211 ST-01

LEVEL-25 CONNECTION DETAILS-1

256

T1C-C-AR-S-C10-0212 ST-01

LEVEL-25 CONNECTION DETAILS-2

257

T1C-C-AR-S-C10-0213 ST-01

LEVEL-25 CONNECTION DETAILS-3

258

T1C-C-AR-S-C10-0214 ST-01

LEVEL-25 CONNECTION DETAILS-4

259

T1C-C-AR-S-C10-0215 ST-01

LEVEL-25 CONNECTION DETAILS-5

260

T1C-C-AR-S-C10-0216 ST-01

LEVEL-25 CONNECTION DETAILS-6

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 76 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

261

T1C-C-AR-S-C10-0217 ST-01

LEVEL-25 CONNECTION DETAILS-7

262

T1C-C-AR-S-C10-0218 ST-01

LEVEL 26 GA PLAN

263

T1C-C-AR-S-C10-0219 ST-01

LEVEL-26 CONNECTION DETAILS-1

264

T1C-C-AR-S-C10-0220 ST-01

LEVEL-26 CONNECTION DETAILS-2

265

T1C-C-AR-S-C10-0221 ST-01

LEVEL-26 CONNECTION DETAILS-3

266

T1C-C-AR-S-C10-0222 ST-01

LEVEL-26 CONNECTION DETAILS-4

267

T1C-C-AR-S-C10-0223 ST-01

LEVEL-26 CONNECTION DETAILS-5

268

T1C-C-AR-S-C10-0224 ST-01

LEVEL-26 CONNECTION DETAILS-6

269

T1C-C-AR-S-C10-0225 ST-01

LEVEL-26 CONNECTION DETAILS-7

270

T1C-C-AR-S-C10-0226 ST-01

LEVEL 27 GA PLAN

271

T1C-C-AR-S-C10-0227 ST-01

LEVEL-27 CONNECTION DETAILS-1

272

T1C-C-AR-S-C10-0228 ST-01

LEVEL-27 CONNECTION DETAILS-2

273

T1C-C-AR-S-C10-0229 ST-01

LEVEL-27 CONNECTION DETAILS-3

274

T1C-C-AR-S-C10-0230 ST-01

LEVEL-27 CONNECTION DETAILS-4

275

T1C-C-AR-S-C10-0231 ST-01

LEVEL-27 CONNECTION DETAILS-5

276

T1C-C-AR-S-C10-0232 ST-01

LEVEL-27 CONNECTION DETAILS-6

277

T1C-C-AR-S-C10-0233 ST-01

LEVEL-27 CONNECTION DETAILS-7

278

T1C-C-AR-S-C10-0234 ST-01

LEVEL 28 GA PLAN

279

T1C-C-AR-S-C10-0235 ST-01

LEVEL-28 CONNECTION DETAILS-1

280

T1C-C-AR-S-C10-0236 ST-01

LEVEL-28 CONNECTION DETAILS-2

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 77 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

281

T1C-C-AR-S-C10-0237 ST-01

LEVEL-28 CONNECTION DETAILS-3

282

T1C-C-AR-S-C10-0238 ST-01

LEVEL-28 CONNECTION DETAILS-4

283

T1C-C-AR-S-C10-0239 ST-01

LEVEL-28 CONNECTION DETAILS-5

284

T1C-C-AR-S-C10-0240 ST-01

LEVEL-28 CONNECTION DETAILS-6

285

T1C-C-AR-S-C10-0241 ST-01

LEVEL-28 CONNECTION DETAILS-7

286

T1C-C-AR-S-C10-0242 ST-01

LEVEL 29 GA PLAN

287

T1C-C-AR-S-C10-0243 ST-01

LEVEL-29 CONNECTION DETAILS-1

288

T1C-C-AR-S-C10-0244 ST-01

LEVEL-29 CONNECTION DETAILS-2

289

T1C-C-AR-S-C10-0245 ST-01

LEVEL-29 CONNECTION DETAILS-3

290

T1C-C-AR-S-C10-0246 ST-01

LEVEL-29 CONNECTION DETAILS-4

291

T1C-C-AR-S-C10-0247 ST-01

LEVEL-29 CONNECTION DETAILS-5

292

T1C-C-AR-S-C10-0248 ST-01

LEVEL-29 CONNECTION DETAILS-6

293

T1C-C-AR-S-C10-0249 ST-01

LEVEL-29 CONNECTION DETAILS-7

294

T1C-C-AR-S-C10-0250 ST-01

LEVEL 30 GA PLAN

295

T1C-C-AR-S-C10-0251 ST-01

LEVEL-30 CONNECTION DETAILS-1

296

T1C-C-AR-S-C10-0252 ST-01

LEVEL-30 CONNECTION DETAILS-2

297

T1C-C-AR-S-C10-0253 ST-01

LEVEL-30 CONNECTION DETAILS-3

298

T1C-C-AR-S-C10-0254 ST-01

LEVEL-30 CONNECTION DETAILS-4

299

T1C-C-AR-S-C10-0255 ST-01

LEVEL-30 CONNECTION DETAILS-5

300

T1C-C-AR-S-C10-0256 ST-01

LEVEL-30 CONNECTION DETAILS-6

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 78 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

301

T1C-C-AR-S-C10-0257 ST-01

LEVEL-30 CONNECTION DETAILS-7

302

T1C-C-AR-S-C10-0258 ST-01

LEVEL 31 GA PLAN

303

T1C-C-AR-S-C10-0259 ST-01

LEVEL-31 CONNECTION DETAILS-1

304

T1C-C-AR-S-C10-0260 ST-01

LEVEL-31 CONNECTION DETAILS-2

305

T1C-C-AR-S-C10-0261 ST-01

LEVEL-31 CONNECTION DETAILS-3

306

T1C-C-AR-S-C10-0262 ST-01

LEVEL-31 CONNECTION DETAILS-4

307

T1C-C-AR-S-C10-0263 ST-01

LEVEL-31 CONNECTION DETAILS-5

308

T1C-C-AR-S-C10-0264 ST-01

LEVEL-31 CONNECTION DETAILS-6

309

T1C-C-AR-S-C10-0265 ST-01

LEVEL-31 CONNECTION DETAILS-7

310

TIC-C-AR-S-C10-11-D8001-01

LEVEL- 31 DECKING SECTIONS & DETAILS

311

TIC-C-AR-S-C10-11-GA006-01

LEVEL- 31 DECKING LAYOUT

312

T1C-C-AR-S-C10-0266 ST-01

LEVEL 32 GA PLAN

313

T1C-C-AR-S-C10-0267 ST-01

LEVEL-32 CONNECTION DETAILS-1

314

T1C-C-AR-S-C10-0268 ST-01

LEVEL-32 CONNECTION DETAILS-2

315

T1C-C-AR-S-C10-0269 ST-01

LEVEL-32 CONNECTION DETAILS-3

316

T1C-C-AR-S-C10-0270 ST-01

LEVEL-32 CONNECTION DETAILS-4

317

T1C-C-AR-S-C10-0271 ST-01

LEVEL-32 CONNECTION DETAILS-5

318

T1C-C-AR-S-C10-0272 ST-01

LEVEL-32 CONNECTION DETAILS-6

319

T1C-C-AR-S-C10-0273 ST-01

LEVEL-32 CONNECTION DETAILS-7

320

TIC-C-AR-S-C10-12-GA006-01

LEVEL- 32 to 39 DECKING LAYOUT

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 79 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

321

TIC-C-AR-S-C10-12-D8001-01

LEVEL- 32 to 39 DECKING SECTION AND DETAILS

322

T1C-C-AR-S-C10-0274 ST-01

LEVEL 33 GA PLAN

323

T1C-C-AR-S-C10-0275 ST-01

LEVEL-33 CONNECTION DETAILS-1

324

T1C-C-AR-S-C10-0276 ST-01

LEVEL-33 CONNECTION DETAILS-2

325

T1C-C-AR-S-C10-0277 ST-01

LEVEL-33 CONNECTION DETAILS-3

326

T1C-C-AR-S-C10-0278 ST-01

LEVEL-33 CONNECTION DETAILS-4

327

T1C-C-AR-S-C10-0279 ST-01

LEVEL-33 CONNECTION DETAILS-5

328

T1C-C-AR-S-C10-0280 ST-01

LEVEL-33 CONNECTION DETAILS-6

329

T1C-C-AR-S-C10-0281 ST-01

LEVEL-33 CONNECTION DETAILS-7

330

T1C-C-AR-S-C10-0282 ST-01

LEVEL 34 GA PLAN

331

T1C-C-AR-S-C10-0283 ST-01

LEVEL-34 CONNECTION DETAILS-1

332

T1C-C-AR-S-C10-0284 ST-01

LEVEL-34 CONNECTION DETAILS-2

333

T1C-C-AR-S-C10-0285 ST-01

LEVEL-34 CONNECTION DETAILS-3

334

T1C-C-AR-S-C10-0286 ST-01

LEVEL-34 CONNECTION DETAILS-4

335

T1C-C-AR-S-C10-0287 ST-01

LEVEL-34 CONNECTION DETAILS-5

336

T1C-C-AR-S-C10-0288 ST-01

LEVEL-34 CONNECTION DETAILS-6

337

T1C-C-AR-S-C10-0289 ST-01

LEVEL-34 CONNECTION DETAILS-7

338

T1C-C-AR-S-C10-0290 ST-01

LEVEL 35 GA PLAN

339

T1C-C-AR-S-C10-0291 ST-01

LEVEL-35 CONNECTION DETAILS-1

340

T1C-C-AR-S-C10-0292 ST-01

LEVEL-35 CONNECTION DETAILS-2

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 80 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

341

T1C-C-AR-S-C10-0293 ST-01

LEVEL-35 CONNECTION DETAILS-3

342

T1C-C-AR-S-C10-0294 ST-01

LEVEL-35 CONNECTION DETAILS-4

343

T1C-C-AR-S-C10-0295 ST-01

LEVEL-35 CONNECTION DETAILS-5

344

T1C-C-AR-S-C10-0296 ST-01

LEVEL-35 CONNECTION DETAILS-6

345

T1C-C-AR-S-C10-0297 ST-01

LEVEL-35 CONNECTION DETAILS-7

346

T1C-C-AR-S-C10-0298 ST-01

LEVEL 36 GA PLAN

347

T1C-C-AR-S-C10-0299 ST-01

LEVEL-36 CONNECTION DETAILS-1

348

T1C-C-AR-S-C10-0300 ST-01

LEVEL-36 CONNECTION DETAILS-2

349

T1C-C-AR-S-C10-0301 ST-01

LEVEL-36 CONNECTION DETAILS-3

350

T1C-C-AR-S-C10-0302 ST-01

LEVEL-36 CONNECTION DETAILS-4

351

T1C-C-AR-S-C10-0303 ST-01

LEVEL-36 CONNECTION DETAILS-5

352

T1C-C-AR-S-C10-0304 ST-01

LEVEL-36 CONNECTION DETAILS-6

353

T1C-C-AR-S-C10-0305 ST-01

LEVEL-36 CONNECTION DETAILS-7

354

T1C-C-AR-S-C10-0306 ST-01

LEVEL 37 GA PLAN

355

T1C-C-AR-S-C10-0307 ST-01

LEVEL-37 CONNECTION DETAILS-1

356

T1C-C-AR-S-C10-0308 ST-01

LEVEL-37 CONNECTION DETAILS-2

357

T1C-C-AR-S-C10-0309 ST-01

LEVEL-37 CONNECTION DETAILS-3

358

T1C-C-AR-S-C10-0310 ST-01

LEVEL-37 CONNECTION DETAILS-4

359

T1C-C-AR-S-C10-0311 ST-01

LEVEL-37 CONNECTION DETAILS-5

360

T1C-C-AR-S-C10-0312 ST-01

LEVEL-37 CONNECTION DETAILS-6

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 81 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

361

T1C-C-AR-S-C10-0313 ST-01

LEVEL-37 CONNECTION DETAILS-7

362

T1C-C-AR-S-C10-0314 ST-01

LEVEL 38 GA PLAN

363

T1C-C-AR-S-C10-0315 ST-01

LEVEL-38 CONNECTION DETAILS-1

364

T1C-C-AR-S-C10-0316 ST-01

LEVEL-38 CONNECTION DETAILS-2

365

T1C-C-AR-S-C10-0317 ST-01

LEVEL-38 CONNECTION DETAILS-3

366

T1C-C-AR-S-C10-0318 ST-01

LEVEL-38 CONNECTION DETAILS-4

367

T1C-C-AR-S-C10-0319 ST-01

LEVEL-38 CONNECTION DETAILS-5

368

T1C-C-AR-S-C10-0320 ST-01

LEVEL-38 CONNECTION DETAILS-6

369

T1C-C-AR-S-C10-0321 ST-01

LEVEL-38 CONNECTION DETAILS-7

370

T1C-C-AR-S-C10-0330 ST-01

LEVEL-39 G A PLAN

371

T1C-C-AR-S-C10-0331 ST-01

LEVEL-39 CONNECTION DETAILS-1

372

T1C-C-AR-S-C10-0332 ST-01

LEVEL-39 CONNECTION DETAILS-2

373

T1C-C-AR-S-C10-0333 ST-01

LEVEL-39 CONNECTION DETAILS-3

374

T1C-C-AR-S-C10-0334 ST-01

LEVEL-39 CONNECTION DETAILS-4

375

T1C-C-AR-S-C10-0335 ST-01

LEVEL-39 CONNECTION DETAILS-5

376

T1C-C-AR-S-C10-0336 ST-01

LEVEL-39 CONNECTION DETAILS-6

377

T1C-C-AR-S-C10-0337 ST-01

LEVEL-39 CONNECTION DETAILS-7

378

T1C-C-AR-S-C10-39-E9001

LEVEL-39 EMBEDMENT DETAIL-01

379

T1C-C-AR-S-C10-39-GA002

LEVEL-39 EMBEDMENT LAYOUT

380

T1C-C-AR-S-C10-0338 ST-01

LEVEL-40 GA PLAN

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 82 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

381

T1C-C-AR-S-C10-0339 ST-01

LEVEL-41 GA PLAN

382

T1C-C-AR-S-C10-0340 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-1

383

T1C-C-AR-S-C10-0341 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-2

384

T1C-C-AR-S-C10-0342 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-3

385

T1C-C-AR-S-C10-0343 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-4

386

T1C-C-AR-S-C10-0344 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-5

387

T1C-C-AR-S-C10-0345 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-6

388

T1C-C-AR-S-C10-0346 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-7

389

T1C-C-AR-S-C10-0347 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-8

390

T1C-C-AR-S-C10-0348 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-9

391

T1C-C-AR-S-C10-0349 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-10

392

T1C-C-AR-S-C10-0350 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-11

393

T1C-C-AR-S-C10-0351 ST-01

LEVEL-40 & 41 TYPICAL SKYPOD DETAILS

394

T1C-C-AR-S-C10-0352 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-12

395

T1C-C-AR-S-C10-0353 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-13

396

T1C-C-AR-S-C10-0354 ST-01

LEVEL-40 & 41 SECTIONAL DETAILS-14

397

T1C-C-AR-S-C10-0355 ST-01

LEVEL-40M GA PLAN

398

T1C-C-AR-S-C10-0355 ST-01

LEVEL-40M GA PLAN

399

T1C-C-AR-S-C10-0356 ST-01

LEVEL-40M SECTIONAL DETAILS-1

400

T1C-C-AR-S-C10-0356 ST-01

LEVEL-40M SECTIONAL DETAILS-1

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 83 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

401

T1C-C-AR-S-C10-0359 ST-01

LEVEL-40M SECTIONAL DETAILS-2

402

T1C-C-AR-S-C10-0359 ST-01

LEVEL-40M SECTIONAL DETAILS-2

403

T1C-C-AR-S-C10-0360 ST-02

LEVEL-40 & 41 SECTIONAL DETAILS-15

404

T1C-C-AR-S-C10-0361 ST-02

LEVEL-40 & 41 SECTIONAL DETAILS-16

405

T1C-C-AR-S-C10-0362 ST-02

LEVEL-40 & 41 SECTIONAL DETAILS-17

406

T1C-C-AR-S-C10-0370 ST-01

LEVEL-42 GA PLAN

407

T1C-C-AR-S-C10-0425 ST-01

LEVEL 42-49 DECKING LAYOUT

408

T1C-C-AR-S-C10-0371 ST-01

LEVEL-43 GA PLAN

409

T1C-C-AR-S-C10-0372 ST-01

LEVEL-44 TO 49 GA PLAN

410

T1C-C-AR-S-C10-0373 ST-01

LEVEL-44 TO 49 CONNECTION DETAILS-1

411

T1C-C-AR-S-C10-0374 ST-01

LEVEL-50 GA PLAN

412

T1C-C-AR-S-C10-0424 ST-01

LEVEL- 50-72 DECKING LAYOUT

413

T1C-C-AR-S-C10-0375 ST-01

LEVEL-51 TO 55 GA PLAN

414

T1C-C-AR-S-C10-0376 ST-01

LEVEL-51 TO 55 CONNECTION DETAILS-1

415

T1C-C-AR-S-C10-0377 ST-01

LEVEL-56 GA PLAN

416

T1C-C-AR-S-C10-0378 ST-01

LEVEL-57 TO 65 GA PLAN

417

T1C-C-AR-S-C10-0379 ST-01

LEVEL-57 TO 65 CONNECTION DETAILS-1

418

T1C-C-AR-S-C10-0380 ST-01

LEVEL-66 GA PLAN

419

T1C-C-AR-S-C10-0381 ST-01

LEVEL-67 GA PLAN

420

T1C-C-AR-S-C10-0382 ST-01

LEVEL-68 GA PLAN

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 84 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

421

T1C-C-AR-S-C10-0406 ST-01

LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PLAN

422

T1C-C-AR-S-C10-0407 ST-01

LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-1

423

T1C-C-AR-S-C10-0408 ST-01

LEVEL-68A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-2

424

T1C-C-AR-S-C10-0412 ST-01

LEVEL-68A & 70A (ATTIC FLOOR) SECTION DETAILS-1

425

T1C-C-AR-S-C10-0413 ST-01

LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-1

426

T1C-C-AR-S-C10-0414 ST-01

LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-2

427

T1C-C-AR-S-C10-0426 ST-01

LEVEL-68A & 70A (ATTIC FLOOR) CONNECTION DETAIL-3

428

T1C-C-AR-S-C10-0402 ST-01

LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN

429

T1C-C-AR-S-C10-0402 ST-01

LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN

430

T1C-C-AR-S-C10-0402 ST-01

LEVEL 69 & 70 GENERAL ARRANGEMENT PLAN

431

T1C-C-AR-S-C10-0403 ST-01

LEVEL 69 & 70 CONNECTION DETAILS 1

432

T1C-C-AR-S-C10-0403 ST-01

LEVEL 69 & 70 CONNECTION DETAILS 1

433

T1C-C-AR-S-C10-0403 ST-01

LEVEL 69 & 70 CONNECTION DETAILS 1

434

T1C-C-AR-S-C10-0409 ST-01

LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PLAN

435

T1C-C-AR-S-C10-0410 ST-01

LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-1

436

T1C-C-AR-S-C10-0411 ST-01

LEVEL-70A (ATTIC FLOOR) GENERAL ARRANGEMENT PARTIAL PLAN-2

437

T1C-C-AR-S-C10-0404 ST-01

LEVEL-71 GENERAL ARRANGEMENT PLAN

438

T1C-C-AR-S-C10-0404 ST-01

LEVEL-71 GENERAL ARRANGEMENT PLAN

439

T1C-C-AR-S-C10-0404 ST-01

LEVEL-71 GENERAL ARRANGEMENT PLAN

440

T1C-C-AR-S-C10-0405 ST-01

LEVEL-72 GENERAL ARRANGEMENT PLAN

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 85 of 86

Shams Abu Dhabi Project


Sky Tower, Sun Tower & Podium
STRUCTURAL STEEL
OPERATION AND MAINTENANCE
MANUAL
SL.
NO.

DRAWING NO.

DRAWING TITLE

441

T1C-C-AR-S-C10-0405 ST-01

LEVEL-72 GENERAL ARRANGEMENT PLAN

442

T1C-C-AR-S-C10-0405 ST-01

LEVEL-72 GENERAL ARRANGEMENT PLAN

443

T1C-C-AR-S-C10-0421 ST-01

LEVEL-73 GA PLAN

444

T1C-C-AR-S-C10-0423 ST-01

LEVEL -73 & 74 SECTIONAL DETAILS-1

445

T1C-C-AR-S-C10-0422 ST-01

LEVEL-74 GA PLAN

MAIN CONTRACTOR

ARABIAN CONSTRUCTION CO.


STRUCTURAL STEEL CONTRACTOR

EVERSENDAI ENGINEERING L.L.C


Page 86 of 86